Once the production equipment breaks down, it not only involves the repair of the repairman, but also affects the production of the team. How to formulate the assessment rules for maintenance workers? The following are the assessment rules for maintenance workers, welcome to read!

Maintenance work evaluation rule 1

1, pay special attention to ideological education, so that all mechanical and electrical workers can clearly define the responsibilities of each post and establish the idea of serving the production line and putting safety first.

2. Underground power supply? Three no? No chicken scratching, no sheep tail, no joints? Two qi? (Cables should be hung neatly, and equipment protection devices should be neat). Insist? (Insist on working without electricity).

3, mechanical equipment is out of order, repair in time, all for the sake of production, be on call.

4. The generator set should always be in good condition. After the mains supply stops, the generator set can run normally for 5 minutes. If you are not responsible for your work, you should be investigated for economic responsibility if something happens.

5, underground electrician must be familiar with the structure, performance, working principle and operation method of all electrical equipment, strengthen patrol during duty, found abnormal, immediately deal with, ensure the normal production on duty, such as delayed production or more than 2 hours due to electrical failure, economic fines.

6, underground electrical equipment must pass the safety performance (explosion-proof, fire prevention) inspection before entering the well.

7. Be sure to hang up when there is high-voltage electrical equipment? High pressure danger, non-working personnel are not allowed to enter? Cards.

8, maintenance equipment and lines need to stop, when sending to have modes, are not allowed to leave, otherwise the consequence is proud.

9, when working at high altitude and wellhead, you must wear a seat belt.

10. It is not convenient to press the nearby maintenance knife. Should I hang it up? No power transmission? Cards.

1 1, it must be handled in accordance with the regulations, and it is forbidden to use open knives and open switches.

Maintenance work evaluation rule 2

In order to strengthen the management of labor discipline and ensure the normal and smooth progress of electromechanical work, the management system of maintenance team in electromechanical work area is formulated.

First, adhere to the safety policy of safety first, prevention first and comprehensive management. Always bear in mind that safety is paramount, firmly establish a sense of safety, and achieve "three no injuries, mutual insurance and joint insurance".

2. Strictly implement the eight-hour working day and go to work on time. The work and rest time for large classes is: 8: 00 am-12: 00 am and14: 00 pm-18: 00 pm. It is forbidden to be late or leave early.

Every morning at 8:00, roll call time, a member of Class One, is strictly forbidden to be late. Those who arrive late without reason will be fined 20 yuan every time. During the meeting, keep the meeting in order, and it is forbidden to whisper and make loud noises, which will affect the work arrangement. If there are any objections or questions about the division of labor, they will be raised separately after the meeting. According to the work plan, the leaders of the work area arrange the work that needs to be completed on the same day or temporarily assign tasks, convey the spirit of the meeting in the mine and emphasize the safety that needs attention.

Third, strictly implement the system of taking time off work. Those who need to take time off must apply to the monitor at least one day in advance, and can take time off only after the monitor agrees. In principle, it is not allowed to ask for leave directly from the district team management personnel, and those who ask for leave without reason will be fined 100 yuan each time. It is forbidden to leave your post without permission in class. If you really have something urgent to ask for leave, you must explain the reason and time of asking for leave to the monitor or the district team manager. Those who leave the mine without leave shall be treated as leaving the mine, and the attendance on the same day shall be deducted. If the accumulated leave time in the current month exceeds 8 hours, the attendance of one day in the current month will be deducted. The work arranged at the morning meeting every day and the temporary work arranged in the class must be completed on time with good quality and quantity, and reported to the arranger. Before leaving work in the afternoon, the work that can't be completed that day should be reported to the monitor in time to explain the reasons for the failure. If it cannot be completed without reason, the attendance on the same day will be deducted, and a fine will be imposed 100 yuan. Large work, multi-person collaboration, should be arranged and coordinated by the construction director to prevent laziness and prevarication. Because of the above reasons, the maintenance planning time will be affected. Except 50 yuan, the person in charge of construction, all participants were fined 30 yuan. When electricians and mechanics cooperate with each other, they should have clear responsibilities and help each other. They should not use the status of electrician or mechanic as an excuse to divide the workload. The charterer shall timely and carefully inspect the equipment he is responsible for, and put an end to cursory inspection. When problems are found, they should be handled in time and reported in time, so that small things cannot be done by individuals, and big things cannot be done by individuals.

Four, the rotating equipment for maintenance, maintenance must be cut off before the equipment power switch, locked and listed. The electrician is on the scene and is in charge of the work. The electrician was not at the scene, and the construction director was in charge of this work, which affected the work of other units. Before starting work, the supervisor shall apply to the Operation Department for work, and start work only after obtaining the consent. After the work is finished, he shall report to the dispatcher immediately, and shall not apply or end the report. The person in charge of each assessment is 50.

Yuan.

Five, abide by the duty system, maintenance workers, electricians on duty, shall not leave the mine without authorization, all kinds of dispatching telephone should be answered in time, temporary situation at night, after receiving the order, to the scene in time, to understand and solve problems, problems that can't be handled on duty, should be reported step by step in time, without delay, so as not to affect production. 20 yuan will be fined for not answering the phone once, and 200 yuan will be assessed every time he refuses to carry out the work arrangement after answering the phone.

Strengthen the maintenance of belt conveyor to ensure that the drum is not deformed or damaged, the bearing rotates flexibly, there is no shortage of oil, and the connecting screws are fastened reliably. Otherwise, 200 yuan, the responsible person, the motor and the connecting cylinder, and the connecting cylinder and the reducer must be connected securely every time. If any screw is found missing or loose after inspection, the responsible person will be assessed 20 points, and the belt shall not slip or run off during operation. If the belt and bracket are found to be worn, there will be buckles if they are not handled.

Six, for the management of large-scale equipment in charge of the work area, the person in charge should make regular inspections, keep abreast of the operation of the equipment, know the parameters and basic performance of the main fans, air compressors and air pumps, find out the hidden dangers and problems of the equipment in time, and report them in time if they cannot be handled. Daily maintenance, maintenance work to fine, fine, to ensure that the mechanical rotating parts are flexible, no shortage of oil, clean surface,

Seven, save materials and accessories, put an end to extravagance and waste, strengthen the management of consumables, processing errors caused by personal reasons, waste of materials, waste of labor and delay in work, depending on the seriousness of the case, were given a certain punishment, all kinds of instruments should be used sparingly, damaged without reason, according to the original price compensation, plus 20 yuan.

Eight, every afternoon before work, clean up the work site, put away the tools used, cut off the maintenance power supply, turn off the oxygen and acetylene bottles, lock the door in time in the maintenance workshop, do a good job of fire prevention and theft prevention, and clean up the work garbage produced in time after underground work.

Nine, unite colleagues, help each other, resolutely put an end to fighting and gambling, once found, immediately fired, it is strictly prohibited to take up posts after drinking, put an end to drinking in the class, immediately stop working after finding out, cancel the attendance that day, and impose a fine of 100 yuan. The above regulations should be strictly observed by all employees in the machine transport work area, and efforts should be made to build the machine transport work area into a solid team.

Maintenance work evaluation rule 3

In order to ensure the correct use and effective management of production tools, the following measures are formulated:

I. General principles

1. Purpose: To standardize the management of tools used by maintenance teams and professional maintenance personnel, and ensure the integrity of maintenance tools and the development of installation, repair and maintenance.

2. Scope of application: standardize the configuration standards, purchase, storage, collection, trade-in, transfer and scrapping procedures of various tools to avoid the phenomenon of excessive collection of tools and non-handover when personnel are transferred.

A. Personal tools: such as needle-nosed pliers, adjustable wrench, Allen wrench, ring wrench, electric pen, multimeter, hammer, etc.

B * * * Tools: such as hand electric drill, sledgehammer, manual grinding wheel, etc.

C professional tools (large tools): such as oscilloscopes, vibrating tables, lathes, etc.

Second, formulate tools distribution standards.

1. The equipment support department shall formulate a tool distribution system according to the needs of the team to use tools.

Third, responsibilities:

1. Equipment Department is responsible for the procurement, distribution control, account management and irregular supervision and inspection of daily use of maintenance tools.

2. The workshop monitor is responsible for the registration, accounting, guidance, supervision and inspection of the maintenance tools (including personal tools and public tools) belonging to this department.

3, the mechanic, designated male * * * tools (responsible person) is responsible for my use, responsible for the custody and maintenance of tools, reasonable and correct use.

Four, management regulations:

1, maintenance workers shall be equipped with personal tools by the monitor according to their work needs. Personal tools are kept by yourself.

2. Tools, large tools and professional tools used in the workshop. The person designated by the monitor is responsible for the custody.

3. All tools must be registered and set up, and a workshop tool ledger must be kept in the workshop. If the tools are lost, the responsible person shall make full compensation.

4. The equipment department and workshop team should check the storage and use of tools from time to time to ensure that the accounts are consistent, the tools are complete and reliable. And register in the tool account. The custodian (responsible person) shall pay full compensation for abnormal damage or loss of tools or failure to provide complete old tools.

5. After the original tools are damaged normally, the intact old tools must be returned and the new tools recycled according to the principle of replacing the old tools with the new ones. Please fill in the purchase requisition and sign it by the department head for approval.

6, new maintenance workers, new production lines need to be equipped with tools, by the monitor to fill in the configuration application form submitted to the equipment department, the leadership of the unified purchase configuration after approval. The new configuration tool needs to be registered and recorded, and the custodian (person in charge) can be appointed before it can be distributed to individuals.

7. When tool users and custodians (principals) adjust their posts or leave their posts, they must return all the tools under their names to the team before leaving their posts. After receiving the returned tools or redistributing them to others, the team should first

It's time to update the tool account. If it is found that the accounts are inconsistent and the contents are untrue, the equipment department will deduct points in the quarterly work assessment of the team. 8, recycling damaged old tools, the equipment department is responsible for the inspection, such as can still be used, please recipients continue to use. If it can be repaired, contact relevant professionals for repair. If it is really beyond repair or has no repair value, it can be scrapped and new tools can be purchased and replaced in time.

Verb (abbreviation for verb) borrowing tool

1. In order to facilitate the borrowing of public tools, the person in charge of the equipment has a common operator to borrow, and the borrowing form must be filled in when borrowing.

2. Borrowing and returning procedures:

I. Tool borrowing must be filled in? Tool borrowing form? , explain the borrowing time, return time, use, storage responsibility, etc. , signed by the leader on duty before borrowing.

B the lending team leader is responsible for the return of the lending tools. In case of loss or damage, the team leader who agrees to lend shall bear the corresponding liability for compensation.

C. was the shift supervisor there when the tools were returned? Tool borrowing form? Sign for confirmation.

Verb (abbreviation of verb) supplementary clause:

1. This management method is applicable to all workshops and departments of the company.

2, the management measures shall be implemented as of the date of promulgation.

Guess you are interested in:

1. Maintenance personnel job evaluation rules

2. Maintenance personnel evaluation rules

3. Personal year-end summary of auto mechanic

4. Summary of performance evaluation