Work Summary of Project Construction 2022 1
A, project overview and files:
Fu Nan No.1 Road and Bridge Reconstruction Project is loc
Six Summaries of Engineering Construction in 2022
Work Summary of Project Construction 2022 1
A, project overview and files:
Fu Nan No.1 Road and Bridge Reconstruction Project is loc
Work Summary of Project Construction 2022 1
A, project overview and files:
Fu Nan No.1 Road and Bridge Reconstruction Project is located at the intersection of Jiujiang Avenue, Chongqing Ring Expressway and Jinma Avenue in Shuang Fu New District, jiangjin district. It is 2 kilometers away from Zouma exit of Chengdu-Chongqing Expressway, 0/0 minute drive from Chongqing Inner Ring Road and only 35 minutes drive from Jiangbei Airport, with convenient transportation.
The standard road is 24 meters wide and has four lanes in both directions, and the distribution is: 4 meters (sidewalk)+16 meters (roadway) +4 meters (sidewalk).
Road grade: urban secondary road.
Pavement grade: standard axle load of advanced pavement (asphalt concrete pavement): bzz- 100 Design life: 12 Design traffic grade: intermediate.
Owner: Chongqing Shuang Fu Construction Development Co., Ltd. Quality Supervision: Chongqing jiangjin district Construction Engineering Quality Supervision Station.
Design unit: China Huaxi Engineering Construction Design Co., Ltd. Chongqing Branch Supervision unit: Chongqing Fukang Engineering Construction Supervision Co., Ltd. Construction unit: Chongqing Degan Construction and Installation Engineering Co., Ltd.
The leaders of our company attach great importance to archives work and have formulated a perfect archives management system. The leaders of our company visited the construction site for many times to inspect and guide the archives work. In order to ensure the smooth completion of the project files, the company specially equipped the project department with three necessary office supplies, three computers and a 1 printer, and cultivated and attached importance to the file quality. In the data management project, the archives group has made the data management plan, formulated the practical implementation rules of file management, and specifically formulated the key points of project completion data control.
Second, the data formation:
According to the requirements of municipal engineering completion technical documents, the archives group is responsible for the numbering, registration, distribution and storage of technical documents of the project department, and is responsible for the collection and accumulation of completion data.
The original data of completion are formed as follows:
1, the project quality evaluation data is jointly formed by the project technical director and the quality inspector.
2. The test data are extracted by the site administrator, sampled by the supervisor and sent to the laboratory for test according to relevant regulations. The laboratory forms data according to the test results and returns two original data to the project department. Summary table and evaluation table are composed of office librarians and technical leaders.
3. When the materials enter the site, the manufacturer shall provide the quality guarantee of the raw materials. After receiving it, the material clerk shall hand it over to the archivist for filing in time, and the technical personnel in the industry shall summarize and sort it out.
4, the construction technical disclosure records formed by the project builder, documenter.
5, hidden inspection data, construction records, formed by the builder according to the actual situation, supervision, quality inspection station, design institute, geology and other relevant units after signing to the archivist.
6. As-built drawings shall be provided by the construction party with first-hand on-site information, and the as-built drawings shall be changed by the office after being reviewed by the technical director.
In the process of collecting and sorting files, this project adheres to the principle of synchronization with the progress of the project, and completes the collection and sorting of various technical disclosure records, earthwork construction records, concrete pouring records, hidden inspection and tensioning records of steel bars, and material certificate materials before construction. In the process of construction, fill in all construction records, concealed acceptance records and inspection records in time, carry out all tests according to the requirements of the specification, and sort out the records in time. All records are timely, accurate and true. When compiling the as-built drawings, it is necessary to compile the as-built drawings in time according to the hidden records and technical change negotiation documents after the completion of each division and sub-project, so as to ensure that the as-built drawings are visible, tangible, clear and accurate, and ensure the accuracy, timeliness, systematicness and authenticity of the internal quality of the as-built drawings. When collecting, sorting, summarizing and binding files, it should be carried out in strict accordance with the relevant requirements of the "Chongqing Construction Project Archives Special Acceptance Measures" and Chongqing Urban Construction Archives to ensure the completeness, accuracy, truthfulness and completeness of the files. Shuang Fu New District Fu Nan Road and Bridge Reconstruction Project * * * forms a set of project files, each of which includes documents, as-built drawings and photo albums. Hand over * * * copies to Party A, including written materials, as-built drawings and photo albums; Handed over to the archives, * * * copies, including written materials, as-built drawings and photo albums; The construction unit shall keep * * * copies, including written materials, as-built drawings and photo albums.
Iii. Features of the project document:
1. According to the actual situation, the project archives team collected the guarantee materials and written materials respectively by two people, and the special person was responsible for the comprehensive inspection, which basically completed the tasks required for file sorting.
2, around seeking truth from facts to form information production work style, do not engage in "memoirs", do not engage in false information.
3. The data written by the filing group is standardized and written in print.
This document is written in blue and black ink.
Four. The work of the Archives Section:
Several comrades in the archives group pay attention to unity and cooperation, often study the requirements of archives arrangement together, and give full play to their respective expertise to ensure timely and accurate archives acceptance after the project is completed. If you have any questions you don't understand, ask the comrades in the archives for advice. If you really don't know, please ask them to personally guide the work.
Emphasizing the importance of archival work, with the support of the project manager, the archival team boldly manages the work, insists on handling it according to the requirements of archival management, and recognizes the facts clearly, so that the information formers have a further understanding of the current information management situation.
During the construction of this project, the project department has been inspected by the superior management department for many times, and the files have been affirmed by the relevant leaders. We strive to make persistent efforts in the future work, so that our project archives work will continue to move to a new height.
Verb (short for verb) self-evaluation:
On September 5th, 20xx, the technical department of the company inspected my site files. After consulting the relevant personnel of the company, the staff of the archives group made a self-evaluation of the on-site archives, and the archives of this project basically reached the "qualified" level.
Experience and summary of intransitive verbs
1, dealing with the relationship with the builder, quality inspector, material supervisor, test and other relevant departments is the key to the smooth implementation of archival work. In the process of file management, we must deal with the relationship with the builders, quality inspectors and other data formers in accordance with the principle of "cooperation and mutual assistance".
2. You must have a high professional level to convince others and establish the prestige of file management. First of all, we should improve our skills, go to relevant departments for file training, and be sure of everything in file management.
3. When the project starts, it should be arranged in strict accordance with the requirements of archives and high-quality structural standards, so as to reduce the influence of some adverse factors on archives work in the construction process.
4. Fully understand the role of archival work in the utilization value of projects and projects, and be sure to manage archives well.
Seven. Future work plan:
1. From now on, we should focus on the optimization of file management. We should study hard, digest the relevant contents of file arrangement, exchange opinions with owners and archives, and improve our own ability.
2, organize relevant information forming personnel to learn, through careful work, strictly pay special attention to the concealed engineering and process handover acceptance, pay special attention to the material test work, participate in the construction scheme and construction technical disclosure work, to ensure that the information can be further improved in the next step.
Eight. Conclusion:
In the process of collecting and sorting out the project files, this project has received strong support from the contractor, the supervision unit and the higher authorities, especially the leaders and teachers of the urban construction archives have visited the site for many times to guide the work. I would like to express my heartfelt thanks here!
Summary of engineering construction in 2022 II
How time flies! How time flies! I have been working in the company for half a year. This half year is an important journey in my life. During this period, with the help of leaders and the care and support of colleagues, I gradually completed the dual transformation and adaptation of this environment and role from surveying and mapping engineering to engineering department, from university to xx high-grade highway construction corporation. At the beginning and end of the year, I meditated on my work and life in the past six months and gained a lot. Now I will summarize my study and work in the past six months as follows:
I. Work:
In July of xx, I was lucky enough to work in xx High-grade Highway Construction Corporation and was assigned to theNo. 13 bid section of xx subgrade project. The engineering department is the leader of the company, mainly responsible for the management of planning and measurement. Engineering can exercise people and learn a lot at the same time. In this half year's study and work, I have learned the names of various parts of the bridge, learned a part of the highway drawings, mastered the relevant contents of the industry, and the sorting methods and laws of the completion data. During this period, I learned a lot and summarized some shortcomings. I need to work harder to learn relevant knowledge, go to the scene to learn more, and learn more on the spot. So in the next year, I am not afraid of the wind and the sun, and I have the opportunity to study more on the spot. Consciously strengthen study, learn from theory, learn from professional knowledge, learn from colleagues around you, gradually improve your theoretical level and business ability, overcome young impatience, be down-to-earth, improve your work initiative, be not afraid of many things, be not afraid of small things, and improve and improve yourself in bit by bit practice.
Second, the ideological aspect:
First of all, consciously strengthen political theory study and improve party spirit cultivation. The strong political learning atmosphere in the company deeply infected me. I actively participated in various learning activities organized by the company, paid attention to self-study and studied hard, further improved my theoretical level and political quality, strengthened my sense of honesty and self-discipline, and wrote an application for joining the party and an ideological report, hoping to join the ranks of the China * * * production party as soon as possible, and implored the company and the party to test it. Consult colleagues modestly at work and actively consult when encountering problems, which can be well solved. There is still a lot to learn in the future, so we should persevere.
Three. Xx year work plan:
This year, we mainly manage the completion data. Although I don't know much about it, I humbly ask the leaders to improve this aspect. At the same time, in the engineering department, I obey the arrangement of the leader, conscientiously complete the tasks assigned by the leader, and obey the arrangement of the organization.
The company's five reforms and five innovations have been well implemented, and we will continue to carry out the project of "comparing progress and creating image"; Compare quality and build high-quality projects; Create a cleaner government project than project management; Create a safer project than safe production; Compared with civilized construction, create a harmonious project. "
The above is a summary of my work for half a year. In the future, I will be down-to-earth, make achievements in this fertile land of xx high-grade highway construction corporation, and contribute my youth to xx high-grade highway construction corporation.
Work Summary of Engineering Construction in 2022 3
I entered the project management department of the company through recruitment on June 65438+February 10, xx. From the engineering construction unit to the engineering construction unit, although my job position and role have changed greatly, it is also my first time to contact the budget quota of Zhejiang construction project, but with the care of the leaders and the help of my colleagues, with my professional foundation and work experience, plus hard study and research, I quickly adapted to the working environment and achieved good results. This work is briefly described as follows:
First of all, personal introduction.
1September, 1996 to1July, 1999, majoring in engineering cost in Hunan Urban Construction College. 1From July, 1999 to July, XX, I worked in the Fourth Engineering Co., Ltd. of China Railway 19th Bureau Group, engaged in budgeting, contract management, bidding management, etc. Xx years 10, participated in and passed the national cost engineer qualification examination.
II. Main achievements and achievements
1, strictly abide by the company's rules and regulations. At the beginning of my work, I carefully studied the Vico outline, the daily code of conduct of employees in the real estate sector, the basic management system, the job function description and other rules and regulations, and kept them in mind, reminding myself to strictly abide by the company's rules and regulations and maintain the company's image. For example, come to work early every day, clean the office and create a clean working environment for colleagues.
2. Seriously study the budget information of Zhejiang Province. Although the principle of budgeting is the same, the "Zhejiang Construction and Installation Engineering Quota" is very different from the highway and railway engineering quotas that I used to contact more. Therefore, I first made a serious and systematic study of the budgeting materials in Zhejiang Province, and insisted on learning by doing. I quickly mastered the essentials and was able to complete the tasks assigned by the leaders independently. At the same time, in my spare time, I also learned to use "clever software" to prepare budget and "Luban software" to calculate steel bars, which greatly improved work efficiency. In the future work, I will continue to explore and learn, and make my work more detailed and perfect.
3. The final accounts audit of winding workshop and temporary works of Vico Flavor Group Co., Ltd. Dunhuang Branch is progressing smoothly. Although the winding workshop and temporary works have been completed for a long time, the relevant completion information is very incomplete, which brings great difficulties to the final accounts audit. After I took over this job, on the one hand, I actively asked the construction unit to improve the completion data, on the other hand, I used the existing data to count the number of projects and check all the data. In order to accurately grasp the engineering situation and ensure the accuracy of calculation, I also went to the site to take a closer look. Through my efforts, this work is progressing rapidly at present, most of the materials needed for the final accounts audit of the project have been collected, and the budget of the winding workshop has been checked with the construction unit.
4. Actively start the civil audit of the commercial and residential building on plot 5 of Huayan Street. After the leader arranged for me to be responsible for the civil budget audit of the project, I took the time to familiarize myself with the construction drawings and related materials, and went to the construction site several times to understand the situation, so that I could master the static and dynamic situation of the project in the shortest time. In order to better safeguard the interests of the company and gain the initiative in final accounts, I have advanced the calculation of engineering quantity to the present stage. After a period of intense and orderly work, the calculation of some quantities in the basement has been completed. In addition, I also carefully completed the review of the progress payment budget of XX 65438+February and 65438+ 10, and the contact list of the previous projects, in which the budget was reduced by xx 46. 132 1 10,000 yuan and xx 16.
5. Other aspects: ① Actively put forward reasonable suggestions to leaders, such as cost control and data management; ② Actively discuss cost control, contract management and data management with colleagues. Through discussion, not only the friendship between colleagues is enhanced, but also the professional ability is improved; ③ Actively communicate with colleagues and help others enthusiastically; ④ Take an active part in various activities organized by the company, such as studying in party member and performing in the Spring Festival Evening.
Third, the direction of efforts
1, make full use of the advantages of passing the national cost engineer qualification examination and previous work experience, actively contact with various related businesses, improve their practical operation ability, and make their due contributions to the brand building of the company;
2. Actively participate in the self-taught undergraduate examination, learn professional skills, and improve business ability and professional level;
3. Play the vanguard and exemplary role of party member and strive to be advanced.
In short, although I have made some achievements in the past three months, there is still a certain gap from the requirements of the leaders. In the future, I will further strengthen my study, work hard, give full play to my personal advantages and make due contributions to the company's further success.
Work Summary of Engineering Construction in 2022 4
I have been engaged in quality inspection since I graduated in 20xx, and I have formed a certain working mode for quality inspection. On May 6th, 20xx, new challenges stood in front of me, and life was full of challenges. So as not to regret the memory because of mediocrity.
How time flies. In a blink of an eye, three months of life have passed. In the past three months, I have learned a lot and seen my own shortcomings. Now my work in these three months is as follows:
Yu Long Coal Chemical Industry Phase II Project is under construction. According to the site construction requirements, the material supply is divided into Party A (materials purchased by Yu Long Coal Chemical Industry) and Party B (materials purchased by the construction unit).
I. Logistics of Party A ..
The engineering department and the construction unit put forward the material demand plan, which is examined and approved by the equipment department, evaluated according to the warehouse situation, pre-tender estimate and construction needs (provided by Party A or purchased by the construction unit), and reported to Henan Yu Long International Trade Co., Ltd. and the material management center Henan Yu Long International Trade Co., Ltd. and the material management center on the 20th of each month for examination and approval (self-purchasing or unified purchasing) to select manufacturers and review their qualifications. Answer technical questions and unify technical requirements, sign the shortlisted supplier recommendation form (department, finance, enterprise management, supervision and leaders in charge), determine the bidding time and place, and notify suppliers and enterprise management department (enterprise management department is responsible for selecting bidding judges, and the judges should be odd. ) The judges and suppliers should sign in at the bidding meeting. First of all, we should explain the subject matter and clarify the technical requirements. The supplier shall clarify the technical problems and submit the first quotation (indicating the delivery time and payment method) to the supervisor. The supplier should vote for the second quotation (no one can view the quotation without permission). Within 7 working days after the signing of the technical agreement, notify the winning supplier to sign the contract (the winning supplier shall pay the service fee for winning the bid), place the order contract, follow up the inspection (the planner, keeper, engineering technicians, inspectors and suppliers shall be present), and pay by hanging the invoice (the contents of the invoice issued by the supplier shall be consistent with the contract).
Precautions:
1, the supplier name must be clearly and correctly written;
2. Technical issues should be unified before bidding;
3. Before bidding, be sure to ask the supplier whether there are unclear matters and whether they can attend on time;
4. Check the material items and prices when signing the contract, and make clear the specifications of each item, so as not to delay the follow-up work.
II. Materials provided by Party B ..
The materials purchased by the construction unit according to the construction requirements are called B-supply. In order to control the quality and budget of the project, it is necessary to determine the quality and price of materials supplied by Party B.. Quality identification and price identification require the construction unit to provide corresponding contracts, invoices, price identification application forms and material declaration forms. Recognition of quality and price should be divided into two parts: recognition of quality and recognition of price. Quality recognition is to test the quality of the project, and price recognition is to verify the price of the materials used to see whether the amount declared by the construction unit meets the actual market price and is within the budget. Quality recognition and price recognition should be consistent with self-procurement, and attention should be paid to avoid false reports of some suppliers and price affecting price recognition during the inquiry process.
Third, joint bid.
Joint bidding is a bidding method in which the construction unit organizes the owners to participate. Both parties can recommend suppliers. Only bidding can alleviate the owner's capital problem and reduce some unnecessary friction between the construction unit and the owner. The bidding contract signed by the supplier and the construction unit will be joint. However, the owner has the obligation to ensure that the funds are in place. joint bid is a kind of price recognition, so it is necessary for Zhang, the development planning department of the company, to participate. The form of joint bidding is basically the same as that of self-bidding. One thing that joint bid should pay attention to is that there must be more judges of the owners than the construction units.
This is my main job in the past three months. During these three months, I found that I still lack the ability of organization and coordination, which is the key aspect of my next study. Supply work, whether it is just the work of buying things, is the basis of supply work, and we should learn how to buy good and cheap materials. The supply work also needs to grasp the market price and market dynamics in time, and form a unified system of price system and various material suppliers.
Supply work is the source of a company, and it is also related to whether the company can run safely for a long time, so supply work must avoid selfishness and have a fair and just heart.
Supply work has to face suppliers every day, which is another indispensable link in supply work. If the supply work lacks suppliers, the supply work is equivalent to the lack of walking legs.
Chapter 5 Summary of Project Construction 2022
The project is located in Fengxian Road, Shengmingba. The project is a frame structure, which functions as an underground garage (83 parking spaces) in peacetime and a shelter for second-class personnel in wartime. The main body of the proposed project is underground, and there is a mezzanine (dressing room) under the local square dance stage. The storey height is 4 and 5m, and the building area is 4 137 and 88. The engineering grade is Grade II, the structural design service life is 50 years, the structural safety grade is Grade II, the seismic fortification is 6 degrees, the garage fire protection grade is Grade III, the fire resistance grade is Grade I, the main body waterproof grade is Grade II, and the power station waterproof grade is Grade I. ..
Since the project started, the leaders of the company have attached great importance to the archival work, formulated a perfect archival system, subdivided and comprehensively arranged the archival materials to ensure that the archives and construction are synchronized and true. In order to ensure the quality requirements of filing materials, the company has specially equipped computers, printers, copying and scanning machines, paper cutters, bookbinding machines, page numbering machines, digital photo/(camera) machines and other equipment and office supplies to make the quality of archives more standardized.
In the process of collection and arrangement, the project files are strictly implemented in accordance with the requirements of national Chongqing local standards. With the strong support and help of the leaders of Wanzhou Urban Construction Archives in Chongqing, and with the attention of the owner, the supervisor and the person in charge of construction, during the construction of this project, the materials quality assurance data and test data are complete, and all kinds of hidden data, construction records and functional test data are complete, all of which are filled in with the progress of the project under the supervision of the owner and the supervisor, with complete signing procedures, neat handwriting and complete content. Data should be synchronized with the project, and the formation of project archives should meet the requirements of archives management and acceptance standards.
When the project starts, the full-time librarians of this project will collect the project data in strict accordance with the acceptance criteria and the requirements of files. Organize the work and strive to realize the standardization of data archiving. After collection, the information is reported as follows:
The project has now completed * * * sets of files. Hand over * * copies to the owner, including written materials, as-built drawings, * * copies, photo albums and * * copies.
The formation, collection and perfection of archives from the start to the completion of the project. Have received strong support from superiors. Without the guidance, care and coordination of leaders, the difficulty of archival work can be imagined. The archival arrangement of this project has benefited us a lot and accumulated valuable experience and wealth for the archival arrangement of the next project. I would like to express my sincere thanks to all teachers and leaders!
Summary of Project Construction 2022 6
Participated in the construction of Jingba Road Project, xx Road Project, xx Road Project, xx West Road Project, xx East Road Project and xx Project. I joined the work in xx month and worked in the development zone of XX port area. At present, I am responsible for the data collation of bt project construction in the port area in xx, and have served as a student, librarian, contract administrator and political worker.
During my work as a documenter in the construction technology department, I was meticulous and conscientious. The main work includes:
1, cooperate with various professional engineers to strictly control engineering data. Because the engineering data truly reflect the achievements of engineering construction, and the data are various forms of information records formed in the process of engineering construction, only by fully cooperating with other professional engineers can this work be completed and done well.
2, responsible for the management of construction data, as well as the collection, sorting and archiving of construction data. Construction data is a real record in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal construction work.
3. Prepare meeting minutes.
4, according to the data sorting program will be included in the scope of urban construction archives to xx building archives. Only when all the previous links are done well can the files be handed over smoothly.
The South Ring Road project undertaken by us is not only of excellent quality, but also adds a beautiful landscape to the port area in appearance. During the construction of xx road project, I actively cooperated with leaders and technicians, and formed a good working relationship with the construction unit and supervision unit to ensure that the information could not be signed.
In response to the "Safe Site Creation Activity" of 20xx City Planning and Construction Bureau, I was accepted as the "Safe Site Leading Group" and became one of the main leaders of the activity. The "Safety Site Creation Account" that I am responsible for has been well received by the project department and the company leaders, and has been recognized by the superiors at one time, which has gained positive influence for the company. Later, he was also responsible for activities such as "one law and three certificates" and "creating a civilized construction site". The construction materials and completion materials of the four projects I participated in or were responsible for were completed on time, seriously and with high quality, which laid a good foundation for the timely completion and final accounts of the projects. Therefore, it has been praised by the leaders of the project department and the construction technology department for many times.
In addition, in the process of project construction, I am also responsible for the contract management of the project. There are many labor contracts that need to be re-signed by the unit and centralized management of migrant workers, which has taught me a lot. During my work, I keep learning and improving my professional skills and practical experience, hoping to do better in my future work.
- Previous article:Introduction of Zhangping small fishing net
- Next article:What are the most likely risks caused by hot metal leakage in cupola?
- Related articles
- Why doesn't Shounong Group recruit people?
- How to get to Qingdao Ruihua Physical Examination Center from Xiaogang, Shibei District, Qingdao by bus?
- Jilin University Bionics Science and Engineering Institute Class B Personnel Agency Recruitment Notice
- Is junfeng high-speed rail recruitment true?
- Summary of practice of Chinese pharmacy in traditional Chinese medicine hospital
- How about Anji Small Snail E-commerce Co., Ltd.
- Zhushan Desheng Shijiahe Mine steals cables.
- How about Wuhan Haier Industrial Park?
- How to register for military and civilian examinations?
- Chongqing Lihua shutter doors and windows factory: building high-quality shutter doors