1: overall design.

Design is very important.

Not to find some pictures on the internet to piece together for you.

Design is your overall planning before construction, and it faces many problems such as water and electricity layout, furniture location layout, modeling design, color matching and so on.

Good design can greatly reduce the rework rate in the future.

2. Change the water and electricity.

The positions of switches and sockets reserved in the project are unreasonable and too few.

It is recommended to find a professional plumber, preferably separately.

Because only in this way can there be quality assurance.

The cost of changing water and electricity must be saved, so make good use of materials, because it will be hidden in the wall and underground in the future, and it will cost manpower and money for later maintenance.

3: Tile paving.

It is recommended to choose Guangdong tiles, which are of good quality and have no peculiar smell.

This not only ensures the quality, but also does not harm the health.

4: Woodworking enters the site.

All kinds of top surface modeling, plaster line, TV wall modeling, paint cabinet, paint-free cabinet, etc. It can be done by a carpenter.

In the construction process of our company, this step is generally to hang the integrated ceiling at the same time, which needs to be selected in advance.

5. Wooden door selection, cabinet making and bathroom installation.

After the carpenter leaves, the wall scraper can enter the site for leveling and initial scraping.

Wooden doors need to be selected at this time because it takes a long time to make. If it is a cabinet produced by the factory, you need to choose it at this time, and the bathroom can be installed after hanging the integrated ceiling.