Job Recruitment Website - Job information - How much is the salary of aluminum formwork installer?

How much is the salary of aluminum formwork installer?

It's hard to do aluminum formwork work and the salary is high. Workers install a square meter about 19 yuan, and earn about 400-500 yuan a day.

(Knowledge extension): Why should aluminum alloy formwork be used in building construction?

The surface quality of concrete is flat and smooth, which can achieve the effect of plastering-free.

Aluminum alloy building formwork has high strength, high precision and few flat joints.

The construction is convenient, and the aluminum alloy building formwork is convenient to assemble, which can be assembled manually or hoisted by machinery after being assembled.

Standardized construction, high turnover times, and normal use can reach 300 times.

Wide application range. Use aluminum alloy building formwork, wall formwork, horizontal floor slab, column, beam and climbing formwork.