Job Recruitment Website - Job information - Tianjin Huaneng Yangliuqing Thermal Power 20 14 Campus Recruitment Notice

Tianjin Huaneng Yangliuqing Thermal Power 20 14 Campus Recruitment Notice

Tianjin Huaneng Yangliuqing Thermal Power Co., Ltd. 2065438+2004 College Graduates Recruitment Announcement

Tianjin Huaneng Yangliuqing Thermal Power Co., Ltd. (hereinafter referred to as "power plant") is located in Yangliuqing Town, Xiqing District, Tianjin, 6.5 kilometers east of Tianjin, adjacent to Jinpu Railway in the south, Jingfu Highway in the west and Ziya River in the north, with superior geographical position and convenient transportation. The power plant is located in the load center of Beijing-Tianjin-Tangshan power grid and is an important support point of Tianjin western power grid. Power is transmitted to Beijing-Tianjin-Tangshan power grid, mainly for local use, accounting for 1 1.48% of the installed capacity of Tianjin unified dispatching units. At the same time, the power plant provides central heating to Tianjin, with a heating area of 22.4 million square meters, accounting for about 26.98% of the heating area of Tianjin cogeneration.

The power plant was built in August, 197 1. There are four phases of the project, of which four fuel units in the first and second phases have all been shut down and scrapped. At present, the units in service in the power plant are in Phase III and Phase IV, with a total installed capacity of 1200MW. A 2×300MW coal-fired extraction steam heating unit was installed in the third phase of the project, which was put into operation in1February 1998 and1September 1999 respectively, with an annual designed power generation of 3.9 billion kwh and a designed heating area of 7.6 million square meters. The third-stage boiler is a domestic liquid slag discharge furnace, and the fly ash is re-ignited, which is characterized by good emission index. The fourth phase of the project installed a 2 ×300MW coal-fired extraction steam heating unit, which was put into operation in February 2006 and May 2007, with an annual designed power generation of 3.3 billion kWh and a designed heating area of 6.5438+0.2 million square meters.

The gas turbine project is the fifth expansion project of the power plant based on the existing 4×300MW coal-fired heating unit. 1 900MW F-class gas-steam combined cycle heating unit is built in this project, with an installed capacity of 9,509,800 kilowatts. The project is planned to start construction in 2065,438+04 and be completed and put into operation in 2065,438+06.

Power plants always adhere to the purpose of "three-color company", always adhere to safety production as the basis, economic benefits as the center, deepening reform as the driving force, and scientific and technological progress as the means to constantly change ideas, innovate management, and rapidly improve the level of production, operation and management. The main technical and economic indicators have reached the advanced level of similar units in China. The power plant aims at building Huaneng Tianjin window unit and striving for excellent Huaneng power plant, and strives to build first-class equipment, first-class performance, first-class management, first-class team and first-class environment. We urgently need to inject more fresh blood, and I believe ambitious college students are also waiting for such an opportunity. This is a broad stage for you to achieve your career and realize the value of your life. Welcome to join us!

First, recruit majors.

Major in power system and automation, thermal energy and power engineering (including centralized control operation), automation, mechanical engineering and automation, power plant chemistry and environmental engineering.

Second, the basic conditions of the application

1. The graduates of the 20th14th class, who are trained full-time by ordinary colleges and universities nationwide, have college education or above. Undergraduate graduates should be graduates of first-class and second-class undergraduate colleges (both of which are headquarters, excluding independent colleges), and college graduates should be graduates of electric power colleges with professional counterparts;

2. The English level of undergraduate graduates has reached Level 4, and the English level of junior college graduates has reached College English Level A, with a certificate of achievement.

3, excellent academic performance, no failure, skilled computer operation.

4, good performance in school, abide by national laws and regulations, social morality and professional ethics, decent style, no punishment, no record of bad behavior, no problems left over from history.

5. Good health.

Third, the materials needed for application and registration.

1. Resume (including photos) and copy of ID card;

2, graduates employment recommendation form;

3. Effective comprehensive transcripts issued by the school;

4, English, computer grade certificate (with national English level 4 or above, skilled computer operation ability);

5, all kinds of award certificates;

6. Other relevant materials that can prove your education and ability.

Fourth, the registration method

Online registration is adopted. Candidates log into the recruitment system of Huaneng International Power Co., Ltd., register users first, then log into the system, and complete the online registration procedure according to relevant information.

Registration Tel: 022-84505368

The deadline for registration is 2013123116: 00.

Verb (abbreviation for verb) Other matters

1. The applicant should fill in the application form truly and completely. If they conceal important facts or provide false information, they will bear the consequences.

2. For students who have passed the qualification examination, the power plant will organize written examination and interview examination respectively.

Recruitment date: 2013-1-06 ~ 2013-12-3.