contract agreement
Contract Agreement 1 Party A: Lingshi Huaying Jintaiyuan Coal Industry Co., Ltd.
Party B: Jinzhong Wei Hui Electric Power Engineering Co., Ltd.
Client: Lingshi Huaying Jintaiyuan Coal Industry Co., Ltd. (hereinafter referred to as Party A) Trustee: Jinzhong Wei Hui Electric Power Engineering Co., Ltd. (hereinafter referred to as Party B).
In order to ensure the safe, economical and stable operation of all the 35 kV transmission lines of Jintaiyuan owned by Party A and improve the health level of power transmission and transformation facilities, Party A hereby entrusts Party B to operate, maintain and overhaul the power transmission facilities with reference to the relevant regulations and standards of the national power industry. Through equal consultation, on the basis of clarifying the rights and obligations of both parties, this Contract is hereby concluded in accordance with the Contract Law of People's Republic of China (PRC) and relevant laws, regulations and rules.
Article 1
1. 1 Party A shall guide, supervise and evaluate Party B's work, create conditions to support Party B's operation, maintenance and overhaul of Party A's transmission facilities, and pay corresponding expenses to Party B. ..
1.2 Party B shall operate, maintain and overhaul Party A's transmission lines in accordance with the provisions of People's Republic of China (PRC) Electric Power Law, Electricity Regulatory Regulations, Power Grid Operation Rules (for Trial Implementation) and Power Grid Dispatching Management Regulations, and with reference to relevant national standards in the power industry.
Article 2 Scope of entrusted assets
2. 1 The transmission line scope entrusted by Party A to Party B for operation, maintenance and overhaul includes:
(1)35kV line, leading from Anshun 220 kV substation and Gongjiazhuang.
1 10KV substation outgoing line (Anshun switch number and Gongjiazhuang switch number. ) and the incoming line of Jintaiyuan 35 kV substation (Anshun SwitchNo. 1 1 and Gongjiazhuang Switch No.2) have the conductor model of LGJ- 150/25, and the grounding wire adopts GJ-35 galvanized steel strand. The cable model YGV-3*300 has a total length of 26 kilometers and 93 towers.
(2) The total length of the maintenance line is 26 kilometers, calculated at 48,000 yuan per kilometer.
2.2 Contract terms:
The contract term is *** 3 years, from April 1 day of 20xx to April 1 day of 20xx.
Article 3 Rights and obligations of Party A
3. 1 Party A's rights
Guide, supervise and evaluate Party B's work.
3. 1.2 Dissolve the entrustment relationship with Party B according to the law or the agreement in this contract.
3.2 Obligations of Party A
3.2. 1 Pay the expenses agreed in this contract to Party B according to this contract and relevant regulations.
3.2.2 Provide Party B with a complete set of practical data on the design, installation, commissioning, testing and completion acceptance of transmission lines.
3.2.3 Provide necessary conditions for Party B to carry out the work, and designate the work contact person. If the route needs to be changed due to geological changes, Party B shall be informed in advance, and Party B shall be responsible for the implementation, comprehensive acceptance and control of quality and parameters. Party A shall not change the route at will, and Party B shall not be responsible for changing the route without authorization.
Article 4 Rights and Obligations of Party B
4. 1 Party B's rights
4. 1. 1 Charge the contract fee to Party A according to the contract.
4. 1.2 Party B has the right to refuse to carry out Party A's requirements that violate the relevant national and power industry regulations on safe operation.
4.2 Obligations of Party B
Party B shall carry out the following work on the assets specified in Article 2 of this contract according to this contract.
4.2. 1 Operating obligations
4.2. 1. 1 Relevant rules and regulations shall be established and implemented with reference to relevant standards on overhead line operation procedures and management in power industry.
4.2. 1.2 should be equipped with corresponding personnel, tools and equipment.
4.2. 1.3 Establish and improve the account information of data related to entrusted assets operation.
4.2. 1.4 Be responsible for the equipment operation analysis of entrusted assets, analyze and evaluate their overall conditions in time, and put forward specific rectification suggestions to Party A for major defects.
4.2. 1.5 The management of equipment defects should be strengthened, classified according to the severity of equipment defects, recorded and eliminated in time. Unless otherwise specified in this agreement, defects refer to general defects, not major defects.
Maintenance obligation.
4.2.2. 1 The daily maintenance of entrusted assets shall be carried out in accordance with the basic requirements of relevant power industry standards and regulations.
4.2.2.2 should carry out entrusted assets inspection and master transmission lines.
Operation situation, find out the defects and surrounding conditions of the line in time, and provide relevant information for line maintenance.
Check types in 4.2.2.3:
(1) Regular inspection: the entrusted assets shall be inspected once a month, so as to know the operation conditions of all parts of the line and the surrounding conditions along the line, and discover defects and threats to the safe operation of the line in time.
(2) Fault patrol: patrol the line in time after the fault occurs, find out the fault point of the line, and find out the cause and situation of the fault.
(3) Special patrol: In case of severe climate change, natural disasters, external force influence, abnormal operation and other special circumstances, patrol in time to master the abnormal situation of the line and the deformation and damage of various components.
Contents of inspection in 4.2.2.4
(1) Check whether the environment along the line affects the safety of the line.
(2) Check whether the tower, stay wire and foundation are defective and the operating conditions change.
(3) Check the wires and grounding wires for defects and changes in operating conditions.
(4) Check whether there are defects and changes in insulators, insulating cross arms and fittings during operation.
(5) Check the lightning protection facilities and grounding devices in operation for defects and changes.
(6) Check the defects of accessories and other facilities and the changes in operation.
Part II of the Contract Agreement Party A: * * School
Party B:
Based on the principles of mutual cooperation, common development, active communication and mutual benefit, Party A and Party B have reached the following agreement through consultation:
1. Party A will serve as Party B's training base, and when Party B needs it, it will give priority to sending outstanding students with all-round development in morality, intelligence and physique. For Party B to choose and use.
2. Party B can serve as Party A's employment (internship) base. When there is employment demand, Party B can give priority to Party A's students if they meet the recruitment requirements.
Three. Party B shall ensure that the recruitment and employment of this unit are legal.
4. The students of Party A shall strictly abide by the rules and regulations of Party B, and Party A has the obligation to cooperate with Party B in management. If Party B dismisses students for any reason, it shall notify Party A in time.
Verb (abbreviation of verb) Matters not covered in this contract can be settled by both parties through consultation.
Signature of Party A and signature of Party B.
Party A's Seal and Party B's Seal
Party A:
Party B: Information Logistics Department of Beijing Finance and Trade Vocational College.
Through consultation, Party A and Party B reached the following agreement on school-enterprise cooperation, personnel training and other related matters:
I. Party A's responsibilities:
1. Party A provides internship positions for Party B's students, and Party A appoints a special person as the instructor of Party B's students, who is responsible for training and guiding Party B's students in such aspects as professional ethics, labor discipline, labor safety, work procedures and work norms, professional skills, manners and etiquette, and strengthening the education of students to abide by the law.
2. During the internship, if Party B's students violate Party A's rules and regulations or are not suitable for internship positions for other reasons, Party A's personnel department has the right to inform Party B to return the relevant students. If any safety accident happens to Party B's students during their internship at Party A's post, they shall notify Party B and implement it according to relevant national regulations.
3. Party A shall provide internship positions for Party B's students for more than three months, and the internship workload shall be arranged by Party B according to the labor law. If an intern terminates his studies for personal reasons, Party A will not issue an internship appraisal.
4. During the internship, Party A shall provide the following treatment for Party B's students:
(1) Working lunch: Party A provides free class meals according to the standard of formal employees; If not, provide daily working meal allowance.
(2) Internship Allowance: Party A shall verify the internship allowance of Party B's students according to the standard of RMB per person per month, and the internship allowance shall be uniformly distributed to Party B by the internship management department of Party A based on the comprehensive evaluation of the attendance of interns.
(3) Overtime: If Party A needs Party B's intern students to work overtime, the overtime pay shall be paid according to the standard.
II. Responsibility of Party B
1. Party B shall establish a school-enterprise cooperation practice training base in the practice base provided by Party A; According to the actual work of Party A, organize teachers to actively carry out the curriculum development of school-enterprise cooperation and work-study combination.
2. Party B shall provide regular employee training for Party A, and be responsible for developing employee training courses into enterprise training materials for enterprise employee training.
3. According to Party A's requirements, send students with good conduct and good health (in classes and groups) to Party A for internship, and organize students to conduct "order class" training according to Party A's employment needs. (List attached)
4. During students' internship, Party B shall assign special personnel to assist Party A in educating and managing students, and deal with relevant problems in the internship in time.
5. Party B is responsible for providing the internship course requirements in a unified way.
6. When a responsibility accident occurs during the internship of students in each position and the parties refuse to take responsibility, Party B shall assist Party A to investigate the responsibility and deal with it seriously.
7. During the internship, in order to ensure the normal order of training interns by Party A, Party B shall not change interns without Party A's consent.
8. During the internship, Party B shall notify the personnel department of Party A in advance when requesting students to return to school, and arrange interns to return to school with the consent of the personnel department of Party A. ..
9. When an intern leaves the internship post for various reasons, he shall go through the resignation procedures within three days after leaving the post, and Party B shall assist Party A in urging him to do so.
2. This agreement is made in duplicate and will come into effect after being signed and sealed by the representatives of both parties. If there are any matters not covered, both parties can sign a supplementary agreement through negotiation. ..
Party A: Party B: Information Logistics Department of Beijing Finance and Trade Vocational College.
(Seal)
Signature of representative:
date month year
Part III of the Contract Agreement Guizhou Maiken Safety Technology Co., Ltd.
Party A: Party B: Guizhou Maiken Safety Technology Co., Ltd.
In order to ensure that the access control system installation project is completed with good quality and quantity on schedule, and to clarify the responsibilities, rights and obligations of both parties, * * * reached the following contract agreement through negotiation.
I. Project Contents and Standards
Project name:
Project location:
1. Project scope: Party B shall undertake the security project of Party A's access control system by unit. All equipment and other facilities provided by Party B are public facilities, and no one may destroy them. Such as: access card reader, power box, door lock, door closer, public cable. Party B shall be responsible for installation and commissioning, and undertake relevant technology and after-sales service.
2. Name of equipment: The system of this project is installed according to the specific requirements of customers. Different brands have different functions and characteristics.
3. Engineering standards: All requirements are based on the installation materials or samples provided by Party B and the installation materials provided by Party A, and meet the acceptance standards stipulated by relevant national industries.
Second, the total project price and payment method and time limit for a project
1, access control system, electronic security and anti-theft door engineering system, RMB in words only.
2. Payment method: Party A shall pay 30% of the total project cost to Party B from the date when both parties sign this contract. After the installation project is debugged and used normally, Party A shall pay off all the balance in one lump sum and shall not default.
3. Time limit: it must be completed within days from the date when both parties sign this contract (except for special circumstances, such as power failure and irresistible natural factors).
Three. Responsibilities, rights and obligations of both parties
1. Party A is responsible for providing basic conditions for site construction. Such as: temporary power supply for construction, material stacking, etc. , and cooperate with people to install and debug at home.
Party B must be serious and responsible in the installation project. If it is necessary to change the construction plan in case of special difficulties, it must be implemented after consultation with Party A..
3. After both parties sign this contract, Party B shall actively prepare materials and organize construction to ensure that the construction period is completed on schedule with good quality.
Fourth, after-sales service.
1 Complete and ensure the normal operation of the whole system. After the system is officially handed over to customers, if there are any quality problems, such as access controller, door closer, electric lock and other equipment, it can be replaced free of charge within half a year under normal use.
2. The company provides customers with one-year free warranty service. The damage caused by man-made intentional damage or irresistible natural factors such as earthquake, flood and fire is not covered by our company's free warranty. After the expiration of the warranty period, our company will provide long-term maintenance service, during which we will charge the cost of damaged equipment as appropriate, or sign a maintenance contract with our company.
3. After the project is completed. Our company overhauls and maintains the system every two months. Such as: whether the door closer rotates flexibly, whether the whole system runs normally, etc.
4. During the project quality warranty period, due to normal wear and tear or the quality reasons supplied by our company, there will be no charge for repairing or replacing the equipment parts in the equipment list; if
If the customer needs to repair or replace the equipment due to improper use, unauthorized changes to the equipment or additional connections, human error, domestic violence and other reasons. , the user will pay all the expenses separately (if the whole system can't be used, causing short circuit and burning the host or system equipment, all losses will be compensated).
5. During the warranty period, after the company receives the customer's maintenance notice, Guiyang will deal with the problem unconditionally within 8 hours. Suburbs must be solved within 24 hours; Xiuwen, Xifeng, Kaiyang, Zhazuo and other places will be resolved within 72 hours. In case of special circumstances, the customer shall extend the time of Party B; Holidays and weekends will be postponed. (except Guiyang).
Verb (abbreviation of verb) settlement of contract disputes
1, in the process of installation and construction, if there are difficulties or other special circumstances, both parties should negotiate calmly and find a solution to the problem.
2. If the problem cannot be solved through negotiation, for example, the unit security door made by Party B can meet the relevant standards, but Party A insists that it cannot meet the requirements. At this time, you can find the relevant departments for identification, and the losing party will bear the relevant expenses. If not, the arbitration institution will make an award, and the losing party will bear the relevant expenses and responsibilities.
Liability for breach of contract of intransitive verbs
1. If Party B completes the construction according to Party A's requirements, Party A shall pay off all the balance in one lump sum after the completion and normal use as stipulated in the contract, and shall not breach the contract. For each overdue day, the liquidated damages shall be calculated at 5‰ of the total project amount.
2. If Party B fails to carry out the construction according to Party A's construction requirements during the construction process, and fails to make corrections after repeated urging by Party A, Party B has the right to make corrections within a time limit and obey Party A's instructions.
Where the parties claim compensation, the standard is 5‰.
3. This contract shall come into effect as of the date of signature by both parties, and both parties shall not breach the contract. If one party breaches the contract, the breaching party shall compensate the other party for liquidated damages at 10% of the total project price.
Seven. others
1. For matters not covered in this contract, Party A and Party B may negotiate separately, and indicate in the remarks that its supplementary agreement has the same legal effect as other provisions.
This contract is made in duplicate, which will take effect immediately after being signed and sealed, and each party holds one copy. Remarks:
Party A: Party B: Guizhou Maiken Security Technology
limited liability company
Representative of Party A: Representative of Party B: Dai.
Tel: Tel:1898 48146731398 4876873.
Date of signing: Date of signing:
Article 4 of the Contract Agreement Party A: (hereinafter referred to as Party A)
Party B: Wenjiang Power Supply Bureau of Chengdu Electric Power Bureau (hereinafter referred to as Party B)
Whereas Party A's 10 kV cable line will be located in? Respectively with Party B
10? KV cable lines are laid in the same cable tunnel (hereinafter referred to as this project). In order to ensure the safe operation of power facilities in the cable tunnel, the following agreement is reached on the safety responsibilities and obligations of both parties through consultation:
A, engineering quality standards
The quality of power facilities, equipment and materials owned by Party A must comply with GB502 17-94 Code for Cable Design of Electric Power Engineering, GB50 150-20xx Test Standard for Electrical Equipment Handover in Electrical Equipment Installation Engineering and GB50 168-20xx Code for Construction and Acceptance of Cable Lines in Electrical Equipment Installation Engineering.
Two. Responsibilities and obligations of Party A
1. The construction unit entrusted by Party A must have a perfect construction scheme and safety protection measures for power facilities in the cable channel, and the construction scheme, safety protection measures and qualification of the construction unit must be reviewed and approved by Party B before implementation.
2. The power facilities owned by Party A must have a clear operation and maintenance subject, which is responsible for the inspection, maintenance, pre-test, overhaul and emergency repair of the power facilities within its property rights. The qualification of the operation and maintenance unit must be reviewed and filed by Party B. ..
3. Party A and its entrusted operation and maintenance units must conduct inspection, maintenance, overhaul and emergency repair in strict accordance with the Power Cable Operation Regulations of the Ministry of Electric Power Industry and the Power Cable Operation Management Regulations of Sichuan Electric Power Company. And in accordance with the requirements of the national electric power industry standard "Preventive Test Regulations for Electric Power Equipment", the cable pre-test work is carried out regularly.
4. Before entering the cable channel for construction, inspection, maintenance, pre-test, overhaul and emergency repair, personnel of Party A and its entrusted construction or operation and maintenance units must go through the corresponding work permit procedures with Party B, otherwise all consequences and losses caused thereby shall be borne by Party A. ..
5. During the working period, the staff of Party A and the construction or operation and maintenance unit entrusted by Party A are strictly forbidden to have any behavior that affects the safe operation of Party B's property power facilities, cable channels and supporting facilities, otherwise they shall bear relevant legal responsibilities and compensate all losses caused thereby.
6. If all the power facilities of Party A and all the power facilities of Party B are laid in the same cable channel, it is necessary to increase or improve the safety protection measures for the power facilities and other facilities in the cable channel, and the expenses involved shall be borne by Party A. ..
7. Where the failure of Party A's property power facilities causes losses to Party B's property power facilities, passages and supporting facilities, Party A shall bear relevant responsibilities and compensate Party B for relevant losses.
8. Where Party A and its entrusted construction or operation and maintenance units carry out construction, inspection, maintenance, pre-test, overhaul and emergency repair of its property power facilities, resulting in damage to Party B's property power facilities or channels and supporting facilities, Party A shall bear relevant responsibilities and compensate relevant losses.
9. Party A and its entrusted construction unit are obliged to clean and repair the job site in time after carrying out relevant operations in the cable channel agreed in this agreement, otherwise, Party A shall fully compensate Party B for all losses caused by Party A's failure to clean or repair the job site.
Three. Responsibilities and obligations of Party B
1. Party B is responsible for the inspection, maintenance, pre-test, overhaul and emergency repair of the equipment, cables, passages and ancillary facilities within its property rights.
2. Party A and the construction unit entrusted by Party A must carry out the construction in strict accordance with the Code for Construction and Acceptance of Cable Lines in Electrical Device Installation Project, and Party B can provide corresponding technical service support for protecting power facilities such as cable channels.
3. Party A and its entrusted operation and maintenance units must conduct cable inspection, maintenance, pre-test, overhaul and emergency repair in strict accordance with Power Cable Operation Regulations of the Ministry of Electric Power Industry, Regulations on Power Cable Operation Management of Sichuan Electric Power Company and Regulations on Preventive Test of Power Equipment, and Party B can provide corresponding technical support when necessary.
4. When the failure of Party B's property right power facilities causes the loss of Party A's property right power facilities, Party B will not bear any responsibility or compensate the related losses.
5. If all the power facilities, passages and supporting facilities of Party A are damaged due to Party B's construction, inspection, maintenance, pre-test, overhaul and emergency repair, Party B shall bear relevant responsibilities and compensate relevant losses.
6. When Party A refuses to implement or fails to meet the relevant national standards during construction or operation and maintenance, Party B has the right to require Party A to rectify. When Party A refuses to rectify, Party B has the right to ask Party A to remove its power facilities from the cable channel, and all losses and other responsibilities caused thereby shall be borne by Party A. ..
7. After the signing of the safety agreement, if Party A fails to improve the relevant safety protection measures according to the design requirements, Party B has the right to refuse to lay all Party A's power facilities in the same cable channel with all Party B's power facilities, and has the right to ask Party A to remove all Party A's power facilities from the cable channel, and all losses and other responsibilities arising therefrom shall be borne by Party A. ..
Four. Coordination of operation and maintenance work
In order to ensure the smooth construction, operation and maintenance of cables and communication optical cables, Party A designates? (Tel:), Party B designates Kang Xudong (Tel: 134384xxxxx) as the specific contact person.
Verb (abbreviation of verb) This agreement shall come into effect after being signed and sealed by the legal representatives or entrusted agents of both parties.
6. This Agreement is made in sextuplicate, with each party holding three copies, all of which have the same legal effect.
Seven. Matters not covered in this agreement shall be settled by both parties through consultation.
Party A: (seal)? Party B: (Seal)
Legal representative:? Legal representative:
Or entrust an agent; Or entrusted agent:
Year? Month? What year and day? Month? sun
- Previous article:What about Click Media Co., Ltd. in Xingwen County, Yibin City?
- Next article:What does the flower shop need to prepare?
- Related articles
- Does the airport area belong to Xinzheng or Zhengzhou?
- Performance management evaluation index report
- When will win5 ditch coal mine recruit people?
- Is Jinke Smart Service Group Co., Ltd. a state-owned enterprise?
- Why does Bai Yao Group recruit a large number of people?
- What are the agencies directly under the Ningbo Municipal Public Security Bureau?
- How about the surrounding facilities of Sanmenxia Yuehai Huafu Community?
- What is the illegal submission of the recruitment examination network for primary and secondary school teachers in Anhui Province?
- Postal code of Funing County, Yancheng City
- What is the MTO of coal chemical industry?