Job Recruitment Website - Job information - What is the formula of woodworking formwork support?

What is the formula of woodworking formwork support?

The formula of woodworking formwork support is one axe every three years, one hammer every eight years and one plane every ten years. The chisel has an angle to drill holes, the planer has no angle to plane boards, the chisel has no steel holes to cut wood residues, the chisel grinds to a round lamp, and only drinks soup at night. The hole with bolt is smaller than the hole, which is unsafe. Draw ink to talk about size and drilling.

Support skills of woodworking formwork

Formwork construction refers to making the model of concrete to be poured, that is, concrete mold, with formwork before pouring concrete. What kind of formwork can be used for concrete pouring? The steel bar for U-shaped wall can be fine-tuned through the adjustable hole position in the middle, and the steel bar system can be checked again before concrete pouring.

The reinforcement system on both sides of the wall is connected by opposite bolt rods, and the transverse spacing of the opposite bolt rods is 600 mm ~ 800 mm. Use PVC pipe to check whether there are problems such as loose inclined iron and loose screws, and adjust them in time. Loosen the nuts and remove the connectors first, and then remove the reinforcement. After the reinforcement is removed, the concrete and other residues left on it shall be cleaned in time.