Job Recruitment Website - Job information - Does the institution of Huang Wei have a real exam?

Does the institution of Huang Wei have a real exam?

20 16 yellow river Committee recruitment examination subjects are: public basic knowledge, yellow river basic knowledge and professional ability test. Zhonggong Henan Institution Examination Network has compiled 20 16 simulated test questions of Yellow River Basic Knowledge, a written test subject of Yellow River Recruitment Examination. I wish you all a smooth 20 16 recruitment examination!

20 16 Yellow River Committee Recruitment Examination Full True Simulation of Yellow River Basic Knowledge

1. The construction scheme of engineering facilities such as river crossing, river crossing, dike crossing, roads, water intake and drainage shall be approved according to the relevant flood control requirements.

A, relevant water administrative departments B, flood control headquarters

C. Relevant local governments D. Transportation departments

2, the national flood prevention scheme of major rivers, formulated by (b).

A. Provincial People's Government B. Flood Control Headquarters C. Ministry of Water Resources D. the State Council

3. The 3S technology adopted in the "Digital Yellow River" project refers to (a).

Remote sensing, geographic information system, global positioning system

c、RS、GIS、GPRS D、BS、GIS、GPRS

4. At the 20 10 working conference on the whole river, our committee proposed to implement the strictest river basin management system. Its main contents are the strictest water resources management system and (3) the strictest water and soil conservation supervision and monitoring system.

A, the strictest ecological protection system B, the strictest flood control management system

C, the most stringent river management system D, the most stringent engineering management system

5. According to the Measures for the Administration of Heihe Water Dispatching, (1) Responsible for the organization, coordination, supervision and guidance of Heihe water dispatching.

A, Ministry of Water Resources B, Yellow Committee C, Heihe Bureau D, the State Council

6. At present, the management strategy of the lower Yellow River established by our committee is (a).

A, stabilize the main channel, adjust water and sediment, widen the river course, reinforce the dike, and make policy compensation.

B, stabilizing the main channel, regulating water and sediment, silting and embankment consolidation, and policy compensation.

C, stabilize the main channel, widen the river channel, reinforce the dike, and make policy compensation.

Water and sediment regulation, river widening and dike reinforcement, policy compensation

7. On July1958 17, a flood peak of (c) m /s3 appeared at the Huayuankou of the Yellow River, which was recorded in the Yellow River hydrology since the founding of the People's Republic of China.

a、8700 B、35000 C、22300 D、33200

8. 1999 (a), Water storage of Xiaolangdi Water Control Project on the Yellow River.

A, 65438+1October 25th b, May 25th c, June18th d, February18th.

9, the regional planning within the scope of the basin should obey (c), professional planning should obey the comprehensive planning.

A, master plan B, local planning management C, river basin planning D, comprehensive

10, the water conservancy scientific research projects in the early stage of our Committee implemented the (1) system.

A, project library management b, online management c, others

1 1. When the water conditions of rivers, lakes and reservoirs are close to the guaranteed water level or safe flow, or when the flood control engineering facilities are in great danger or emergency, they can declare an emergency flood control period and report it to the flood control headquarters of the people's government at a higher level.

A, local people's governments at or above the county level b, river bureau and other departments.

C, water administrative department D, flood control headquarters at the corresponding level

12, the basic principle of unified water regulation of the Yellow River is (a).

First, the Yellow River water unified dispatching, follow the principle of total control, cross-section flow control, classification management and classification responsibility.

B, the Yellow River Conservancy Commission shall, on the premise of ensuring the necessary ecological water and sediment transport water in the river, reasonably arrange the water for the living, agriculture, industry and ecological environment of urban and rural residents outside the river to prevent the Yellow River from being cut off.

C, the implementation of the Yellow River water regulation, should be on the premise of ensuring the necessary ecological water and sediment transport water, reasonable arrangements for urban and rural residents living, agriculture, industry and ecological environment outside the river water, to prevent the Yellow River from being cut off.

D. To implement the unified water dispatching of the Yellow River, we must first meet the domestic water demand of urban and rural residents, ensure the necessary water for sediment transport in the river, rationally arrange agricultural and industrial water, and prevent the Yellow River from being cut off.

13. The Yellow River Conservancy Commission stipulates the flow control index of the hydrological section at the provincial boundary of the main stream of the Yellow River, and (c) is responsible for ensuring that the flow of the hydrological section at Toudaoguai meets the specified control index.

A. Yellow River Water Conservancy Commission of Ningxia Hui Autonomous Region People's Government

C. People's Government of Inner Mongolia Autonomous Region D. Water Resources Department of Inner Mongolia Autonomous Region

14, soil and water conservation is an item that we must adhere to for a long time (a).

A, basic national policy B, important principle C, great cause D, urgent task

15. Building a reservoir can regulate runoff. After the completion of the reservoir, the flood peak flow in the downstream of the reservoir decreases, the minimum flow in dry season increases, the evaporation on the reservoir surface increases, and the groundwater level in the reservoir area and surrounding areas increases. This effect is (1).

A, hydrological effect of reservoir B, regulation effect of reservoir

C, the flood control function of the reservoir D, the beneficial function of the reservoir

16, the moisture in soil can be divided into three types (a) according to its hydrological characteristics.

A, diving, capillary water and suspended water B, diving, combined water and free water.

C, capillary water, combined water and diving D, suspended water, free water and capillary water.

17, the four indicators of the Yellow River regulation are: the dike does not burst, the river keeps flowing, the pollution does not exceed the standard, and (d).

A, the environment does not deteriorate b, soil erosion c, dike does not increase d, river bed does not increase.

18. From the beginning of the Republic of China, according to the knowledge of modern hydrological science, hydrological stations were established for hydrological observation. The earliest hydrological stations in the main stream of the Yellow River are Shaanxi Hydrological Station and (B).

A Lushui Hydrological Station B and Luokou Hydrological Station

C. wulongkou Hydrological Station D and Xiaolangdi Hydrological Station

19, the major water user in the Yellow River Basin is (B).

A, industry b, agriculture c, domestic water

20. With the development of human society and the increase of population, the lower reaches of the Yellow River are increasingly being developed. In order to develop production, governors along the river built dikes one after another. The dam on the lower reaches of the Yellow River was built in (AD).

A, Spring and Autumn Period B, Yuan Dynasty C, Ming Dynasty D, Tang Dynasty

2 1. In order to make the limited beach volume on both sides of the middle reaches of the Yellow River play a greater role in reducing siltation, a siltation test was carried out in Liubaitan, a small north main line of the Yellow River in 2004, which basically reached the test goal (c), and accumulated experience for large-scale siltation in the future.

A, coarse and fine; B, storing water and retaining sand; C, coarse and fine sediment deposition; D, dredging and storing water.