Job Recruitment Website - Job information - Taiyuan departure time of Line 3

Taiyuan departure time of Line 3

Section 4 of 20 17.

Taiyuan Metro Line 3 is a backbone line that crosses the west side of Fenhe River in the north-south direction and the Fenhe River in the east-west direction, connecting the two banks of Fenhe River. The line starts from Chai Village in the north, mainly passes through Heping North Road and Heping South Road from north to south, then turns to South Central West Street in the east, crosses Fenhe River, enters South Central Street in the south, enters Central Street in the south through Taiyuan South Station, and reaches Dongfeng Village at the terminal station in the east along Central Street. It is about 30.8 kilometers long, all underground lines, with 25 stations, including 9 transfer stations. Transfer to Xiayuan Station, Zhongxin Street East Station, 1 Line, Jinyang Street Station and Line 2. Chaicun Parking Lot and Dongfeng Depot (same address as Line 4) are set up on the line, with a total investment of about 24.3 billion yuan.

Route, Chaicun, Ruicheng, Yingcun, Sangui, North Central Street, Xinghua West Street, Yifen Street, Wayao Street, Xia Yuan, South Inner Ring Road, Dajingyu Street, Changfeng West Street, Shifu North Street, Wu Jiabao North Street, Qianfeng South Road, Wu Jiabao, Pingyang Road, Jinyang Street, Junmin South Road, Wucheng South Road, Tang Huai Road Station and Taiyuan South Station.