When will the wooden door clan come to measure?

The measurement time of wooden doors should consider factors such as accurate size, reasonable working procedure, reasonable construction period and quality assurance. The production cycle of wooden doors is about 40 days, which is suitable for installation after secondary putty scraping, and the protection of other products should also be considered.

Based on various factors, there will be two three-way time measurement methods: twice and 1 time:

(a), the ideal measurement method is 2:

When entering the site for the first time, the position of the entrance was determined with cooperation, and the problems such as special-shaped and T-shaped walls were solved, and the appropriate size was formed, which was convenient for reconstruction. It should be pointed out that:

1. The decorator needs to be present, cooperate, communicate this size and sign for confirmation.

2. The owner or construction management personnel should repeatedly tell the foreman that the size of the completed doorway should be consistent with the above size.

On the second visit, after the wall renovation is completed, the height of the floor can be determined (the determination of the height is to know the thickness of the floor, the height after leveling, the height of the floor tiles, etc.). ), verified and accurately measured, and then produced according to this size.

This method is not easy to make mistakes, and the overall effect is achieved, but the cost of the manufacturer is high and it is not suitable for short construction period.

(2) The suboptimal method 1 is the same as the ideal method 1, but this method tests the execution of construction control, and often the door cannot be installed or there are big defects due to transformation. Enough time will not delay the production cycle of wooden doors. It is generally recommended to customers with small apartment and short construction period.

(3), the second best way 2, the same as the ideal way step 2, even until the ground is flat and the kitchen and bathroom tiles are pasted, and then the door is measured.

Then it should be noted that the door opening cannot be changed at will after the size is signed and confirmed.

This method is suitable for customers with large huxing and long construction period.

(4) Introduce the installation of wooden doors to help understand:

1. It is recommended to install it after the second putty, and the painter should repair the gap between the buckle line and the wall surface when putty is applied for the third time, so as to ensure the overall seamless appearance.

2. Follow-up work should pay attention to protective doors, sand walls, primers and topcoats, and then install the back floor, land reclamation and so on.

3. Installation too early or too late will have a great impact on related processes or finished product protection.