Job Recruitment Website - Job information - Installation methods of wooden doors for a combined room and key points for installing wooden doors for a combined room
Installation methods of wooden doors for a combined room and key points for installing wooden doors for a combined room
When renovating a new house, doors are a must-have option. Doors are needed by every family, and many people will choose wooden doors. Set doors are one of the more popular decoration doors among door styles. Currently, the better brands on the market are Heshijia wooden doors, but many people don’t know much about the price of Heshijia wooden doors. Let’s take a look with you. Let’s take a look at the installation methods and key points of Heshijia wooden doors!
How much do Heshijia wooden doors cost?
Heshijia wooden doors are popular in price and very cost-effective, ranging from a few hundred to a few thousand. No wait.
Heshijia wooden doors are a new generation of glue-free hot-melt, low-carbon and environmentally friendly products. They are noble and elegant and are widely used in the decoration of hotels, restaurants, high-end clubs, shopping malls and indoor home projects. Related companies include: Qingyuan Dazhong Plastic Products Co., Ltd., Daxin Plastic Products Co., Ltd., Heshijia (Qingxin) Building Materials Co., Ltd., Heshijia (Henan) Building Materials Co., Ltd., Chengdu Heshijia Building Materials Co., Ltd., Vietnam Heshijia Co., Ltd. and other branches and production bases.
Points to note when installing set doors:
1. Check the opening to see if the size of the opening meets the installation requirements. If it does not meet the requirements, necessary treatment should be taken.
2. Unpack and check whether the door frame, door cover line, door blocking strip, sealing strip and other parts are complete.
3. Assemble the door frame. When assembling the door frame, the overlap between the mullion frame and the horizontal frame must be coated with glue and then fixed with self-tapping threads.
4. Position the door frame. The door frame is in place according to the indoor elevation line. First, use wooden wedges to clamp the door frame from around the door frame. Then use tooling and wooden wedges to tighten the door frame from the inner opening of the door frame. Clamp the inner and outer wood of the door frame. Wedge, adjust the verticality, horizontality and inner diameter of the door frame to meet the design requirements (the gap between the door frame and the door leaf is 2.5-3mm/side, and the door leaf and the ground are 5-8mm).
5. Inject glue into the door frame. Before filling the foam glue between the door frame and the wall, you must first clean the wall. Use a watering can to moisten the wall and fill it with foam glue. Pay attention to the appropriate amount of foam glue and avoid excess. Cut the styrofoam flat with a razor blade.
6. Install the door cover wire. After the foam glue has cured for 4-6 hours, remove the tooling and wooden wedges, apply glue in the door frame embedding groove, then embed the door cover wire into the door frame, and tap gently. Press tightly to make the door cover line and the wall fit tightly.
7. When installing the door leaf, pay attention to the opening direction of the door, install the hardware, and ensure that the gap between the door leaf and the door frame meets the design requirements to ensure that the door leaf can be opened and closed flexibly.
1. Door frame installation method
1. Unpack the overall door frame line and check various components: 1 top frame 823±1MM long, 2 approximately 2.1 Meter-long side frames, door trim lines, front door frame lines, rear door frame lines, silent strips, door stop lines, fixed iron sheets, expansion screws, wood screws, etc.
2. There are already processed 9×18MM fixing steps on one end of the two side frames, and two small holes are drilled to facilitate the fixation of wood screws; on the side, there are countersunk holes. , expansion screws can be used to fix it during installation. Make sure to secure the top and side frames with wood screws after alignment.
3. Place a temporarily fixed piece of wood underneath and perform auxiliary correction to make the door frame roughly vertical and square. The door frame is installed.
2. Door opening installation method
1. Install the assembled door frame into the door opening, adjust the gaps on both sides and the top, use wooden wedges to level and straighten the door frame and tighten it.
2. If you use expansion screws to install, use an impact drill to align the expansion screw holes on the side frame to drill holes in the wall, install the expansion screws and lock them; if you use fixed iron sheets to install, Drill holes in the reserved holes on the iron sheet, insert the gecko, and tighten with self-tapping screws
.
3. Fill the gap between the wall and the door frame with foam glue or cement slurry.
4. After the styrofoam or cement slurry has dried, remove the temporary fixing wood and saw off the excess protruding wooden wedges.
5. Use all-purpose glue to paste the front door frame line and rear door frame line to the door frame. The joint corners need to be cut at a 45-degree angle in the width direction. The front door frame line is 70MM, and the rear door frame line is 100MM, 150MM, 250MM and other specifications.
6. Use universal glue to paste the door cover line and insert it into the unique 3MM wide and 30MM deep groove on the door frame. Adjust the insertion depth according to different wall widths. When assembling, the joint corners need to be cut at a 45-degree angle in the width direction.
Several trustworthy brands have been selected based on various objective factors, allowing consumers to purchase with more confidence. And the installation points of kit doors can help those who are installing them. The above is the installation method and key points of the wooden door of the combined room that the editor will introduce to you today, and that ends here.
- Related articles
- How much does it cost to work in a hotel during the Spring Festival?
- Is Founder Technology a state-owned enterprise?
- What kind of refrigerator does Becco belong to?
- Work plan for public recruitment of 43 staff in institutions directly under the Civil Affairs Department of Henan Province
- Registration time of institutions in Xizang Autonomous Region in 2023
- Changyuan Wandelong business hours
- How to do well in hotel management
- Will Hebei Tobacco Recruitment Physical Examination be notified?
- Is the blonde well treated?
- Peace of mind, remember that the overtime return fee is true? How is it reversed? Does anyone know?