Job Recruitment Website - Job information - Summary of environmental protection work

Summary of environmental protection work

Five essays on environmental protection work

Part I: Work summary in August

Work summary in August

Time flies, and August slipped away from us before we knew it. It was too late to sigh. September came with a heat wave, and it was not as crisp as it should be in autumn, and the hot summer continued to extend. When people spent a hot August, they couldn't help but frown at September: When the hell will this weather end?

The heat continues and the work continues. By the end of August, I have been in the company for one and a half months, and August can be regarded as a very crucial month for me. Looking back at my original ignorance, I can't help smiling. Now I will make a summary in August, which is also a reflection on my past. In order to think about yourself and make progress.

in August, my main work content was to study the company system and various laws and regulations, including Quality Management Standard for Pharmaceutical Trading, GSP Inspection Clause, Regulations for the Implementation of Drug Administration Law, Drug Administration Law, GSP Knowledge, Measures for the Supervision and Administration of Drug Circulation, and Pharmaceutical Affairs Management and Regulations. After learning boring book knowledge, I participated in the company's goods adjustment and delivery, and basically mastered the work content of the process from purchase to delivery of drugs. He visited and studied in Sichuan Keruide Pharmaceutical Co., Ltd. with interns from Chengdu, during which he mainly studied good manufacturing practice, and got a preliminary understanding of the relevant legal requirements and regulations of pharmaceutical production enterprises, and also deeply realized that the pharmaceutical industry should be treated rigorously and meticulously, because it is directly related to the safety of people's lives and property, and any negligence may cause irreparable losses to the public and the company. During the study tour, I also visited the QC of the Quality Department, and learned about the operations such as sample retention and inspection of drugs, and I was even more impressed by the strict requirements of the pharmaceutical industry. At the end of the internship, I also participated in the outsourcing work of the outer packaging workshop, combining theory with practice, and I also had a deeper understanding of this industry.

The most impressive thing is the training of fire safety knowledge. This is the first time that I came to the company to complete the task assigned by the leader independently. Although there are some twists and turns during this period, my story is too simple, but it also provides valuable experience for my future work. And after this exercise, my courage has also been effectively trained, which can be described as killing two birds with one stone. I am also very grateful to the leaders for this opportunity.

A new month has come, with new challenges and opportunities. I must adjust my mentality, get ready for new challenges, work hard, earnestly complete the tasks assigned by the leaders, and strive to contribute all my strength to the development and growth of the company!

wan dechuan 2xx.9.1

chapter 2: summary of safety work in August

summary of safety work in August of XXXXXX co., ltd.

in August, our company strictly implemented the responsibility system for production safety and made efforts to eliminate potential safety hazards in the work. In order to find out the base number and eliminate potential safety hazards, we have carefully organized and carried out mine supervision and inspection activities, made mine safety monitoring the highlight of industry management, and made every effort to do a good job. During the main flood season, we always stood at the height of maintaining stability and promoting development, proceeding from safeguarding the fundamental interests of the people, and aiming at the characteristics of mine safety production in flood season, we have carefully found out the existing weak links and problems, formulated practical and effective measures, and made a solid grasp of the safety production in flood season, so that the mining area can The safety work in August is now reported as follows:

1. Safety education and training

In order to further enhance the awareness of safety in production of all construction units, the training of new employees should be intensified, and on the premise of improving the self-protection ability of employees, the focus should be on "safe production and civilized production". All construction units are required to do a good job in pre-shift, post-shift and pre-job training while ensuring the completion of monthly tasks. Due to the high mobility of construction team personnel, the production safety section organized new employees to conduct safety education and training in time. This month, the production safety section went deep into the construction teams to conduct safety education and training for all construction units in the mine, with a total of 118 person-times, and conducted safety education and training for 29 new employees in the construction team, and distributed 29 safety education papers. So as to improve the safety awareness and skills of employees and further promote the safe and harmonious development of mining areas.

strengthen the training and education on safety management knowledge, safety

operating procedures, safety operation skills and special operations of special operations personnel of the whole company and all construction units. This month, informed by the county public security unit, we focused on the professional skills training of explosion-related safety officers, warehouse keepers for obtaining evidence and blasting operators, urged 2 construction units to participate in special work training and certification, and organized 4 explosion-related safety officers and warehouse keepers of the Ministry of Mines to participate in certification and inspection, so that the rate of holding certificates reached 1%.

II. Safety inspection and rectification of hidden dangers

This month, the Notice on Carrying out Special Safety Inspection of Non-media Mining Enterprises and Metallurgical Enterprises issued by the County Safety Supervision Bureau was seriously implemented and rectified. During the inspection, we strengthened the inspection of hoisting system, safety exits, mechanical ventilation facilities and electromechanical equipment. While doing a good job in prevention and control, we found hidden dangers and rectified them in time, without going through the motions and leaving blind spots, and defined the responsibility objectives one by one. This month, the company's competent leaders personally led the team, organized geological experts and relevant departments to carry out major inspections for 6 times, and the Safety and Environmental Protection Department went to various construction teams for 21 times, and issued 12 notices of rectification of potential safety hazards, involving 7 potential safety hazards, and made sure that the rectification had an account, rectification contents, rectification measures, rectification time limit, signature of the person in charge of the rectified unit and rectification results, including 33 potential safety hazards on the spot. After reviewing the remaining 37 safety hazards, except for one safety hazard (there is water in the main roadway in the middle section of PD98) which is being rectified, the remaining 36 safety hazards have reached the rectification requirements, and the rectification rate is 97%.

III. Flood control work

From the night of XX to the early morning of XX, X month, there was a sudden heavy rain, which was concentrated and heavy, which was rare for decades. Attacked by heavy rain, rivers in my mining area, XXX mining area and major rivers in XX mining area generally flooded, causing sudden floods. After the disaster occurred, we actively responded. The flood control headquarters of the company: XXX started the emergency rescue plan for flood control of xxxx Mining Co., Ltd., studied and deployed flood control and relief work, and dispatched relevant departments and personnel to XXX mining area and X mining area to carry out flood control and rescue work.

during the main flood season, our company keeps abreast of the weather conditions, pays close attention to the water regime, ensures that information is uploaded and issued in time, and tries every means to eliminate dangerous places in time. It has organized 12 times of flood control and rescue, dispatched more than 21 rescue workers, dispatched loaders and vehicles on duty for more than 23 times, used more than 7 woven bags and built more than 8 meters of protective weirs. And issued a notice to all units, requiring all units to eliminate carelessness, always be vigilant, and prepare for flood fighting and disaster relief at any time to ensure personal and property safety. Due to the implementation of various emergency measures, the company's cadres and workers actively promoted the smooth development of various flood control work with a good attitude and solid work style, and reduced the disaster and danger to a minimum.

Third, the next work plan

1. Continue to strengthen the safety education and training for all units, so that the safety awareness is deeply rooted in the hearts of the people and the phenomenon of "three violations" is put an end to.

2. Actively carry out various safety inspections and major investigations of hidden dangers, implement the system of rectification and review of hidden dangers, solidly promote safety work, and ensure production safety.

3. Strengthen the routine maintenance of lifting system, power supply system, ventilation and drainage system, wire rope, rope buckle, tank guide and fall arrestor.

4. Strengthen the inspection of the account, so that all units can record and fill in the account in a timely, earnest and standardized manner.

5, strengthen vehicle safety management, frequent maintenance.

6. Implement various measures of "Three Preventions in Rainy Season" (flood prevention, drainage prevention and lightning protection), and strictly implement the system of 24-hour duty and leadership shift in flood season to ensure safe flood season.

XxxxXX Co., Ltd.

Chapter III: Summary of Environmental Protection Work

Since the beginning of this year,

street levels have thoroughly implemented the Scientific Outlook on Development and environmental protection priority policy, focusing on the main tasks of people's livelihood and environmental protection, energy conservation and emission reduction, upgrading and upgrading, water pollution prevention and control in Taihu Lake, ecological creation, etc., and continued to strengthen comprehensive environmental improvement, organized and carried out a series of environmental protection law enforcement inspection activities, which effectively promoted the improvement of street environmental quality. Over the past six months, we have mainly done the following work:

First, we attach importance to environmental protection ideologically

According to the current situation of environmental protection work in Xinjie, around the objectives and tasks issued by the municipal party committee and the municipal government and the voices of grassroots people, the street party working committee and office attached great importance to environmental protection work, and carefully studied and formulated the objectives and tasks of environmental protection work in the street in 21 at the beginning of the year, and implemented and arranged environmental protection as a top priority. At all levels of the street, the environmental protection responsibility book was signed in an all-round way, and the top leaders personally grasped it, and the leaders in charge specifically grasped it. The objectives and tasks were decomposed layer by layer, forming a set of management networks, which enabled the environmental protection work to be carried out in an orderly manner.

Second, solidly promote the special rectification action of people's livelihood and environmental protection

According to the spirit of the mobilization meeting of the special rectification action of people's livelihood and environmental protection in the whole city, the street office takes the point source pollution problems such as waste gas and dust, which are strongly reflected by the people in street towns, villages, communities and other key parts, as the focus of rectification, and carries out pre-treatment on the odor problems of enterprises such as Xinghe Resin, Schindler Resin, Kechuang Petrochemical, Xintiandi Amino Acid Fertilizer and Far East Municipal Asphalt Mixing Plant, and has treated four cement (grinding) plants. Through special rectification actions, the outstanding environmental problems concerned by the masses will be truly solved, and the living environment of the streets will be further improved.

Third, law enforcement and supervision have always maintained a high-pressure situation

In the past six months, on the basis of increasing the high-frequency and high-density supervision of various industrial enterprises, we concentrated our efforts on organizing two large-scale surprise inspections and inspecting enterprises for 48 times. Three batches of environmental law enforcement inspections were carried out in cooperation with higher-level governments and environmental protection departments, which put forward higher and stricter environmental management requirements for polluting enterprises. Especially on June 2, the Environmental Protection Bureau organized five inspection teams to carry out carpet law enforcement inspection on key enterprises in the street. During this inspection, most enterprises in the street were unanimously recognized by the inspectors in terms of software and hardware, but there were still very few enterprises with excessive emissions. In the past six months, we have imposed administrative penalties on two environmental violations, banned two plastic particle rolling workshops and rectified 19 enterprises within a time limit.

iv. properly solving environmental letters and visits

in the first half of the year, we received 7 reported incidents, down 25% year-on-year. With the attitude of being responsible to the people, we rushed to the scene in time to collect first-hand information on every reported incident, and resolutely handled it on the spot. If it could not be handled, we contacted the environmental protection department at a higher level in time to deal with it, thus giving the whistleblower a satisfactory answer and basically putting an end to petitions. For example, the problems of river pollution in Pengzhuang River and Yinjia Village in Tangqian Community, and the dust pollution of tea in Glass General Factory, etc., with the support of higher authorities and our coordination, relevant enterprises have carried out rectification, and the problems have been properly solved.

V. Do a good job in daily work

We strictly implement the national, provincial and municipal regional environmental access system, and prohibit industrial projects that do not conform to the national industrial policy and discharge nitrogen and phosphorus. The approval rate of environmental impact assessment of construction projects is 1%, and the implementation rate of the "three simultaneities" system of environmental protection of construction projects is 1%. Four enterprises (Kao, Dongguang, Hongsheng and Fangtai) applied for cleaner production audit, Tongshan Village established a provincial-level ecological village, and Guijing Community established a green community in Wuxi. 21 enterprises were rated as blue enterprises in the evaluation of environmental information disclosure of industrial enterprises.

while seeing the achievements, we should also be soberly aware of our own problems: first, there is no good solution to the problem of solid hazardous waste disposal in individual enterprises, and second, the intensity of law enforcement is sometimes soft. These problems should be carefully studied and solved in the second half of the year.

Key points of environmental protection work in the second half of the year:

First, accelerate the special rectification actions for people's livelihood and environmental protection, implement work measures according to the rectification plan, urge enterprises to rectify and ensure that the rectification is effective.

the second is to carry out environmental remediation actions for four enterprises in the south of Jianshe Road, so as to improve the environmental outlook of enterprises and enhance the overall image of Jianshe Road.

thirdly, we will continue to strengthen law enforcement and supervision to ensure that there will be no major environmental safety problems.

the fourth is to accelerate the work of sewage collection and energy conservation and emission reduction.

Fifth, carry out publicity and education activities on the concepts of ecological civilization and low-carbon economy.

Chapter IV: Summary of Environmental Protection Work

Pankou Hydropower Station in Duhe County, Hubei Province

Civil works and installation works of diversion and power generation system

ContractNo.: PK/JAZ(28) 2

Summary of environmental protection work of Pankou Project Department of No.3 Hydropower Bureau

Compilation:

Review:

Approval:

Pankou Project Department of No.3 Hydropower Bureau Co., Ltd. of China 2xx November 18

Summary of environmental protection work of Pankou Project Department of No.3 Hydropower Bureau

I. Project overview. The development tasks of the project are mainly power generation and flood control. After the completion of the power station, it also has comprehensive utilization benefits such as increasing the adjustable water volume of the middle route of the South-to-North Water Transfer Project, improving the water supply guarantee rate of the South-to-North Water Transfer Project and improving the navigation conditions in the reservoir area. The normal water level of the reservoir is 355.m, the corresponding storage capacity is 1.97 billion m3, the total storage capacity is 2.338 billion m3, and the regulated storage capacity is 1.12 billion m3, which is a fully regulated reservoir. There are 2 installed power stations with a total installed capacity of 5MW.

Pankou Hydropower Station is a first-class (1) project. The hub building is mainly composed of concrete face rockfill dam, open spillway on the right bank, spillway tunnel on the right bank, diversion tunnel on the left bank, ground powerhouse and switch station.

The Pankou Project Department of the Third Hydropower Bureau mainly undertakes the construction of civil works and installation of the water diversion and power generation system, which is mainly composed of water intake, pressure diversion tunnel, power plant and tailrace. At present, the excavation of the inlet of the diversion system has been completed, and the concrete pouring of the intake tower, the concrete lining in the diversion tunnel and the concrete pouring of the factory building are being carried out.

By the end of October, 2xx, about 112,m3 of main concrete has been poured, and about 67,m3 of rock excavation has been completed. The number of unit projects completed in excavation works is 42, with the qualified rate of unit projects being 1% and the excellent rate being 61.9%.