Job Recruitment Website - Job information - What is the general order of new house decoration in Wuxi?
What is the general order of new house decoration in Wuxi?
(1) Pre-design
The same is construction. The difference between people and bees is that the construction of bees is a reflection of instinct, and before construction, people will form ideas and frameworks in their minds. Therefore, if we compare home improvement to a battle, then the preliminary design of home improvement is the "battle plan" of this battle and the "soul bond" of home improvement. Therefore, Die Resistant talked about all the problems that should be paid attention to in the early design in Made in Tang Liang, so I won't repeat them here.
In the preliminary design, one thing you have to do is to make a detailed measurement of your room. Don't be lazy, you'd better do it yourself. The measurement mainly includes:
1. Define the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;
2, clear the bearing wall size. Especially it is necessary to design the wall size of furniture in the future.
By the way, don't forget to go to the property to go through the construction procedures and pay the decoration deposit before starting work.
(two) the main body is removed or changed.
When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
(3) Hydropower transformation
Before the water circuit reform, the main structure should be basically completed. Some owners may know that the first test of cabinets should be carried out between hydropower transformation and main body demolition. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:
1, to see whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
2. See if the location of the water meter is appropriate;
3. See if the location of the water inlet is convenient for installing the sink in the future.
For the first measurement of cabinets, slightly experienced owners can do it themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.
Some students have always believed that before the renovation, some main materials should enter the site in advance. What I want to say is that unless it is the main material needed for the demolition and reconstruction of the main body, the entry time of the main materials such as tiles and large core boards should be after the hydropower reconstruction. Because if the circuit transformation involves slotting on the ground, if the tiles and core boards are not properly placed, it will be very troublesome for workers to walk around.
(4) Woodworking
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which will be discussed later.
In fact, carpentry such as vertical pipes, decorative ceilings, plastering lines, etc., can also be considered as the fine links of the main body demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction, and sometimes needs some cooperation, such as-"If you are going to make a fake wall at home, you should consider whether there are hydropower lines on the fake wall, and if there are, let the hydropower reconstruction workers embed the pipes."
(5) Tiling
If the workers are busy, the foreman will usually ask the "second bricklayer" to stick bricks in the field before the "carpenter boss" finishes. This is normal, because the two do not conflict.
During the operation of "bricklayer's second child", the installation of the following three links is also involved:
1. Installation of lintels and marble windowsills. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
2. Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, owners should buy floor drains as soon as possible when they start purchasing building materials.
3. Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.
When the "second bricklayer" left the scene, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.
(6) Paint the wall
The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and brushing the furniture made by the "carpenter". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether to leave a coat for the last time, personally, I don't think it is necessary to be too serious. Judging from the experience of other people's decoration, it is of little significance to leave the top coat, because the operation behind is no dirtier than paint.
If the "design link" is to "conceive" what our future home will look like, then the "construction link" is to "package" our home, and the real "equipment" is almost in the "installation link".
(7) Ceiling of kitchen and bathroom
As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for the owner to install ceiling lamps and exhaust fans in the kitchen and bathroom at the same time, otherwise threads and holes will be left.
(8) Install the kitchen cabinet
After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
By the way, speaking of suspended ceiling, there is a problem worth discussing. Many owners choose waterproof gypsum board with waterproof paint as kitchen and bathroom ceiling. The quotation of decoration team is generally above 120 yuan per square meter, which is more expensive than ordinary aluminum gusset plate and PVC gusset plate ceiling. The gypsum board ceiling looks flat visually, but in case there is a problem with the top water pipe in the future, or there is water leakage upstairs and the downstairs needs maintenance, the gypsum board ceiling will be removed as a whole, which is much more troublesome than the gusset ceiling. Therefore, everyone should be careful when choosing gypsum board ceiling.
(9) Wooden door installation
The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. The owner should prepare relevant hardware in advance.
If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.
Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is demolished and rebuilt. Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.
(10) Floor installation
The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:
1. Before the floor is installed, it is best to let the manufacturer come to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or decoration teams will advise the owners to level the ground or partially level it, subject to the actual investigation of the floor manufacturers;
2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
3. When installing the floor, if possible, the floor must be cut in the corridor. Some owners think that cutting the floor in the corridor pollutes public areas, but it doesn't matter if it is cleaned up after completion. Cutting the floor indoors has serious pollution to the wall, and cutting the artificial stone countertops of cabinets. I believe that the owners who have been renovated have some experience.
(1 1) Laying wallpaper
The next day after the floor is installed, the home is ready, and you can make an appointment to paste wallpaper. If it goes well, the same day will do. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".
(12) switch socket installation
Owners should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially the owners who paste wallpaper. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. Therefore, it is still necessary for the owners to understand it themselves.
(13) Installation of lamps and lanterns
Install the lights. There is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.
(14) Hardware Sanitary Ware Installation
Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed.
After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive". It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, it will be a great sense of accomplishment to install a new toilet at home for the first time. By the way, she gave it a good name-"Virgo".
(15) Installation of curtain rod
The installation of curtain rod marks the basic end of home improvement.
(16) cleaning
Don't install curtains before cleaning. When cleaning, don't have furniture and unnecessary household appliances at home, leave as many "planes" as possible, so that the cleaning can be thorough.
(17) Furniture comes into play
Regarding the purchase time of furniture, it is suggested that it should be completed after the renovation of water circuit at the earliest, so as to get a general understanding of the basic size range of furniture. Therefore, some owners have been eager to book all the furniture before renovation, which is actually unnecessary.
(18) Household appliances enter the site
At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!
(nineteen) home accessories
Home decoration, the last step of home improvement, has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals, decorating handicrafts and so on.
- Previous article:Excuse me, what is the situation of Jiangxi Getrak Transmission Company? It seems that the requirements for interviewing that company today are quite high, and no one can pass Band 6.
- Next article:The Civil Affairs Bureau of Huaiyang County, Zhoukou City, Henan Province does not go to work on Saturday.
- Related articles
- Is there any financial compensation for resigning from a public welfare position in Midong District, Urumqi in 2022?
- What about Weifang Yutai Veterinary Medicine Co., Ltd.?
- That driving school in Zhongmu is easy to get a license quickly.
- Which organization's teaching materials are good for Sichuan exam teachers to recruit?
- What is the salary level of Huawei employees and how much work pressure is there?
- Will Yunxi Company formally prepare for the treatment?
- How to deal with car scrapping companies
- Is it reliable to recruit temporary workers to send express delivery in Beijing for 50 orders a day?
- Adhere to the speech template of three model essays
- Which app does Wuxi electric car number plate apply for?