Job Recruitment Website - Job information - Can Fengman Hydropower Station supply power to Japan?

Can Fengman Hydropower Station supply power to Japan?

Fengman Hydropower Station cannot supply power to Japan.

Fengman Hydropower Station, located on the Songhua River in Jilin City, Jilin Province, started construction on 1937 when Japan occupied the Northeast. It was the largest hydropower station in Asia at that time, and the Songhua River, which originated from Tianchi Lake in Changbai Mountain, was extremely rich in hydraulic resources, which made the Japanese invaders salivate.

Although this hydropower station was built by the Japanese, its designer was China (headed by Sun Jichao), which has far-reaching significance. The bottom builders are hundreds of thousands of working people in China. It can be said that this hydropower station is made of China people's bones. In order to commemorate the dead workers, the local government established the Fengman Labor Memorial Hall at 1964. The phrase "forgetting the past means betrayal" makes many people sad.

Extended data:

Reconstruction of Fengman Hydropower Station;

On 20 12 10 18, the national development and reform commission issued an announcement in official website, and approved the comprehensive management (reconstruction) project of Fengman Hydropower Station in Jilin. The project will build six 200,000-kilowatt mixed-flow hydro-generator sets, and keep the original three-phase two140,000-kilowatt units, with a total installed capacity of14800 kilowatts and an average annual power generation of1709 million kwh.

According to the reconstruction plan, the old dam will be partially demolished to form a gap, and the axis difference between the downstream new dam and the old dam is only 120m. If the reconstruction plan is implemented, there will be a spectacle of "one site and two dams" at the mouth of Fengman Gorge.

According to the feasibility study report compiled by Zhongshui Northeast Survey and Design Institute Co., Ltd. 20 10+0 1, the total investment of the reconstruction project is about 9.2 billion yuan, and the on-grid electricity price of the new dam needs to be raised to more than 0.66 yuan/kWh to meet the cost.

Prior to this, plump dam had been mired in disputes over demolition and renovation for several years. In 2009, its owner, State Grid Corporation of China, determined the reconstruction plan, but many engineering experts still believe that grouting reinforcement can ensure the safe operation of the dam. ?

Baidu Encyclopedia-Fengman Hydropower Station