Job Recruitment Website - Job information - Activity plan of the factory

Activity plan of the factory

Factory activity plan (5 general remarks)

In order to ensure high-quality and high-level activities, it is often necessary to prepare a specific, detailed and targeted activity plan in advance. The activity plan is a concrete, thorough and operational plan in terms of purpose, requirements, methods and progress. So what kind of activity plan is good? The following is my carefully arranged factory activity plan (5 general remarks) for your reference, hoping to help friends in need.

Factory activity plan 1 In order to ensure safe production in summer and achieve the goal of employees' safety in summer, this plan is formulated in line with the principle of people-oriented and caring for employees, aiming at the care, coolness and health of employees in high-temperature positions in the first line of quality inspection.

Activity objectives:

Make sure you don't suffer from heatstroke.

Send cool activity scope:

There are 7 units including raw material inspection station, pre-ironmaking inspection station, steelmaking inspection station, coil inspection station, second rolling inspection station, maintenance team of production department and sample preparation center, with 248 employees in outdoor operation and high temperature positions.

Sending cool condolences includes:

Watermelon, sorbet, cool oil, chrysanthemum, Huoxiang Zhengqi water, Ren Dan, drinks, etc.

Arrangements for sending cool activities:

From June to August, depending on the weather, they are sent to high-temperature posts to carry out cooling activities at least 1 ~ 2 times a week.

1, the staff of the organization department went deep into the first-line high-temperature post to send cool air.

2. According to the number of employees in high-temperature posts, the special expenses for sending cool activities will be distributed to each unit, and the leaders of each station room will organize the employees in the station to carry out daily cool activities.

Specific requirements:

1, sending cool activities is related to the safety and health of employees. Leaders of all units should attach great importance to it, plan, arrange, implement and summarize it, and earnestly implement the work of sending cool.

2. Each unit shall establish a ledger for the distribution of cool and refreshing articles to ensure that the cool and refreshing articles are distributed to employees in high-temperature positions. Every time an activity is carried out, it must be reported to the trade union for the record.

3, send cool activities should be combined with production safety inspection, screening hidden dangers of production safety in summer, timely rectification and implementation.

4. Each unit shall report the cooling activity arrangement before June 5, and report the cooling activity summary of the unit at the end of August. In early September, local trade unions reimbursed related expenses with the purchase documents of cool items.

The second activity plan of the factory is to actively respond to the call of the xx "Safety Month" of the country, actively implement the principles and policies of the Party and the State Council, the State Administration of Work Safety, the Provincial Bureau and the Group Safety Committee on safety production, and independently implement the main responsibility of enterprise safety production; Consolidate the enterprise's own safety management, improve the technical level of safety management and safety engineering, create a good safety culture atmosphere, and formulate this plan in combination with the company's safety production practice.

I. General requirements

Each branch factory and department shall formulate the internal activity plan of the unit according to this plan, with clear division of labor, clear regulations and strong operability, and feed back the development situation to the Equipment Power Department for the record.

Second, the theme of the event

Comprehensively deepen safety month activities, lay a solid foundation for safety and promote safety development.

Third, the activity time

"Safe Production Month" activity time: June 1 to 30.

Fourth, organization

Set up the "Safe Production Month" activity planning promotion group, with the following members:

Team leader:

Deputy team leader:

Team members:

Verb (abbreviation of verb) participating unit

The main forms and contents of intransitive verb activities

1, activity started

Hold a mobilization meeting for "Safety Month" activities. The launching ceremony of "Safety Month" was held in the form of company-level safety meeting, attended by safety leaders and safety supervisors of various production units, and the spirit of "Safety Month" was publicized at the meeting. The leaders of the company please mobilize to speak, and the heads of individual units please speak. Each unit completed the launching ceremony in the unit from June 3rd to 4th.

2. Advocacy and mobilization

(1) All units held a mobilization meeting for "Safety Production Month". The unit leader presided over the mobilization meeting of "Safe Production Month", asked all employees of the unit to attend, read out the notice and arrangement of the company to carry out "Safe Production Month", publicized the purpose and significance of carrying out "Safe Production Month", raised the awareness of all employees to carry out "Safe Production Month" and kicked off the company's "Safe Production Month".

(2) In order to create a strong atmosphere of safety in production, ensure that the alarm bell of safety in production is ringing, and make the safety culture deeply rooted in people's hearts. Use mail, radio, billboards, posters, banners, distribution of promotional materials and other forms of publicity. Post the slogan or poster of "Safe Production Month" in the conspicuous position of the publicity column in the company office, canteen and branch factory.

3. Safety Publicity Week

Start the safety production accident warning education week (June 3 -9). All units should organize and mobilize their own units to focus on warning education activities. It is necessary to establish warning education exhibition areas for companies, branches and teams, hold accident cases and accident simulation education exhibitions (taking training classrooms as exhibition halls), organize to watch warning education films, organize reflection discussions and other forms to carry out warning education activities, analyze typical accidents, draw lessons from accidents, explain safety knowledge, strengthen safety awareness and promote safety work.

4. Safety knowledge contest

It is important for all units to carry out safety knowledge competition to strengthen employees' mastery of various safety knowledge and strengthen their application of safety knowledge.

5. "Who is safety for?"

Organize employees to learn Life First-Employee Safety Awareness Manual, so that employees can understand the importance of safety and who safety is for, learn "I want safety" and make safety a habit of employees. Hold a prize essay contest of "Who is Safety for", and realize the importance of safety from every little thing around you and the good use of management.

6. Special safety inspection

Organize special inspection activities (June1July-June 2 1). In order to implement the company's safety production policy, find unsafe conditions in time, correct unsafe behaviors, make up for management defects, and carry out safety inspections in a planned, organized and step-by-step manner, leaders of all units led a team to carry out special inspection activities.

7, industrial occupational health and safety roadshow

Cooperate with 3M Company, a global supplier of personal safety protection products, conduct occupational health technical exchanges with safety managers, conduct on-site consultation on personal protection schemes, conduct small occupational health classes, publicize the importance of occupational health, and strengthen employees' attention to occupational health.

8. Emergency Exercise Week

From June 17 to June 23, all business units conducted drills on personal injury emergency plans. By organizing drills of comprehensive plans, professional plans and on-site disposal plans, we can test the actual combat capability of emergency rescue plans, find loopholes in the plans, analyze existing problems, revise the plans in time, improve the emergency system, improve the reliability, pertinence and operability of the plans, and increase the scientificity, timeliness and timeliness of emergency disposal. Strengthen the construction of emergency infrastructure, enhance emergency awareness, grasp the main points of disposal, and improve scientific rescue and emergency rescue capabilities. It is necessary to combine drill activities with strengthening employee safety knowledge education and emergency rescue training to enhance employees' safety awareness and improve employees' abilities of prevention, escape, disaster avoidance and self-help and mutual rescue.

Factory Activity Plan III According to the spirit of the new cigarette factory document, the infrastructure technical transformation department adheres to the principle of "safety first, prevention first", and in order to further improve the safety awareness and preventive ability of all employees, plug the loopholes in safety management and eliminate all kinds of hidden dangers, we have formulated the "Safety Production Month" activity plan. The key parts of fire prevention and theft prevention were self-examined and rectified, and inspection and supervision were carried out. After a month's activity, the safety awareness of employees was improved and the expected purpose of the activity was basically achieved.

One is to strengthen organizational leadership.

In order to ensure the smooth and effective development of the activities, a leading group for Safety Production Month was established, with the director as the leader and members including party leaders and department-level personnel. The whole activity was fully organized and implemented as scheduled, which ensured the effectiveness of the activity.

The second is to implement countermeasures and strengthen safety responsibilities.

1, strengthen learning, improve safety awareness and preventive ability. Use the office meeting every Thursday to organize all employees to learn the spirit of the relevant documents of the factory department, and learn the People's Republic of China (PRC) Law on Work Safety, People's Republic of China (PRC) Fire Protection Law, Order No.61of the Ministry of Public Security, Henan Fire Protection Regulations, Henan Tobacco Industry Safety Production Responsibility System and other legal knowledge and industry-related safety regulations. Through the study, we have further improved our understanding of the importance of safety work, and asked every member of the office to do a good job in the safety work of their posts and departments with their own practical actions.

2. Conduct self-inspection and rectification of key fire prevention parts (containers), and inspect and hand over the equipment and materials stored in containers after technical transformation in combination with factory equipment. At the same time, formulate rectification measures for the problems existing in safety management, organize inspections once a week, and urge the implementation of rectification.

3. In combination with the current severe situation of SARS prevention and control, all employees actively create an atmosphere of "paying attention to safety and caring for life", closely combine the study and implementation of the Law on Work Safety with the implementation of relevant rules and regulations on work safety, organically combine the publicity and education activities of work safety month with the current SARS prevention and control work, improve the legal concept of work safety of all employees through various forms, take the initiative to prevent and put the work of work safety in a prominent position. Strengthen the publicity and education of safety legal system for all employees, improve the safety culture quality of all employees, implement basic safety management, and ensure the smooth progress of production and operation.

4. Actively carry out the activity of "I give a policy for safety" and collect good opinions and suggestions from office employees on safety work. And all the staff participated in the collection activities of safety aphorisms, aphorisms and riddles organized by the Security Department. Release relevant safety knowledge learning through local area network.

5, organize all employees to conduct a comprehensive inspection of the production environment, eliminate unsafe factors; Pay close attention to vehicle safety management. Organize drivers to seriously study the working standards of motor vehicle drivers in Henan tobacco industry, motor vehicle inspection standards in Henan tobacco industry, and motor vehicle driver assessment standards and methods in Henan tobacco industry. Focus on the inspection of forklift operation procedures closely related to this office, eliminate hidden dangers, illegal behaviors and paralyzed thoughts, and ensure standardized operation.

Through the above-mentioned safety production month activities, the management of the whole institute will further strengthen safety awareness, effectively prevent all kinds of accidents, and lay a good foundation for our institute to ensure that the safety work meets the standards throughout the year.

Programme of activities of the factory 4 I. Purpose

In order to further enhance the fire safety awareness of the construction site, strengthen the effective construction of the safety site, enable everyone to master fire prevention knowledge, accurately use fire-fighting equipment, improve the ability to deal with sudden fires and fire accidents, test the feasibility of the emergency plan for safety drills prepared by our project department, provide valuable practical experience for the preparation and update of emergency plans in the future, provide reference for the actual operation of a number of emergency plans, and raise the safety management work to a new level.

Second, exercise time.

20xx 7: 00 p.m. Exercise Preparatory Meeting (project department meeting room)

On June 5th, 20xx, the simulation exercise started at 10.

Three. Brief introduction of hazard sources

The construction contents of this project are bridges, tunnels and subgrade works. There are many electrical equipment and lighting equipment in the construction site, outdoor forest, woodworking construction site, project department and living quarters in each work area, smoking in outdoor work, irregular management of oil tanks and warehouses, aging of power distribution rooms and power lines, and electrical equipment that does not meet the requirements of specifications, which may easily lead to fire accidents.

Four. participant

Industry representatives and director's office, project department employees, and construction personnel in each work area.

Verb (abbreviation for verb) organization of exercises

(1) Leading Group

(1) Commander in Chief:

Responsibilities: Make decisions, command and coordinate the deployment of drills, and explain the procedures and significance of drills.

(2) Deputy Commander:

Responsibilities: Be a good staff officer and be responsible for collecting relevant information, such as the cause of fire, the location of fire source, combustible materials and their properties, the surrounding situation, and the situation of the fire unit (distribution of combustible materials and dangerous materials, etc.). ), etc. , coordinate the operation between groups, command the deployment of fire brigade forces, and remind the fire brigade of matters needing attention.

(3) Members:

Responsibilities: Assist the chief commander and deputy chief commander, be responsible for the organization of participants in the unit, and assume the responsibilities of relevant team leaders.

(2) Fire Brigade

Team leader:

Members:

Responsibilities:

(1) to learn and master the use of commonly used fire fighting equipment, such as all kinds of fire hydrants, fire extinguishers, hoses, water guns, etc.

(2) Learn and master the fire extinguishing methods and skills of solid, gas and liquid. (Everyone prepares a fire extinguisher)

The activity plan 5 of factory fire drill aims to test the ability of company employees and voluntary fire emergency organizations to deal with fires, evaluate the skills and effectiveness of daily fire training and education, improve the ability of employees to put out fires, evacuate and save themselves, and the ability of managers to organize, coordinate and direct fires, so that employees can be trained and educated in the exercise, further enhance their awareness of fire safety, and better implement the company's policy of putting prevention first and combining prevention with elimination.

First, the fire drill content:

1, initial fire fighting and control, fire coordination and command, material transfer drill;

2, fire evacuation guidance and the wounded rescue drills;

3, fire alert and cooperate with the fire squadron drill;

4. On-site fire drill of fire-fighting equipment;

5, fire accident treatment education and exercise summary.

Second, the fire simulation settings

At 8 o'clock in the morning on xx, xx, XX, a nail riding worker in the packaging department on the second floor of the company caught fire due to improper circuit operation, and the fire spread, igniting the flammable materials illegally piled up in the workshop and illegally blocking the finished products. Three people were trapped in the fire escape and caught fire. The company started the emergency plan to organize fire fighting and self-rescue, and reported it to 1 19 for fire fighting.

Third, the organization, command and participants of the exercise.

1, chief commander: xxx, deputy chief commander: xxx, xxx.

2, exercise technical guidance: Song Qing is proud.

3. Participating organizations and their members

First, the fire fighting action group (that is, the company's first-class Fang Yi fire brigade)

Team leader: xxx Team members: Pu xxx, Yang xxx, Kuang xxx, Zhang xxx, Peng xxx, Xiao xxX and Zhu XXX.

B. Evacuation Steering Group

Team leader: Du xx Team member: Zhang xxx,

C. communication liaison group

Team leader: Zhang xxx Team members: Zhu xx and Xia xx

D, medical rescue group

Team leader: xx Team members: Wen xx, Cheng xx,

E, water and electricity security group

Team leader: Wang xx Team member: Wang xx

F, alert security group

Team leader: Li xx (safety monitor)

Team member: Zhu xx

G. Photographers: Chen xx, Liu xx, Yang xx

4. Participants: about 1500 people are on duty in the company and workshop.

5. Play the role of personnel

Two people were injured and two people sneaked in.

Fourth, the start and end time of the exercise

At 8: 05 a.m. on xx, xx, 20xx, the fire emergency plan was started with broadcast alarm or whistle signal, and ended with the summary speech of Zhang xx, the chief commander. The plan takes 50 minutes.

Preparation for verb (verb's abbreviation) practice

1. Hold a meeting to revise and confirm this exercise plan and clarify their respective responsibilities.

2. Equipment preparation: megaphone 1, assembly point signs of all departments, two large iron drums, a diesel oil, wood, ignition handle, 10 can of dry powder fire extinguisher, a fire hose and a fire hose.

3. According to the reasons, responsibilities and lessons of this simulated fire accident, prepare the employee safety education speech.

4. Practice summarizing the preparation for the speech.

Practice procedures and key points of intransitive verbs

1, initial fire information notification and fire drill

2. A fire broke out in the packaging department, which spread and ignited the illegally stacked items in the workshop.

(1) Ring alarm and broadcast alarm;

(2) report to the superior (commander in chief);

(3) notify the relevant person in charge.

3, commander in chief to the scene to check the fire.

(1) Inform the whole plant of the fire fighting situation;

(2) Notify the company's first-level fire fighting action team to rush to the scene to implement initial fire fighting;

(3) Organize the rush of important materials and open up evacuation routes;

4. After the safety supervisor arrives:

(1) Unicom Hydropower Support Group decides the power outage range and completes the hydropower support;

(2) Check and decide to close the relevant windows or doors;

(3) Understand the cause of the fire and master the original witness material evidence of accident investigation and handling.

5, commander in chief according to the situation to make a decision:

(1) Give evacuation instructions to employees;

(2) Decide and issue a fire alarm instruction to 1 19;

(3) Instruct the voluntary firemen in the workshop to carry fire-fighting equipment to reinforce the fire scene.

6, security monitor

(1) After receiving the instruction, simulate the alarm to Longgang Fire Squadron;

(2) Give instructions to the security team to strengthen the vigilance of the factory and the factory gate;

Requirements: the communication is smooth and timely, the instructions are clearly conveyed, the personnel arrive at the scene quickly and nervously, and the exercise attitude is serious and realistic.

Seven, the initial fire drill

1. The fire action team rushed to the scene with fire-fighting equipment, and at the same time brought the fire-fighting equipment of the workshop to the scene, connected the hose water gun and made a simulated fire extinguishing. Be careful not to open the water valve, pull out the lead seal and safety pin of the fire extinguisher, and don't open the handwheel, just do a simulation.

2. Volunteer firemen of the fire department: participate in fire fighting and rescue the transferred materials.

3. Other workshop-level volunteer firefighters: bring workshop fire-fighting equipment to reinforce fire fighting, participate in rescue and transfer materials.

4. Water and electricity support group: check the power supply of the fire site, cut off the power supply in different areas, start the emergency generator, ensure the water supply on site, and check whether the emergency lighting and evacuation indicator lights are normal.

Requirements: All fully equipped personnel should arrive at the site quickly, and the connection between water gun and hose should be standardized quickly, and more than 2 hoses should be connected. The fire extinguisher shall be transported safely, and shall not be damaged or injured. Materials should be rushed in an orderly and efficient manner, and on-site actions should be realistic, serious and obey orders. After the exercise, the equipment was completely restored to its original position.

Eight, fire evacuation guidance and the wounded rescue drills

1. Du xx, the leader of the evacuation guidance team, directs the team members to be responsible for the evacuation of the safety exits on both sides of the second floor of the packaging department, and guides the personnel to escape from the designated safety exits in an orderly manner according to the prescribed route to avoid crowding and falling. Guide personnel to the designated safe area in the shortest time; And report to the commander in chief in time.

2. Employees are evacuated to the company compound according to the instructions, and the number of people is counted in line.

3. Leave 20 people in the unit where the fire site is located, and 10 people will be evacuated in a low profile to simulate the smoke state of the fire site; 10 people cover their noses and mouths with cloth towels, paper towels and other items, evacuate the fire in a low profile, and then queue up to return to their original units. Requirements: Let all employees observe the evacuation and self-help process.

4. Fire-fighting and rescue drill (two wounded are temporarily set up on site): 5 minutes after the drill starts, the medical rescue team will take the two wounded to a safe place according to the position designated by the evacuation team leader, and carry out emergency rescue treatment (wound hemostasis, burn care, etc. ).

5, drill points:

(1) Before employees leave, the power supply of the equipment in this position should be turned off;

(2) Before the employees near the window leave, close the nearby window;

(3) Ensure that the fire door is closed;

(4) The commander-in-chief organizes some units on the site to queue up to count the evacuated employees, so as to ensure that all personnel are here, and can find out who is trapped in the fire and waiting for rescue.

Nine, fire alarm

1, fire scene alert drill

After receiving the instructions, the squad leader of the security team immediately strengthened the security alert of the fire and the factory to prevent people from looting and returning. At the same time, send people to patrol along the factory wall, strictly control the personnel and vehicles entering and leaving the factory gate, and strengthen the police force on key targets and parts in the factory. (After the fire broke out, people and vehicles that sneaked into potential illegal activities began to move to test whether the security guards could find and capture them. )

2. Re-simulate 1 19 alarm.

After the evacuation and assembly of employees, the commander-in-chief will give the alarm instruction of the fire fighting action team leader to 1 19 again, and then the security team will simulate the alarm content to the employees with megaphone, so that the employees can master the alarm method and key points.

Alarm points: unit, place, location, emergency rescue requirements, time, floor, combustible, fire and control; Whether there are inflammable and explosive dangerous goods, evacuation, casualties and being trapped, where someone meets a fire truck, contact number and report.

Different people can be arranged to repeat the alarm content for 2-3 times to impress the participants.

X. On-site fire drill of fire-fighting equipment: after the personnel are assembled, the actual fire drill is announced.

1. Set up the fire site, and complete the preparatory work while each department counts the number of people.

2. First, explain the purpose, decomposition and matters needing attention of dry powder fire extinguisher.

3. Fire fighting action: After hearing the commander's fire fighting order, start the fire fighting exercise.

(1) Voluntary firefighters use dry powder fire extinguishers to extinguish the fire in turn.

(2) Fire extinguishing with fire hydrant: Voluntary firefighters use outdoor fire hydrants to connect water guns to extinguish the fire.

Requirements:

(1) Do the simulation action first, then do the actual action, and the action is correct and decisive.

(2) Let ordinary employees feel the operation of fire extinguishers and explain them.

(3) Grasp the wind direction and control the smoke, fog and water flow at the scene.

(4) Use an expiring fire extinguisher. After the fire extinguisher is turned on, it should be used repeatedly to discharge all the drugs to save equipment.

Eleven, fire accident education and exercise summary

Fire accident education: the chief commander will preach to all employees.

(1) Causes, property losses and casualties of this fire.

(2) The lessons of this fire and the consequences caused by violation of regulations.

(3) The reason why the fire was controlled and put out is to praise the efforts and cooperation of all action groups.

(4) Announce the establishment of an accident investigation team, further find out the reasons, implement the responsibilities, handle related responsibilities, and further do a good job in fire control.