Job Recruitment Website - Property management - Hydropower installation symbol

Hydropower installation symbol

The symbols are as follows:

Pc: rigid plastic pipe

Ct: cable trough

Cp: metal hose

SR: steel trunking

Water gas pipeline

CT: Cable tray laying

SR: laying along the steel cable

CLE: placed along or across a column.

We: Lying along the wall.

CC: Buried along the cast-in-place slab.

CE: laying along the ceiling surface or ceiling surface.

Air conditioning: laid on the ceiling.

Ace: It's being put on the accessible ceiling.

BC: Buried in the beam.

CLC: Buried in a column.

Wc: Buried in the wall.

We: laying along the wall in the open air.

FC: embedded in the ground

Cc: Buried on the roof.

SR: Laying along steel trunking.

BE: Laying along or across the roof truss.

CLE: placed along or across a column.

We: Lying along the wall.

CE: laying along the ceiling surface or ceiling surface.

ACE: It is laid on the ceiling where people can enter.

BC: Buried in the beam.

CLC: Buried in a column.

WC: Buried in the wall.

Cc: Buried in the ceiling.

ACC: Buried in an inaccessible ceiling.

FC: Buried underground.

SCE: When laying in the ceiling, metal pipes should be worn.

MT- catheter

PC-PVC plastic rigid pipe

FPC flame retardant plastic rigid pipe

Current transformer bridge

MR- metal trunking

Mobile cable

CP- metal hose

Plastic trunking

Reinforced concrete galvanized steel pipe

Direct burial

TC- cable trench

BC- hidden in the light beam

CLC- hidden in the column

WC- hidden in the wall

CE- laying along the ceiling

CC- hidden in the ceiling

SCE- Laying in suspended ceiling

F- under the floor and terrace

SR- along the cable

BE- along the roof truss and beam

Fu Yongming along the wall

CS- chain crane

DS- pipeline crane

W-wall installation

C-ceiling

R- embedding

S-bracket

CL- on chromatographic column

Extended data:

Precautions for hydropower

1. Precast floor slab of second-hand house should avoid slotting pipes on the basis of the original floor slab as far as possible to prevent the old building from being damaged by large vibration during construction.

2. It is not advisable to slot the jumper on the ground at will to avoid the pipeline area; It is not advisable to drill holes in the ground to fix the pipeline at will, so as to avoid the pipeline area.

3. When opening the tape, avoid the reinforcement. You can move it up and down and even change its position. It is forbidden to break steel bars.

4. It is forbidden to open a long horizontal slot on the wall to walk the electric tube. The load-bearing wall is easy to damage the structure, and the long-distance reinforcement breaking of the light wall will still cause future troubles.

5. Without special circumstances, the catheter should not be placed in the plastering line, which is prone to dead bends and dead lines.

6. The pipe bender is used to turn PVC cold-formed conduit with a pipe diameter less than 25MM, and no elbow can be added when turning.

7. It is forbidden to use three-way wiring for the walking tube, so it cannot be maintained in the later period.

8. After laying the PVC conduit, it is necessary to glue the interface with PVC.

References:

Baidu encyclopedia-hydropower transformation