Job Recruitment Website - Property management - Hydropower installation symbol
Hydropower installation symbol
Pc: rigid plastic pipe
Ct: cable trough
Cp: metal hose
SR: steel trunking
Water gas pipeline
CT: Cable tray laying
SR: laying along the steel cable
CLE: placed along or across a column.
We: Lying along the wall.
CC: Buried along the cast-in-place slab.
CE: laying along the ceiling surface or ceiling surface.
Air conditioning: laid on the ceiling.
Ace: It's being put on the accessible ceiling.
BC: Buried in the beam.
CLC: Buried in a column.
Wc: Buried in the wall.
We: laying along the wall in the open air.
FC: embedded in the ground
Cc: Buried on the roof.
SR: Laying along steel trunking.
BE: Laying along or across the roof truss.
CLE: placed along or across a column.
We: Lying along the wall.
CE: laying along the ceiling surface or ceiling surface.
ACE: It is laid on the ceiling where people can enter.
BC: Buried in the beam.
CLC: Buried in a column.
WC: Buried in the wall.
Cc: Buried in the ceiling.
ACC: Buried in an inaccessible ceiling.
FC: Buried underground.
SCE: When laying in the ceiling, metal pipes should be worn.
MT- catheter
PC-PVC plastic rigid pipe
FPC flame retardant plastic rigid pipe
Current transformer bridge
MR- metal trunking
Mobile cable
CP- metal hose
Plastic trunking
Reinforced concrete galvanized steel pipe
Direct burial
TC- cable trench
BC- hidden in the light beam
CLC- hidden in the column
WC- hidden in the wall
CE- laying along the ceiling
CC- hidden in the ceiling
SCE- Laying in suspended ceiling
F- under the floor and terrace
SR- along the cable
BE- along the roof truss and beam
Fu Yongming along the wall
CS- chain crane
DS- pipeline crane
W-wall installation
C-ceiling
R- embedding
S-bracket
CL- on chromatographic column
Extended data:
Precautions for hydropower
1. Precast floor slab of second-hand house should avoid slotting pipes on the basis of the original floor slab as far as possible to prevent the old building from being damaged by large vibration during construction.
2. It is not advisable to slot the jumper on the ground at will to avoid the pipeline area; It is not advisable to drill holes in the ground to fix the pipeline at will, so as to avoid the pipeline area.
3. When opening the tape, avoid the reinforcement. You can move it up and down and even change its position. It is forbidden to break steel bars.
4. It is forbidden to open a long horizontal slot on the wall to walk the electric tube. The load-bearing wall is easy to damage the structure, and the long-distance reinforcement breaking of the light wall will still cause future troubles.
5. Without special circumstances, the catheter should not be placed in the plastering line, which is prone to dead bends and dead lines.
6. The pipe bender is used to turn PVC cold-formed conduit with a pipe diameter less than 25MM, and no elbow can be added when turning.
7. It is forbidden to use three-way wiring for the walking tube, so it cannot be maintained in the later period.
8. After laying the PVC conduit, it is necessary to glue the interface with PVC.
References:
Baidu encyclopedia-hydropower transformation
- Previous article:Can postal EMS be collected?
- Next article:What's the telephone number of the sales department of Yunfu Cui Hui Fortune Building?
- Related articles
- What about Dongguan Pan Hao Real Estate Investment Co., Ltd.?
- Where is the address of Kunhong Square in Urumqi?
- Where is Taizhou Celebrity International?
- Is there a parking space in Shenzhen Yitian Holiday Bay Store? Where is it located?
- Notice of deratization and disinfection
- What is the telephone number of Sunshine Flower City Marketing Center in Panzhihua?
- What are the types of real estate?
- Where is Dongying ward center?
- What about Shenzhen Bayes Real Estate Consulting Co., Ltd.?
- How about the surrounding facilities of Longgang Garden Community in Shijiazhuang?