Housing inspection process and matters needing attention

The measuring room is a very important part of the decoration. The number of rooms is very good, which is helpful for future decoration. The measuring room is more than just measuring data. The traditional measuring room only takes 10 minutes, but it takes at least 60 minutes to reach the professional standard room. Designers go to the on-site measurement room to understand the structural and environmental characteristics inside and outside the house, which is a solid foundation for high-quality home decoration. Bian Xiao Bunny? This paper introduces the process and matters needing attention of the acceptance room.

Number of inspection rooms and matters needing attention

1, the number of rooms determines the quotation.

To put it simply, measuring the room is the room where the customer takes the designer to the new house for field measurement, and the length and width of each room are in the house. The height and position of doors, windows, air conditioning and heating are all measured one by one, and the room volume ratio directly affects the decoration first quotation. At the same time, the measurement process is also a process of on-site communication between customers and designers. Although it takes less time, seemingly simple mechanical work will affect and determine the next decoration.

Second, the volume of the room determines the design.

Design is not a simple mechanical repetition. The internal and external environment of each owner's house is different. Different geographical environment and spatial state determine different designs. When measuring the house, the designer must carefully observe the position and orientation of the house, as well as the surrounding environmental conditions, whether the noise is too large, the air quality and the lighting are good. Because these conditions directly affect the later design, if the house is close to the street and the noise is too high, the designer can suggest the owner to install insulating glass to make the sound insulation effect better; If the original lighting is not good, you need to make up for it with design.

Volume of three or six steps

Different designers have different methods of measuring rooms. In fact, as long as the owner's room type is accurately measured, the purpose of measuring the room can be achieved. Here is a brief summary, providing measurement steps for your reference. I hope I can help you turn the decoration into a simple thing.

1。 Check and accept all rooms to understand the basic room structure. Pay attention to something special.

2。 Draw a rough plane on the paper (regardless of the size, this plane is only used to record the specific size, but to reflect the front, back, left and right connections between rooms).

3。 Measure a room from the porch door, and record each measurement data to the corresponding position in the plane.

Measurement method

(1) Measure the length and height of the room with a tape measure (the length should be measured near the ground and the height should be measured near the corner);

(2) Go to another room to measure and record the specific size (understand the spatial structure relationship between the two rooms);

(3) Observe doors and windows, switches, sockets, pipes, etc. On all sides of the wall, just on paper;

(4) Measure the length, width and height of the door itself, then measure the left-right distance between the door and the wall, and measure the distance between the door and the ceiling;

(5) Measure the length, width and height of the window itself, then measure the left and right spacing between the window and the wall, and measure the spacing between the window and the ceiling;

(6) According to the measurement method of doors and windows, record the sizes of switches, sockets and pipes; Pay special attention to the kitchen and bathroom. )

(7) Pay attention to the size and fixed position of the beams on the ceiling of each room.

4。 Measure all the rooms in the house according to the above method. If it is multi-storey, in order to avoid missing measurement, the measurement order should be to measure one floor first and then the room order should be from left to right;

5。 Pens of different colors are marked with special points;

6。 After all measurements are completed, they should be taken again to ensure that the measurements are accurate and detailed.

Fourth, pay attention to the sound? dispensing mechanism

1。 Know the amperage of the total meter capacity. Calculate whether your approximate dosage is enough. If you need high power, you need to apply to the power bureau for change.

2。 Know how many cubic meters natural gas and natural gas use. Similarly, if there is any change, you need to apply to the gas company in advance.

3。 According to the house design (please note that this is not the room type map obtained when buying a house, but the exact building room type provided by the real estate), understand which walls are load-bearing walls.

4。 Know the position and number of water inlet pipes after entering the house.

5。 Know the location of the water and the toilet pit.

5。 Matters needing attention in house acceptance

First of all, is the floor flat?

If you want to check whether the floor of the building is flat, you only need to use a long ruler (or a special ruler and horizontal ruler). Smooth, and observe whether there are scratches and cracks, and whether there is a burst point on the wall surface (burst point: when raw hydrated lime is daubed, the quicklime is not stirred well, which will form a burst point on the wall surface, and beat the burst point with an iron tip. "When you find a large area of loose, fall off and other quality problems.

Second, whether there are cracks in the wall.

Check whether the wall is flat, but also whether there are cracks in the wall (four common cracks: strength cracks, settlement cracks, temperature cracks, deformation cracks), and whether the steel mesh and steel bars are leaking. If the above wall problems are found in the acceptance process, they can be finally signed with the help of the developer.

3. Are there any defects in the indoor stairs?

This step mainly depends on the flatness of the stairs and whether there are any defects.

Fourth, whether the translation track of door and window installation is smooth.

When checking doors and windows, the most important thing is to check whether the tracks of doors and windows are clear. Especially the casement window, we must pay attention to whether it can be closed. Otherwise, there will be wind entering the house, especially in the cold north, and you will be miserable in winter. If these problems are found in the house acceptance, inform the developers directly, and they will be very worried. If you have signed it, then go to the developer to deal with these problems, then their efficiency is tortoise speed.

Verb (abbreviation for verb) Is the gate concave and convex and painted?

Check the door carefully for bumps and paint. Strictly speaking, the inside, outside and top of the door must be painted. The gap between the door and the door should not be too big, the door switch has no special sound, and the four sides of the door must be tight. Stick the door frame, the gap between the side of the door lock should not be too big, don't forget to try the lock, mainly depending on whether the key is easy to use and whether the door lock is firmly installed. It is also very important that the door has better sound insulation effect and higher sealing degree.

The process of acceptance of intransitive verbs

1: acceptance room with key.

Before handing it over to the owner, the developer usually assigns the engineering department, customer service department and property management company to form an internal acceptance team. The pre-inspection of the owner's house will be started soon, and the problems found will be corrected in time. After the pre-inspection, the developer will give the key to the property company, and the property company will arrange for the owner to accept the house.

2: Send a notification.

Generally speaking, the owner will receive the "occupancy notice" of the property 5-7 days in advance. It is best to sign the contract according to the contract. Due to the general agreement in the contract, if the owner fails to go to the acceptance room within the agreed time limit, it is deemed that the house has been handed over. If it is not delivered, some developers will charge 10000 to 10% from the date of signing the contract. If the owner is not on a business trip or has special circumstances, it is best to inform the developer in writing. And explain why.

3: Confirm the identity.

The owner should bring relevant information to the sales department, confirm his identity according to the requirements of the registration instructions, and contact the acceptance handover. Information generally includes: occupancy notice, sales contract or pre-sale contract, original and photocopy of ID card, photos of family members (real estate submitted by customers). When the client inspects the house, the client must also issue a "power of attorney" to the owner while holding a valid identity document.

4. Hand over the house for acceptance.

The property management company assigns relevant personnel to accompany the owner to inspect the house on site. Upon acceptance, the owner shall sign the House Acceptance Handover Form and obtain the house key, house use manual, house quality guarantee and resident certificate. Manual and other materials must be paid according to regulations. If the acceptance is unqualified, the owner should clearly record the defects in the "House Acceptance Handover Form", but it may not be possible to move in at present. The time for redelivery shall be negotiated by both parties, but generally it shall not exceed 30 days.

Number of inspection rooms and matters needing attention

The above are the relevant contents and precautions in the cleaning process. As the most important step before moving in, we must despise the house acceptance room. If you want to know more about the process of capacity space, please pay more attention to Tuba rabbit, which will provide you with more complete, detailed and updated information.