Job Recruitment Website - Property management - Penalty basis for removing load-bearing wall

Penalty basis for removing load-bearing wall

Legal analysis: it is against the relevant laws and regulations to smash the load-bearing wall. If the load-bearing wall is dismantled without authorization in the decoration, the property management department and the demolition person shall bear civil liability. If the demolition causes losses to others, the demolition person shall bear the tort liability and compensate for the losses. Because the demolition violates the legal provisions of the adjacent relationship; Property management companies should bear the responsibility of poor management.

Legal basis: Article 5 of the Measures for the Administration of Residential Interior Decoration prohibits the following acts: (1) changing the main body and load-bearing structure of the building without the consent of the original design unit or the design unit with corresponding qualification grade; (2) Changing rooms or balconies without waterproof requirements into bathrooms and kitchens; (3) expanding the original size of doors and windows of the load-bearing wall and removing the brick-concrete wall connected with the balcony; (four) damage to the original energy-saving facilities of the house, reducing the energy-saving effect; (five) other acts that affect the safety of building structure and use. The term "building subject" as mentioned in these Measures refers to the structural structure of building entities, including roofs, floors, beams, columns, supports, walls, connecting nodes and foundations. The term "load-bearing structure" as mentioned in these Measures refers to the main structural members and their connecting nodes that directly transfer their own weight and various external forces to the foundation, including load-bearing walls, uprights, columns, frame columns, piers, floors, beams, roof trusses and suspension cables.

Article 26 of the Regulations on the Administration of Seismic Fortification of Building Projects violates the provisions of these Regulations, and arbitrarily changes or destroys seismic facilities such as seismic components, isolation devices, seismic components or seismic response observation systems of building projects. The competent construction department of the local people's government at or above the county level shall order it to make corrections within a time limit, and impose a fine of 1000 yuan on individuals and a fine of 1000 yuan to 30,000 yuan on units.