According to Article 13 of the Measures for Property Undertaking Inspection, the property undertaking inspection shall be conducted in accordance with the following procedures:

(a) to determine the property inspection plan;

(2) handing over relevant drawings;

(three) check * * * parts, * * facilities and equipment;

(four) to solve the problems found in the inspection;

(five) to confirm the results of the on-site inspection;

(six) signed a property inspection agreement;

(7) Handling property handover procedures.

Fourteenth on-site inspection 20 days ago, the construction unit shall hand over the following information to the realty service enterprise:

(a) the completion of the general plan, single building, structure, equipment completion drawings, supporting facilities, underground pipe network project completion drawings and other completion acceptance data;

(two) a list of facilities and equipment used in * * * and technical data such as installation, use and maintenance;

(three) water supply, power supply, gas supply, heating, communications, cable television and other licensing documents;

(four) property quality warranty documents and property use documents;

(five) to undertake other materials required for inspection.

If all the materials listed in the preceding paragraph are not handed over, the construction unit shall make a detailed list of the materials that have not been handed over, and make a written commitment to make up the specific time limit.