Emergency plan for construction in hot weather (6 general remarks)

Emergency plan is an important part of national governance system and governance capacity. When there is an unexpected accident, we usually have to prepare various emergency plans and conduct drills from time to time. What should be written in the emergency plan? Urgent for you, I collected and wrote "Emergency Plan for Construction in High Temperature Weather (6 General Comments)" for my friends. Welcome to reading. I hope you can read it and keep it.

Emergency plan for construction in hot weather (6 general rules) (1) 8

I. Purpose:

This plan is formulated in order to prevent employees from suffering from heatstroke when working in a high-temperature climate environment, to ensure the smooth production of the company, to ensure that employees can quickly and effectively carry out emergency rescue work in case of heatstroke and other emergencies, and to ensure the health and life safety of employees to the greatest extent.

Second, the responsibilities and scope of application:

This plan is implemented by the production technology department of the company and is applicable to all departments and personnel of the company. The key prevention units are: production workshop, canteen, storage tank area and construction personnel employed by the company.

Third, the emergency plan to start:

According to the daily maximum temperature and weather forecast reported in the newspaper, when the maximum temperature is higher than 37℃ or reaches 38℃ for three consecutive days, the emergency plan will be automatically started, and all departments of the company will implement various work measures according to the emergency plan.

Fourth, implement the emergency plan.

1, heatstroke prevention and cooling protection group: during summer construction, there are many outdoor working environments due to operation reasons; The distribution area of personnel work is complex and changeable; The influence of labor intensity and other aspects has brought a lot of inconvenience to the summer construction of the project. In order to protect the legitimate rights and interests of workers and the safety of life and property, and create a safe and comfortable environment for workers, when workers have adverse reactions due to high temperature, the team leader will immediately organize members of this group to transfer and control the accident personnel to prevent the accident personnel from increasing in the surrounding construction site. Make emergency actions more targeted and improve operational efficiency. So as not to cause huge accident losses.

2. Information liaison person: responsible for understanding the scope of casualties, economic losses and emergencies, organizing the collection of daily weather and temperature conditions, then taking necessary preventive measures, reporting the measures and developments to the superior in time, and contacting relevant departments.

3. On-site medical rescue team: When an accident occurs, the team leader will organize the team members to carry out on-site classification and first aid treatment for the wounded, and be responsible for effective rescue of the wounded at the first time; And transfer in time. The main duties of ambulance personnel are: to enter the accident area to rescue the wounded; Guide personnel in dangerous areas to carry out self-help and mutual rescue activities; Concentrate, count, transport and treat the wounded. According to the specific situation, quickly formulate emergency treatment plans and organize their implementation.

The main drugs and medical rescue equipment are as follows:

1. Drugs: cold medicine, fever medicine, diarrhea medicine, anti-inflammatory medicine and other therapeutic drugs, as well as Ren Dan, Shidishui, Zhengqi water, chrysanthemum tea, cold-reducing herbal tea, green health food and so on.

2. Rescue appliances: single frame, ambulance, small oxygen cylinder, receiver, hospital bed, towel, medicine cabinet and freezer.

3. Logistics Support Team: The team leader is responsible for organizing and mobilizing rescue personnel, materials and equipment, and supervising and checking that all emergency rescue and relief measures are put in place.

4. Responsibilities of other departments of the company

(1) The maintenance management department should strengthen the management of water and electricity supply in summer to ensure the demand for electricity and water for workshop production. In case of power failure or water cut-off under special circumstances, the relevant departments should be informed in advance, and corresponding preventive plans should be formulated according to the specific circumstances.

(2) Widely publicize the scientific knowledge of heatstroke prevention and cooling, such as using radio, film, newspapers, internet, manuals and other forms to publicize the knowledge of heatstroke prevention and cooling, and enhance the public's awareness of self-protection. Make employees master the basic knowledge of heatstroke prevention and cooling; Workshop directors and team leaders should strengthen the daily patrol inspection of workshop production, keep abreast of the high temperature environment of the workshop and the physical condition of employees, deal with problems in time, and nip the signs of accidents in the bud.

(3) The medical office of the General Affairs Department purchases a batch of heatstroke prevention and cooling drugs in advance, such as ordinary Huoxiang Zhengqi water or capsules, and distributes them to the operators at all positions in the workshop as required. The employed construction personnel should stop using labor protection articles such as umbrellas and straw hats. The company should ensure that employees have fixed drinking places and set up drinking fountains to ensure adequate drinking water supply every day.

(4) Workshop operation belongs to high temperature operation and should be equipped with effective cooling fans. Every morning 10: 30 and 2: 30 pm, employees should be allowed to rest in a cool and ventilated place or air-conditioned room for 20-30 minutes.

(5) During the high temperature period, the company canteen supplies herbal tea to the operators of the production workshop twice a day, at 10: 30 a.m. and 2: 00 p.m. respectively. There should be enough mung bean soup or laver egg soup for lunch every day. The company office is responsible for the implementation.

Five, heatstroke rescue methods:

1. Mild patients: When employees feel dizzy, tired and dizzy during normal operation, they should be ordered to stop operation immediately to prevent secondary accidents. Other peripheral employees should arrange the symptomatic personnel to rest in a cool and well-ventilated area or air-conditioned room, and provide them with cold water, heatstroke prevention drugs, wet towels, or wipe their bodies with cold water or alcohol. And notify the workshop or department leader.

2. Severe patients: (syncope, shock, severe water shortage, etc. ) When employees of the company suffer from heatstroke, they should immediately notify the workshop or department leaders of the first-hand personnel, and timely transfer the accident personnel to a cool and ventilated place to observe their symptoms, so that the medical staff can grasp the first-hand medical information when they arrive. The company office immediately organized rescuers to transfer heatstroke patients to the nearest hospital for observation and treatment. And report the latest situation of the company at any time.

Six, the clinical manifestations of heatstroke:

Mild heatstroke: The clinical manifestations are dizziness, headache, blushing, thirst, profuse sweating, general weakness, palpitation, rapid pulse, inattention, uncoordinated movements and other symptoms, and the body temperature rises to 38. Above 5℃. Severe heatstroke: including heatstroke, heat spasm and heat exhaustion, and can also be mixed. These include:

(1) heatstroke (including heatstroke), also known as heatstroke-induced high fever, is characterized by sudden onset in a high-temperature environment, with a body temperature above 40℃, sweating at the beginning of the onset, followed by "anhidrosis", which may be accompanied by dry skin and different degrees of consciousness disorder.

(2) Heat spasm is mainly manifested as obvious muscle spasm, accompanied by contraction pain. Muscles that are common in limbs and abdominal muscles, especially gastrocnemius, are often symmetrical. Sometimes it will break out, sometimes it will ease. The patient is conscious and his temperature is generally normal.

(3) The onset of heat exhaustion is rapid, mainly manifested as dizziness, headache, sweating, thirst, nausea and vomiting, followed by wet and cold skin, decreased blood pressure, arrhythmia, mild dehydration and slightly higher or normal body temperature.

Seven, emergency handling process:

Normal working hours and holidays:

Heatstroke occurs-notify the workshop or department leader-company office (telephone)-arrange vehicles to be sent to the hospital for treatment-handle and deal with the aftermath.

At night: heatstroke occurs-notify the workshop team leader-the leader on duty-arrange vehicles to be sent to the hospital for treatment-treatment and aftermath.

Emergency Plan for Construction in Hot Weather (6 General Provisions) (2) I. Purpose

Because there are many people on the construction site, the high temperature lasts for a long time. Once a person has a high temperature heatstroke accident, it may lead to the threat of life and health of the person and the direct economic loss of the enterprise. This plan is formulated in order to ensure that our project department can carry out rescue work quickly and effectively in case of high temperature heatstroke accident, and actively respond to it according to local conditions and every second counts, so as to minimize the life safety risks of employees and interested parties.

Second, the organization and responsibilities

The project department set up an emergency command group for heatstroke accident, which is responsible for command and coordination.

Team leader:

Members:

The specific division of labor is as follows:

1, responsible for understanding the situation of heatstroke personnel and organizing on-site rescue command.

2. The task is to arrange on-site rescue in time according to the command of the command group, and organize relevant personnel to carry out on-site artificial first aid for heatstroke personnel.

3. Responsible for maintaining the order at the scene, protecting the scene of the accident, recording the inquiries of people around the parties, and maintaining communication with the local public security department.

4, responsible for properly handling the aftermath, according to the function of centralized responsible for maintaining communication with local authorities.

Third, preventive measures.

1, summer construction must arrange work and rest time reasonably, and take the method of going to work early in the morning and getting off work early in the afternoon to avoid the hot and high temperature period at noon. Let outdoor workers try not to work continuously in high temperature environment for a long time. Shading facilities have been added in outdoor workplaces according to conditions.

2, outdoor construction site set up a rest shed, drinking point, ensure the supply of tea, arrange personnel will meet the health standards of heatstroke prevention and cooling drinks to the site drying board.

3, the relevant person in charge of the site operation and each team leader shall timely distribute heatstroke prevention and cooling drugs. (Related heatstroke prevention and cooling drugs can be obtained from the financial office. )

4. If employees are found to be unwell during high temperature, they should be treated in time according to the knowledge of heatstroke prevention and cooling or ask a doctor for treatment.

5. The canteen must purchase fresh vegetables and foods that meet the hygiene standards in summer, and it is strictly forbidden to buy and eat foods and drinks that do not meet the hygiene standards.

Fourth, the disposal measures

When employees suffer from heatstroke, report to the emergency leading group immediately. Call for help if necessary.

On-site personnel should immediately take the following emergency measures to rescue heatstroke personnel:

1. Immediately transfer the patient to a ventilated, cool and dry place. Such as corridors, shade trees and rest sheds.

2, let the patient lie on his back, unbutton clothes, take off or loosen the patient's clothes, if the clothes have been soaked with sweat, should be put on clean clothes, at the same time turn on the electric fan or air conditioner, in order to keep warm as soon as possible. And adde salt-containing refreshing beverage.

3. Use physical methods to cool down as soon as possible, and let the body temperature drop below 38 degrees.

4. If the patient is conscious, or conscious after cooling, you can give the patient food or drinks such as mung bean soup and light salt water to relieve summer heat, or you can take summer-heat drugs such as Huoxiang Zhengqi Water. Coma patients can be treated by acupuncture at human acupoints such as Renzhong and Xuan Shi, and severe patients must be sent to hospital for treatment quickly. In clinic, scraping, cupping and "grasping tendons" of traditional Chinese medicine can often have immediate effects. Huoxiang Zhengqi Water, Ten Drops of Water, Ren Dan and Xiaoshu Tablet all have the effects of relieving summer heat and detoxifying. It should be noted that Huoxiang Zhengqi water and ten drops of water must be separated and cannot be used rashly. The former is mainly good at treating diseases such as summer cold and gastroenteritis caused by pathogenic wind, cold and dampness in summer, with a wide range of treatment. One medicine is mainly used to treat diseases caused by pathogenic wind, cold and dampness, and the other medicine is mainly used to treat diseases caused by damp-heat in summer. Their functions are completely different. Therefore, it is necessary to choose according to the symptoms and not to use it rashly.

Verb (abbreviation for verb) correspondence and contact

Hospital rescue center: 120

Fei Jing: 1 10

Fire alarm telephone number: 1 19

On-site duty telephone number:

Project intends to telephone on duty:

Telephone numbers of key management personnel

Project leader:

Security officer:

Technical director:

Builders:

Civilized builder:

Matters needing attention about intransitive verbs

1, in case of high temperature heatstroke accident, personnel must be organized for rescue, and emergency telephone number 120 should be called as appropriate, and relevant person in charge should be informed immediately.

2. If the patient is in a coma and needs to lie on his side, he should be sent to the hospital for treatment to avoid aggravating the condition of the wounded due to poor ventilation.

3, severe heatstroke should be hospitalized for observation, according to the doctor's advice, intravenous infusion, after the condition improves, eat some digestible food such as rice soup and noodles.

Emergency plan for construction in hot weather (6 general rules) (3) This plan is formulated to ensure the smooth construction of this project, to ensure that the emergency rescue work can be rapid and effective when there is an emergency in summer construction, and to ensure the life and property safety of enterprises and employees to the maximum extent.

1. When summer comes, the preparation of this plan will guide the development of heatstroke prevention and cooling, prevent heatstroke accidents, ensure the personal safety of employees, ensure the normal production of the project department, and ensure that all kinds of emergency resources are in a good state of preparation; Moreover, it can guide emergency actions to be carried out in an orderly manner as planned, prevent accidents from being delayed due to ineffective actions or chaotic on-site rescue work, and reduce casualties and property losses.

Two, the establishment of the construction project emergency leading group, responsible for the command and coordination of emergency rescue work. Liu Lijun, the project manager, is the chief commander of the implementation leading group. In the absence of the commander-in-chief, Liu Guangxin, deputy project manager, will be the deputy commander-in-chief. In the absence of the deputy chief commander, Sun Zhiyong, the on-site technical director, is responsible for the implementation. For the implementation of rescue work, see the emergency organization plan for specific personnel arrangements.

Three. When all kinds of high-temperature emergency symptoms appear in engineering and building construction, our project department should start this plan immediately after receiving the emergency report. At the first time, I asked for help from the company's emergency rescue command center and the "120" ambulance center respectively, and reported the situation to the municipal safety production supervision bureau, the Federation of Trade Unions and other relevant departments. After an emergency, the follow-up situation should be continuously fed back to relevant leaders and departments.

Four, after all kinds of emergencies, the need to mobilize the main professional rescue teams and emergency relief supplies. The main materials and personnel responsibilities are arranged as follows:

Wu Shaoxing, a material engineer, is responsible for the material procurement of the project department. The main drugs and medical rescue equipment are as follows:

1. Drugs: cold medicine, fever medicine, diarrhea medicine, anti-inflammatory medicine and other therapeutic drugs, as well as Ren Dan, essential balm, Huoxiang Zhengqi water, chrysanthemum tea, fire-reducing herbal tea, green health food and so on.

2. Rescue equipment: single frame, small oxygen cylinder, receiver, towel, medicine box, freezer (ice), etc.

3. The project department shall set up a clinic with full-time medical rescue personnel, who shall pass the professional training and examination and hold relevant certificates.

Five, heatstroke prevention and cooling measures

1. Strengthen the publicity of employees' knowledge of heatstroke prevention and cooling, and carry out various publicity and education activities on summer safety and health care, so that employees can understand summer safety and health care knowledge and improve their self-protection ability.

2, improve and implement the responsibility system for production safety during high temperature, set up a leading group for heatstroke prevention and cooling, formulate emergency plans, try to avoid high temperature operation and implement preventive measures.

3. Before the summer vacation comes, it is necessary to do a good job in the health examination of employees working in high temperature, and adjust their jobs in time for employees with contraindications to high temperature.

Emergency plan for construction in hot weather (6 general provisions) (4 articles) 1

I. Purpose:

1, to prevent high-temperature heatstroke accident during operation, causing personal injury and property loss to the company, and ensuring safe production of the branch;

2. In order to timely and effectively prevent and deal with heatstroke events caused by high-temperature meteorological conditions (hereinafter referred to as high-temperature heatstroke events), guide and standardize the health emergency work of high-temperature heatstroke events, avoid and reduce personal injuries and property losses caused by high-temperature heatstroke, and minimize the life safety risks of employees and interested parties.

3. In order to do a good job in production safety during high temperature in summer, ensure the life safety of employees, improve the handling and emergency response capabilities of employees, and test the emergency response level of emergencies.

4. This exercise scheme is applicable to the employees engaged in production in our company. When someone has heatstroke in the workplace, they should bear the responsibility of emergency rescue for others' heatstroke. If someone is found to have heatstroke in other places, he shall bear the obligation of emergency rescue for heatstroke of foreigners.

Second, the basic situation of the simulation exercise:

1. When front-line employees were working near the stockyard, an employee of the loading and unloading team fell to the ground due to high temperature heatstroke.

Third, exercise time:

The exercise time is scheduled for June xxx.

Four, the plan exercise organization and responsibilities:

1, high temperature heatstroke accident organization

1 Chief Commander: Wu Jingbin's main responsibilities:

First, be fully responsible for on-site emergency work;

B, decided to start the emergency plan;

C, command emergency work.

Deputy Commander Fu Cheng's main responsibilities:

First, organize emergency work;

B, coordinate the unified scheduling of field personnel;

C, responsible for investigation, monitoring and the determination of the first aid plan. On-site command: Sun Youchang's main responsibilities:

2. The responsibilities of each group:

(1) Accident handling group: The main task is to determine the rescue plan and organize personnel and vehicles to rescue people suffering from heatstroke.

(2) Medical rescue team: The main task is to rush to the scene of the accident in time to rescue the heatstroke victims, and decide to give first aid at the scene or the nearest hospital according to the injury to ensure the life safety of the wounded.

(3) Alert Liaison Group: The main tasks are to upload and issue leadership instructions and divert road traffic, communicate with the outside world to inform the accident scene, send people to meet at the intersection, and record the whole process of the drill.

(4) Logistics Support Group: The main task is to follow the instructions of leaders, arrange stretchers for rescue drills, and ensure the supply of heatstroke drugs.

Verb (abbreviation for verb) rescue equipment and materials:

Stretcher, medicine box (50% alcohol, elixir, ten drops of water, Huoxiang Zhengqi water, cool oil, all kinds of disinfectant and articles, flashlight, walkie-talkie,), towel, washbasin, cold water bottle.

Six, matters needing attention:

1. The alert liaison group should carefully record the drill time, report time, personnel injuries and on-site personnel.

2. The logistics support team will transport all the drill personnel and materials to the drill site before the time, and arrange the logistics related materials in place.

Rescuers should arrive at the scene in the shortest time. After the rescuers arrive at the scene, they should obey the orders of the accident emergency team and carry out first aid work. After the rescue, evacuate all personnel from the scene of the accident and to a safe area.

4. The commander-in-chief summarized the drill and announced that after the drill, all the drill personnel were evacuated from the drill site to restore the operation order.

Through this exercise, all our staff will be more clear about the rescue procedures of the emergency rescue plan. Ensure the orderly implementation of the first aid plan when dealing with emergencies, buy time for rescue and achieve the purpose of practicing xxx.

Emergency plan for construction in hot weather (6 general rules) (5 articles) 6

1。 general rule

1。 1 This plan is formulated in order to timely, effectively and quickly deal with heatstroke personal injury accidents caused by high temperature and poor ventilation in the workplace, and to avoid and reduce personal injury and property losses caused by heatstroke. This plan follows the principles of "safety first, prevention first" and "constant vigilance and quick response", enhances risk awareness, adheres to the combination of prevention, early warning, emergency rescue and disposal, improves the working mechanism, and makes all preparations for emergencies. Establish and improve the management mechanism of unified leadership and graded responsibility to ensure the mutual cooperation and organic linkage of various professional emergency forces. The combination of on-site self-help and social rescue can improve the ability to cope with and deal with high-temperature heatstroke accidents.

1。 2 compilation basis

1。 2。 1 People's Republic of China (PRC) safety production law (year 20xx).

1。 2。 2. Regulations of the State Council on Reporting, Investigation and Handling of Production Safety Accidents (Order No.493 of the State Council, 20xx).

1。 2。 3. the State Council National Emergency Plan for Production Safety Accidents (20xx).

1。 2。 4? State Administration of Work Safety "Guidelines for Preparation of Emergency Plans for Production Safety Accidents of Production and Business Units"

(GB/T29639-20xx).

1。 2。 5. Interim Provisions of the State Electricity Regulatory Commission on the Investigation of Electric Power Production Accidents (Order No.4 of the State Electricity Regulatory Commission in 20xx).

1。 2。 6. China Electric Power New Energy Development Co., Ltd. Hailin Company's comprehensive emergency plan.

1。 3 Scope of application

Suitable for China Electric Power New Energy Hailin Company.

1。 4 working principles

1。 4。 1 Based on the basic principle of timely and rapid diagnosis and treatment of illness and ensuring the life safety of people suffering from high temperature heatstroke. Emergency rescue personnel at all levels should stick to their posts, correctly perform the duties assigned by the emergency plan, and carry out the instructions of the accident emergency site command without endangering personal safety.

1。 4。 2. Unified leadership and graded responsibility. Under the unified leadership of Hailin Company of China Electric Power New Energy Development Co., Ltd., establish and improve the emergency management system with graded management and graded responsibility. Establish and improve the responsibility system for emergency management of leaders at all levels, give full play to the role of professional emergency rescue agencies, and do a good job in emergency management and emergency disposal.

1。 5 the start of the emergency plan

1。 5。 1 In case of high temperature, the on-site staff should promptly deal with any person with symptoms of threatened heatstroke or mild heatstroke, take first aid immediately, contact the medical staff at the same time, and report the casualties caused by high temperature heatstroke to the emergency plan headquarters. The emergency rescue leading group quickly rushed to the scene of the accident to organize accident treatment, and the general commander announced the start of the A-level emergency plan.

1。 5。 2 In case of severe heatstroke, a large number of people suffering from heatstroke or serious illness, the field personnel should deal with it quickly, contact the medical staff at the same time, and report to the leading group of emergency plan for personal injury and death caused by high temperature heatstroke and the emergency rescue headquarters. The members of the command group should immediately rush to the scene of the accident, and according to the actual situation at the scene, the chief commander or deputy chief commander will announce the start of the Class B emergency plan.

1。 6. Handling of high temperature heatstroke events

1。 6。 1A emergency plan

1。 6。 1。 1 move the heatstroke victim to a cool and ventilated place quickly, pad his head and unbutton his clothes at the same time, so as to facilitate breathing and heat dissipation and contact the medical staff;

1。 6。 1。 Apply a wet towel to the head, or apply an ice pack to the head, armpits and thigh roots of heatstroke patients. If the patient can drink water, he can drink more water and add a small amount of salt to the water;

1。 6。 1。 3 when the patient has difficulty breathing, artificial mouth-to-mouth breathing should be performed;

1。 6。 1。 After the medical staff arrived, the rescue work was taken over by the medical staff;

1。 6。 Secondary b emergency plan

1。 6。 2。 1 immediately remove all heatstroke victims from the work site, move them to a cool and ventilated place, and contact medical staff to arrive at the scene immediately for rescue work;

1。 6。 2。 2. Temporarily stop the on-site operation, check the ventilation and cooling facilities in the workplace, find out the cause of heatstroke, and take effective measures to reduce the temperature of the working environment to ensure the safe operation of the equipment unit;

1。 6。 2。 3. Inform the leaders of relevant departments to arrange personnel to replace heatstroke personnel to ensure the continuity of production;

1。 6。 2。 If the patient is seriously ill, contact the vehicle immediately and escort him to the hospital at the same time of rescue. If necessary, you can call 120 hospital emergency number for help;

1。 6。 2。 5. The leading group decides whether to organize the evacuation of workplace personnel according to the on-site development;

Emergency plan for construction in hot weather (6 general rules) (6 articles) 8

Dear Owner (Resident):

Hello everyone! Recently, in the hot and summer weather in many places, the property service center hereby reminds all residents to do a good job in heatstroke prevention and cooling to avoid accidents. At the same time, high temperature weather is more prone to fire accidents. Please always check the gas and circuit in your home, and the property will also strengthen the inspection of the corridor.

Specific precautions are as follows:

1。 When summer comes, please pay attention to safety when using electricity in daily life to avoid potential safety hazards caused by overload:

2。 Recently, many TV stations reported that the fire was caused by long charging time of battery cars, spontaneous combustion of lines or spontaneous combustion of motor vehicles in summer. In order to avoid such accidents, the service center suggests that you reasonably control the charging time and repair the vehicle lines, and don't pull wires in the corridor to charge without permission, so as not to bring life safety or property losses to you and others:

3。 If you are engaged in outdoor activities in hot weather, the service center also reminds you to bring heatstroke prevention and cooling supplies to avoid heatstroke:

In order to avoid fire accidents, the property will do the following work:

1。 Centralized investigation of the charging situation of electric vehicles placed in the corridor and at the door of the unit, and centralized cleaning:

2。 Arrange the order maintainer on duty to strengthen the inspection of the charging area of centralized electric vehicles at least once every two hours;

3。 Arrange the order maintainer on duty to strengthen the patrol of centralized parking areas such as the basement, especially the "old" cars;

4。 Set at least two fire extinguishers in the centralized charging area of electric vehicles, place fire-proof sandbags when necessary, and check the integrity of fire-fighting equipment in the basement:

Thank you for your cooperation! Wish a healthy body