Job Recruitment Website - Property management - Installation of elevator entrance guard controller

Installation of elevator entrance guard controller

Step 1: according to the position of the fixed hole on the controller bottom plate, punch holes in the appropriate position on the wall and drive in expansion bolts.

Step 2: Screw it into the hole with screws.

Step 3: Hang the controller on the screw and fix it on the wall.

Step 4: As shown in the above figure, fix the electric lock spare battery and NS2 spare battery on the chassis.

Step 5: Please refer to the figure below or the connection diagram on the chassis.

Note: The solid line in the drawing has been connected in the factory, and the dotted line needs to be connected by the customer himself.