How to make a budget sheet for rough house decoration

For many families, from the moment they are ready to decorate, the pace of decoration has never stopped, especially in the preparation work. Not only do you need to go to various building materials stores to simply understand the market price of materials, but you also need to make your own decoration budget in advance, and then make a comparative analysis with the quotations of designated decoration companies. Only when the preparatory work is done, can you rest assured to let go of the decoration. How to do the budget of rough house decoration? Bian Xiao listed a complete renovation budget table, which I believe is useful to you.

Community: Tian Yun, Yujiang City.

Area: 80 square meters

Decoration method: half package

Contract price: 45,500 yuan

80 flat blank room decoration budget table and details

Brand of auxiliary materials:

Wire: Wuhan No.2 Factory (He Fei brand)

Water pipe: Tian Li

Latex paint: Dulux

Plate: rabbit

Weak current: Akihabara

Gypsum board: Taishan Mountain

Mud powder: ant hole

Waterproof: B&R.

Project 1: basic project

Project types include content, technology and practice, and total amount (RMB)

Basic treatment of wall blank 536.00

Wall/ground cement mortar leveling 760.00

Door sealing head 240.00

Door cover base (joinery board) 220.50

Demolition of Brick Wall (120_)480.00

Demolition of Brick Wall (240_)440.00

Remove the original doors, windows and covers 55.00

Light steel keel double-sided gypsum board partition wall 200.00

Lightweight brick wall (120_ double plastering) 1 164.00

Paint the hole, beam bottom and other parts 450.00 after tearing down the wall.

Cabinet back sealing cement board 330.00

Demolition of balcony insulation board 200.00

Remove the indoor insulation board, bag it and transport it to the designated garbage dump in the community. 800.00

Project 2: Waterway and Circuit Engineering

Strong and weak current construction (total price) 6783.00

Waterway construction (total price) 1550.00

Installation of strong and weak current box 100.00

Replace sewer pipe (within PVC) 5 18.00

Replace the sewer pipe (inside PVC110)189.00.

Balcony outlet 300.00

Item 3: Guest Dining Room and Corridor

Basic treatment of latex paint (batch scraping putty) 2 100.00

Latex paint 840.00

Gypsum board linear ceiling with light trough 1330.00

Plasterboard ceiling 15 18.00

Gypsum board seal on upper part of cabinet 63.00

Wooden curtain box (concealed) (joinery board) 165.00

General specifications for floor tiles (500× 500

Shoe cabinet (eco-board excluding cabinet door) 1674.00

Item 4: Master bedroom

Basic treatment of latex paint (batch scraping putty) 10 12.00

Latex paint 404.80

Bookcase (eco-board) 450.00

Item 5: Second bedroom

Basic treatment of latex paint (batch scraping putty) 930.00

Latex paint 372.00

Wardrobe and cupboard (eco-board) 2667.24

Gypsum board seal on upper part of cabinet 89.00

Gypsum board cabinet rear partition 408.00

Item 6: Kitchen

General specifications for wall tiles (300× 450

Overall specification of floor tile (size 300×300)5 10.40

Waterproof treatment of kitchen 495.00

Kitchen and sanitary bag piping 325.00

Door stone paving 25.00

Cement mortar leveling of kitchen floor 308.00

Item 7: Toilet

General specifications for wall tiles (300× 450

Overall specification of floor tile (size 300×300)203.00

Toilet backfill and surface leveling 245.00

Waterproof treatment of toilet 8 10.00

Kitchen and sanitary bag piping 325.00

Door stone paving 62.50

The toilet sewer protection project is enclosed with small bricks and backfilled with coarse sand. 200.00

Item 8: Balcony

Basic treatment of latex paint (batch scraping putty) 108.00

Latex paint 43.20

General specifications for floor tiles (200× 200

General specifications for wall tiles (300× 450

Balcony railing foundation tiling 9 1.00

Waterproofing of balcony 3 15.00

Packaging sewage pipe 175.50

Item 9: Miscellaneous items

The material upstairs fee is 300.00.

Material transportation fee is 300.00 yuan.

Indoor garbage cleaning fee is 300.00.

Installation of lamps and lanterns 200.00

Sanitary ware installation 150.00

Hardware installation 100.00

Finished product protection 300.00

Digu 300.00

Item 10: Other expenses

Supervision fee is 999.00.

Star foreman service fee 3000.00