Job Recruitment Website - Property management - What does the plumber want to do?
What does the plumber want to do?
Plumber is the floor of hydraulic engineering (plumber) and electrician, referred to as plumber for short. Plumbers are construction workers. They install some simple circuits and waterways on the site. There are two kinds of plumbers, installation plumbers and maintenance plumbers. The installation of plumbers is mainly the installation of embedded fire bridges for civil water supply and drainage, as well as decoration, such as home decoration. The plumber is the water and electricity repairman recruited for hotels and school properties. The former is relatively tired, with low technical content, and is basically manual labor. The latter is relatively easy, but the technical content is not high.
What do you usually do in water and electricity installation?
Specific work and requirements for hydropower installation:
1, wiring principle: horizontal and vertical. Use special Cai Zhong PVC flame retardant conduit. The catheter must be fixed in the catheter. When the catheter is connected with the catheter, the locking nut should be used. A pipe clamp should be used for straight pipes every 80 cm and corners every 20 cm.
2. The socket is on the upper part of the wall, and the wall is vertically slotted upward to install decorative corner lines at the top of the wall. If it is in the lower part of the wall, the socket should be slotted vertically downward to the bottom of the skirting board, and the depth of the slot should be consistent. Grooved lines and tops should be ejected from the wall first, then cut the wall with a cutting machine and slotted with a machine.
3. When using Cai Zhong PVC pipes, we now use springs to bend them instead of 90-degree elbows and tees (at this point, we basically have no such situation at present). When installing the line, it is necessary to add a protective line sleeve and connect it with glue. The edge of the sleeve should be close, straight and smooth. At the right-angle corner, it should be cut at the inner side of the corner, and one side of the cut should be cut into circular seams, and then it should be bent and installed.
4. Pipe thread depth is moderate, without burr. Wrap the joint of the pipeline with raw material tape for 5 -6 times, and the number of winding teeth of the pipeline is 5-6, until the joint is tightened, and rotten teeth are not allowed to be inserted into the pipe.
5, wire into the casing, wire fixing tools should be used, first fixed on the wall and inside the wall, and then plaster hidden.
6. It is forbidden to directly lay the conduit under the composite plate. At this point, we haven't done a good job at present, and we will communicate with our customers in the future. The composite floor must be slotted. The conduit under the solid wood floor must be reinforced.
7. It is forbidden to lay the catheter in the kitchen and bathroom floor to prevent water from infiltrating into the catheter. There must be no conduit on the floor of the bathroom, which must be strengthened.
8. The wires passing through the conduit shall not be greater than 40% of the hole area of the conduit, and the wires in the conduit shall not have joints. It is forbidden to mix wires with different purposes in one conduit.
9. When the wire enters the box, make sure it has a certain length, which is 10 ~ 15cm, and the audio is 100cm. When installing and maintaining switches and sockets, please put on hoses.
10. The distance between the water filling pipe and the wall should be 1.5cm, and the left side is hot and the right side is cold, and the distance is 15cm.
1 1. The parallel distance between wires and water pipes should not be less than 30cm, and the crossing distance should not be less than 10cm.
12, there can be no joint between wire points, and the hidden wires in the ceiling must be protected with flame retardant pipes.
13, after the acceptance of water and electricity, the trunking can be leveled, and the wall slot should be filled with 1: 3 cement mortar (the wall should be leveled twice).
What does hydropower work mainly do?
If you go to the maintenance department, it is mainly the maintenance of equipment, regular inspection and maintenance. If you go to the business department, handling two votes is mainly the inspection and supervision of the board of directors.
What does the reformed hydropower mainly do?
Water: mainly engaged in the decoration of kitchen, bathroom and balcony. Reserve upper and lower inlets and basins, toilets, bathtubs, water heaters and washing machines for installation.
Electricity: mainly modify the position of socket switch, increase the wire diameter and the number of sockets in places with large electricity consumption, install TV, broadband and monitoring in weak electricity. There is also the addition and installation of lamps such as chandeliers.
What does a plumber mainly do? What are the more dangerous things to pay attention to?
Plumbers mainly install water and electricity.
Maintenance or something.
Dangerous things usually happen.
Climb high and prevent electricity.
You are not afraid to take adequate safety measures.
If you want to engage in this business, you must take classes and get a work permit.
What preparations do you need to make before decorating water and electricity?
Hydropower design is based on the basic maturity of decoration scheme, and the following preparations need to be made before hydropower transformation design.
1, do a good job of space division between functions, plane furniture layout, decorative ceiling layout. Examples: such as the placement and size of beds, wardrobes, computer desks and other equipment, the size and placement of dining tables, the audio-visual effects required by audio-visual rooms and so on.
2, personal preferences of kitchen and bathroom appliances, equipment model and size know fairly well. For example, the overall kitchen design scheme (completed by kitchen cabinet designers) is directly related to the determination of kitchen water and electricity scheme; There are many options for water heaters, such as gas, electricity (also divided into regenerative and instant heating), solar energy, wall-hung boiler hot water supply, and 24-hour residential water heater system.
Before hydropower design, you need to have a general understanding of the effect achieved by home decoration. Many people know what they want but don't know how to achieve this effect. If they don't understand, they can transfer the job to the hydropower designer. Generally, it is enough to make an appointment for the designer's on-site service 1-2 days in advance. The purpose of full communication on site is to solve the problem of achieving the required effect. On this basis, professional designers will put forward more reasonable suggestions for the owners' reference. Owners only need to master the final decision and adopt opinions selectively, and the results will be good.
What does a plumber do?
Plumber covers a wide range: (water supply and drainage, heating, fire water, municipal water supply and drainage, etc. ), electricity (high voltage and low voltage are divided into strong electricity such as lighting, weak electricity such as TV, VoIP, access control system, etc. ) and fire electricity, etc.
What does a plumber do on a construction site?
There are two kinds of site, one is a small number of companies, responsible for the installation and maintenance of temporary electricity on site, and the other is subcontracting projects, responsible for the pre-installation of hydropower projects.
What does a plumber do in home decoration? 10 point
The plumber and plumber that my family used only yesterday mainly changed the line and position of water pipes, the heating position, bathing position, basin position, bathroom position, sewer and floor drain position and so on. The plumber my family found is 600 yuan for two people. After a day's work, all the water pipes and heating are connected. After that, your home is almost decorated. You should find another one. Electrician is also the second phase, the first phase is 1 day, and it is also based on your needs to dig trenches and make underground wires, that is, the wires are all routed inside the wall. When the bricklayer is working, all the wires are used in the mortar. To decorate and install the Yuba, an electrician must be found. That's very complicated, and electricians and ground wires must be used to install the air conditioner. First-stage electrician 160 a day. After the renovation is completed, the second-stage electrician will be hired to install lamps and yuba. The salary is 100.
- Previous article:The Historical Evolution of chenghua district
- Next article:Appreciation of Youmao's Begonia Poems in Begonia Partridge
- Related articles
- How many years is the property right of Shantou Greenland Headquarters Center?
- Is it illegal to make a loft in a single apartment?
- What is the responsibility of the office of the property management company?
- What is the telephone number of Enshi Yuerongwan Tian Yue Marketing Center?
- How about Chuzhou Xiang 'en Decoration Co., Ltd.?
- Selected speeches on work attitude
- What is the telephone number of Beijing Jianfa _ Hospital Marketing Center?
- How are the job titles of China companies ranked, from big to small?
- What about Xi Datang Boren Human Resources Co., Ltd.?
- What about Tianjin Lincan Enterprise Management Service Co., Ltd.?