What are the preparations for taking over the acceptance?

I. Personnel preparation

1. Establish a takeover acceptance team.

Led by the property management enterprise management department, organize relevant personnel from the office, engineering department and planning department to participate. All departments should send skilled and responsible technicians, and generally need engineers with different specialties to join. The scale is generally 5 ~ 8 people.

2. Designate the person in charge, preferably the person in charge of this project.

Second, take over the acceptance data preparation

1. The acceptance documents include: relevant national technical standards and specifications.

2. Drawings: design drawings and construction drawings of the property, especially concealed engineering drawings and construction site records.

3. Forms: According to the contents of property acceptance, some acceptance record forms are designed in advance, such as house handover acceptance form, public facilities handover acceptance form, mechanical and electrical equipment handover acceptance form, indoor handover acceptance statistics, mechanical and electrical equipment handover acceptance statistics, etc.

Three. Conduct a preliminary on-site investigation

According to the design drawings and construction drawings, send the engineers and technicians who take over the acceptance team to the property site for preliminary investigation, so as to lay the foundation for taking over the acceptance work.