Decoration is a very complicated project with long process and many details. Many owners don't know what the decoration process is like. Today, Bian Xiao has prepared a rookie-level new house decoration strategy for everyone, so that you can bid farewell to the decoration in minutes!

0 1

Handle property formalities

Before construction, you need to go through the following decoration procedures with the residential property before you can start construction smoothly.

Sign the decoration agreement issued by the property.

Provide the property with its own decoration drawings, and the property mainly checks whether the demolition and reconstruction projects of water, electricity and walls are qualified.

Handle the Work Permit, which is the proof of the time limit for property inspection.

Handle entry and exit documents for workers.

Pay the decoration deposit. As long as you work normally, it will be returned within 3 months after the renovation is completed.

Pay the garbage clearing freight, which is used to pay for the garbage cleaning and decoration of the property.

02

Decoration disclosure

The first step is not to urge the decoration company to start work quickly. But about designers, foreman to do the final construction confirmation, the main contents include:

1. Confirm all the engineering projects and design drawings that need to be dismantled, such as defining doors and windows, walls, water and electricity, wall modeling, etc.

2. Confirm all decoration materials, and explain the materials that Party A and Party B are responsible for purchasing on site.

3. Clear acceptance criteria and specific payment nodes, preferably with written proof.

03

Demolition and transformation of main body

The main demolition and transformation mainly includes wall demolition, wall building, wall skin, heating removal, plastic steel window replacement, etc. After that, it is best to determine kitchen cabinets, range hoods, cookers and water heaters so as not to delay the construction period.

04

Hydropower transformation

Hydropower transformation is a concealed project, buried in the wall or under the tile. It is not easy to dismantle and change later. Therefore, it is necessary to determine the specific location of switches, lamps, sanitary ware, electrical appliances and furniture before decoration. Moreover, the kitchen cabinet designer will help you determine the transformation plan of kitchen power supply and waterway.

05

waterproof

After the completion of hydropower, it is necessary to wrap the riser of kitchen and bathroom with light steel keel or red brick. Then the kitchen, bathroom and balcony are waterproof.

06

Leveling and tiling walls and floors.

Level the cement floor first, and then tile the living room, balcony, kitchen and bathroom floor. Therefore, it is necessary to determine the entry date of tiles in advance and make an appointment for bricklayers to enter the site for construction on the same day.

After the wall and floor tiles are laid, the water heater can be installed, and the embedded flue check valve and smoke pipe are ready to be installed; Inform indoor wooden door brands to be present to measure the size of wooden doors and choose styles to start production. In addition, according to the final plan of cabinet brand, contact natural gas company to replace natural gas pipeline. Finally, you can inform the kitchen and bathroom ceiling brand to measure the ceiling and install it immediately.

07

woodworking engineering

Mainly engaged in all kinds of cabinets (cabinets made of large core boards for carpentry, not finished products) and wooden keels for ceiling and wall modeling.

08

paint works

Scrape putty and paint the walls. Generally blow putty 2-3 times. After scraping, polish evenly and prepare to brush latex paint. Protect the paint from touching the ground.

Need to remind everyone that if you want to paint the wall, you must pay attention to color matching. The adjusted color is lighter than the color card, and it must not be the same as the color card or darker than the color card. Because when you paint the wall, you have to brush it at least twice, and some have to brush it three times. The color of the upper wall will get darker and darker.

09

Furniture method

The last step of hard installation is to install custom furniture, doors, wooden floors, bathrooms and other hardware. The finished door should be installed before the floor, because the steps of installing the door are complicated and many tools are used. It can avoid unnecessary damage to the floor during door installation. Then complete a hard wall repair, and finished furniture, lamps and other soft clothes can enter in turn.