Engineering quality agreement

In the real society, the agreement is closely related to our life, and signing the agreement can protect both parties legally. Presumably many people are worried about how to write a good agreement. The following are four engineering quality agreements I have compiled, hoping to help you.

Project Quality Agreement 1 Party A:

Party B:

According to the quality requirements of the engineering contract signed by China Xinxing Baoxin Construction Engineering Company No.4 (hereinafter referred to as Party A) and the engineering construction unit, Party A and Party B reach the following agreement:

1. The subcontractor (hereinafter referred to as Party B) must reach the quality level of the project (or part) contracted by Party A. ..

2. Party A shall provide conditions for Party B to reach the above quality level according to the requirements of the labor service contract signed by both parties.

3. Party B must establish and improve the quality assurance system in accordance with the requirements of the labor service contract, and the management personnel of each type of work must hold relevant certificates.

Four. Party B shall conscientiously implement Party A's relevant quality management measures, carry out project quality management in strict accordance with ISO-9002 international standards, carry out construction in strict accordance with specifications and standards, and carry out quality self-inspection control in strict accordance with a series of standards such as National Standard for Quality Inspection and Evaluation of Construction and Installation Projects (GBS02 1 1-95). The management personnel of subcontractors must organize the construction in strict accordance with the scope of division of labor and the technological process compiled by Party A, and shall not cut corners. In strict accordance with the project intends to prepare the scheme and technical clarificaiton construction, not brutal construction; Strictly implement the self-inspection and mutual inspection in the "Three Inspection System", do a good job of "Three on the Wall" in time and truly, construct in strict accordance with the model, and conscientiously implement Party A's quality management system. The following requirements need to be met:

1. The excellent rate of subdivisional work must be achieved, and the unqualified rate must be controlled below; Must achieve the excellent rate of division project; The pass rate of one-time submission must reach 100%, and the comprehensive perception evaluation must reach.

2. Engineering collapse and major structural engineering quality accidents cannot occur.

3. The renovation project cannot be reworked in a large area.

4. The roof, bathroom, basement can't appear leakage; The pipeline shall not be blocked; There can be no cracks on the ground and wall; Cement floor can't sand; The exterior wall decoration of concrete structure should not be uneven, and the exterior wall coating should not peel, fall off and flower in a large area; There shall be no serious quality defects such as joints and steel bar displacement of cast-in-place concrete structures.

5. For the project contracted by subcontractors, the warranty and service obligations shall be earnestly fulfilled within the prescribed time limit, and Party A's engineering warranty and service management measures shall be implemented.

This agreement shall be subject to the supervision and inspection of the leaders of Party A and Party B and quality inspectors at all levels, and shall be comprehensively evaluated in combination with the quality control of the construction process after the completion of the project. Reward and punishment standards shall be subject to quality management assessment.

Seven, this agreement is in triplicate, four copies of the company's quality inspection department, the project intends to and subcontractors.

Eight. This agreement shall come into force as of the date of signing.

Signature of Party A: Signature of Party B:

Seal: seal:

Year, month, sun, moon, sun.

Part II Project Quality Agreement Employer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)

According to the Construction Law of People's Republic of China (PRC), Regulations on Quality Management of Construction Projects and Measures for Quality Warranty of Building Construction Projects, Party A and Party B sign the quality warranty of the project through consultation.

A, after the completion of the project review system

1. After the project completed by Party B has passed the completion acceptance of relevant departments, during the quality warranty period, Party B shall take the initiative to pay a return visit to Party A or the project property management company entrusted by Party A to find out what quality defects exist in the project undertaken by Party B, so that both parties can sum up their experiences and solve them in future project construction.

2. The return visit time is once a month after the quality warranty period begins, until the quality warranty period expires.

3. The object of the return visit is Party A or the project property management company entrusted by Party A. ..

Second, the project quality warranty scope and content

1. During the quality warranty period, Party B shall undertake the quality warranty responsibility of all projects within the scope of the construction contract stipulated in the construction contract in accordance with the management provisions of relevant laws, regulations and rules and the agreement of both parties.

2. All the quality problems or other defects in various parts of the project caused by Party B, as well as the owner's related losses caused by Party B's maintenance, are within the warranty responsibility of Party B, not the responsibility of Party A. ..

Three. The quality warranty period is one year, and the actual warranty period is calculated from the date when the project is actually completed, accepted and put into use.

Four. Quality warranty: the quality warranty of this project is calculated as% of the total settlement price of this project.

5. Return of quality warranty money: After the warranty period expires and Party B normally performs its obligations during the warranty period, Party A will return it without interest within 7 working days.

Six, quality warranty responsibility

1. During the warranty period, Party B shall repair and replace the quality problems caused by Party B for free; In case of failure or equipment damage caused by improper use or maintenance by Party A, Party B shall be responsible for paid maintenance (only charge for materials, not for labor).

2. The replacement parts within the warranty period must be new parts produced by the original manufacturer. The replaced parts belong to the property of Party B, and the replaced parts become the property of Party A. ..

3. During the warranty period, under normal circumstances, Party B shall send someone to repair the accident within 48 hours after receiving the accident notice from Party A. In case of emergency repair, Party B shall immediately arrive at the scene of the accident for repair after receiving the accident notice.

4. In case of the following situations, Party A may entrust others to repair, and all expenses incurred (including but not limited to labor costs, material costs, liquidated damages and other losses caused to Party A) shall be directly deducted from the quality warranty fund by Party A, and the insufficient part shall be made up by Party B within 5 days, and the original quality warranty fund shall be made up:

(1) Party B fails to send personnel for maintenance as required by Party A or fails to do so within a reasonable period of time;

(2) After two repairs, Party B still fails to repair the same part.

5. If the equipment and materials are replaced during the warranty period, the warranty period of the replaced equipment and materials shall be recalculated from the date of replacement.

6. During the warranty period, any safety accidents caused by Party B's quality problems shall be borne by Party B. ..

7. If all losses are caused by Party B's delay and prevarication, or economic losses and legal liabilities are caused to Party A (or the property management company in charge of the project), and the total amount of relevant quality deposit is not enough to pay, Party A (or the property management company in charge of the project) has the right to recover from Party B until bringing a lawsuit to the people's court.

8. After each maintenance, Party B is responsible for cleaning up the construction site and obtaining the acceptance signatures of the owner and Party A (or property management company).

9. The above warranty return visit record and whether Party B performs the warranty responsibility shall be subject to the signatures of the owner and Party A (or the property management company). Without the signature of the owner and Party A (or property management company), Party A will refuse to pay the due warranty money.

As an annex to the construction contract, the quality warranty of this project has the same legal effect as the construction contract and expires.

(There is no text on this page)

(Party A): (Party B)

Legal representative or entrusted agent (signature): Legal representative or entrusted agent (signature):

Tel: Tel:

Handler (signature): Handler (signature):

Contract signing time:

Date, year and month

Part III of Project Quality Agreement Party A: Hangzhou Li Shan Foundation Engineering Co., Ltd.

Party B: Engineering Project Department

Project location: pile type: specification: quantity: Project leader: full-time (part-time) quality engineer: contract cost:

In order to strengthen the quality management of construction projects, according to the "People's Republic of China (PRC) Construction Law", "Regulations on Quality Management of Construction Projects", "Regulations on Quality Management of Local Governments" and the company's quality management rules and regulations. Ensure the quality of construction projects. Both parties agree to sign the quality responsibility agreement of this project through consultation.

1, target:

Prevent and contain quality accidents in construction projects, conscientiously implement national mandatory standards, and ensure the qualified rate of construction projects 100%.

2. Responsibility of both parties

2. 1, Party A's responsibility

2. 1. 1 Party A shall implement total quality management for Party B's construction projects in accordance with relevant laws, regulations and systems of the state and the company.

2. 1.2. Party A has the responsibility to organize the functional departments of the company to conduct regular and irregular inspections on the projects under construction of Party B, and urge the rectification work. If the rectification is ineffective or there are serious quality risks, it will be punished according to the relevant regulations of the company.

2. 1.3 Party A has the obligation to guide the project department to collect and archive engineering data.

2.2 Party B's responsibilities

2.2. 1 Party B must abide by the Building Law, Regulations on Construction Project Management and mandatory quality management regulations promulgated by the state. The project manager is the first person responsible for quality, and is equipped with corresponding technical director and full-time (part-time) quality controller.

2.2.2 The project department must strictly implement the quality disclosure system, implement the quality control procedures to the team and each operator, and establish a standardized quality checklist in accordance with regulations and unified format.

2.2.3 Party B must carry out the construction according to the engineering design drawings and construction technical standards, and shall not modify the engineering design without authorization. In the process of construction, if errors are found in design documents and drawings, a work contact sheet shall be issued in time for modification.

2.2.4 Raw materials must be sampled as required when entering the construction site. Approved by the supervision company and qualified by the legal testing unit. It is forbidden to practise fraud and cut corners.

2.2.5 Party B must establish and improve the construction quality inspection system. Strictly manage each manufacturing process, and make records of quality inspection and concealed works.

2.2.6 Party B must collect engineering data timely, accurately and completely during the construction process, and the visa procedures are complete. Provide the company with a complete set of engineering data for archiving after completion. Return the quality deposit after the formalities are complete.

2.2.7 For quality problems caused by Party B's construction, Party B must bear all legal and economic responsibilities.

2.3 This Agreement is made in quadruplicate, two for each party, and shall come into force after being signed and sealed by both parties.

Representative of Party A: Representative of Party B:

(signature) (signature)

Signing date: 20 1.

Article 4 of the Project Quality Agreement Party A:

Party B:

Party B is responsible for the construction of the project undertaken by Party A, including all sub-projects included in the construction contract. Both parties have reached the following agreement on the construction quality of this project:

A, the engineering quality level

The project quality requirements meet the excellent standards of national or professional quality inspection and evaluation and the company's default standards. If the quality of the project does not meet the specifications, standards and design requirements, Party B shall rework the unqualified parts as required, and the cost of rework and the resulting material loss shall be borne by Party B. ..

Second, check

Party B shall carry out the construction according to the requirements of relevant national standards, specifications, design and model standards and Party A's instructions, and shall be inspected by Party A's representatives and their appointed personnel at any time.

Third, take cover engineering and intermediate acceptance

When the project meets the conditions of concealment or intermediate acceptance, Party B shall notify the relevant personnel of Party A 24 hours before acceptance after passing the self-inspection, and notify the supervisor for acceptance after passing the acceptance.

Party A's responsibilities:

1. Provide Party B with engineering drawings, quality standards and technical specifications.

2. Solve the technical problems raised by Party B in time.

3. Inform Party B of the change of drawings in time.

Party B's responsibilities:

1. Deliver excellent works to Party A. ..

2. Accept Party A's instructions and inspection.

3, cooperate to accept the inspection and acceptance of the superior unit.

4. Project progress: Party B shall plan the preparatory work before construction from the date of signing the contract, and provide the construction progress plan to ensure that the project is completed on schedule.

5. Delay for some reason: If the construction period is delayed due to design change, increase or decrease of engineering quantity or man-made disasters, Party A shall give appropriate delay according to the report of site construction personnel, and Party B has no objection. If the construction period is deliberately delayed, the losses caused shall be borne by Party B, and Party B will be fined 3% of the total project amount for each day of delay.

Four. Payment method: Party A shall allocate 80% of the project progress payment according to the qualified quantities completed by Party B in each period (30 days is a cycle, and it will be paid twice on the 5th of each month). After the completion of the project, it will be sent to the relevant departments for acceptance evaluation, and it will be paid to 95% of the settlement amount of the project payment within 1 month after the completion of the project acceptance settlement, and 5% of the project payment will be reserved as the project warranty payment, which will be paid after the warranty period expires.

Verb (abbreviation of verb) Apply for project payment: When applying for each project payment, Party B must provide the hourly list of completed projects in the current period, and submit it to Party A two days in advance, so that the on-site representative of Party A can confirm the completed quantities, and then forward it to the project manager and finance department for review, and finally the general manager will review the instructions.

Change of intransitive verb design: Party A has the right to change the scheme at any time, increase or decrease the number of projects, and Party B shall not object. Both parties shall increase or decrease the quantity according to the order price in this contract.

7. Party B shall be responsible for all drawings and construction instructions of this project. If Party A finds that the work done by Party B is inconsistent with the "drawings and instructions", it will be dismantled and redone, and Party B shall be responsible for the losses. If the construction drawings are inconsistent with the description, both parties shall settle them through consultation. During the construction process, if Party A needs to change the drawings, but Party B has finished the production, it shall pay Party B wages and assistance, and Party A shall be responsible for the waste of materials.

8. Party A has the right to assign personnel to supervise the project and guide Party B, and its employees must have work skills. If their work performance is poor, they do not obey orders or maintain order, Party B shall replace them within 24 hours after Party A's designated personnel notify the contractor, and shall not use them again, otherwise, they shall be fined 100 yuan each time, and Party A shall not be required to compensate for their negligence on the grounds of dismissing the workers.

Nine, Party B's team leader should be experienced and stationed in the construction site for a long time to guide workers' construction. If all workers have deviant behaviors and disputes caused by touching local public security laws and regulations, Party B will bear all responsibilities.

X. Party B must strictly implement the construction specifications, safety operation regulations, fire safety regulations and environmental protection regulations. In case of accidents or worker casualties, it has nothing to do with Party A, and the relevant parties shall bear the responsibilities according to the actual situation. If the codes and regulations are not strictly implemented, Party A has the right to order rectification; if not, Party A has the right to fine 200 yuan every time until he is ordered to leave the site and fails to pay the settlement project fee.

XI。 Party B shall strictly implement the company's rules and regulations. Laborers must be fully prepared for accommodation, medical care and hygiene, and must not defecate anywhere. In the construction site, children are not allowed to enter the site, slippers are not allowed, barefoot is not allowed, and bare back is not allowed. Otherwise, 50 yuan will be fined for every discovery.

12. All machines shall be purchased by Party B.. On-site machines shall be neatly stacked and shall not hinder or damage the construction of the site and its professional team. If there is any obstruction or damage, all responsibilities shall be borne by Party B. ..

13. During the project, if Party A has sufficient reasons to think that it is necessary to work overtime, Party B shall unconditionally implement it in order to finish it on time. If not, Party A has the right to impose a fine of RMB Wu Bai every time. 14. Before the formal acceptance of the project, Party B shall be responsible for the custody and democratic protection of all the finished products of the project and on-site machines, and Party B shall take full responsibility for any losses. In case of accidents and losses beyond human control, such as natural disasters and man-made disasters, Party B shall report to Party A within 24 hours. After investigation and verification, Party A shall handle them according to the following provisions:

1. Party A shall not be responsible for any loss of mechanical materials prepared by Party B at the construction site.

2. If the completed project does suffer losses due to failure to save it, Party A shall subsidize the salary as appropriate, and Party B has no objection.

15, the environmental sanitation of the construction site must be cleaned by itself, and useful materials should be piled up in a unified way.

Party A shall assign special personnel to clean the designated dumping site and keep it clean. If it is not cleaned every day, Party A has the right to fine 100 yuan every day. After the project reaches a certain section or is completed, all the wastes and sundries on the site shall be rented by Party A, and the cleaning expenses shall be paid by Party A. ..

Sixteen, this project by the personnel designated by Party A to complete the experiment, submitted to the relevant units for processing.

Quality supervision and inspection approval, the relevant departments that have the conditions for use, can be formally accepted. During the acceptance, Party B shall provide a summary of workers' ladders, etc. When Party A finds that the project does not conform to the drawings during the acceptance, Party B shall immediately correct it. The team leader should be on site during the acceptance, otherwise Party A has the right to fine 200 yuan every time.

17. Warranty period: Party B shall guarantee this project for one year from the date when Party A formally accepts it, and pay the warranty money within one week after the expiration of the warranty period. During the warranty period, if other losses are found in the project quality, Party B shall send someone to carry out maintenance within 24 hours after receiving the notice from Party A. If the maintenance is not carried out within the specified time, Party A has the right to ask others to carry out maintenance, and the expenses shall be borne by Party B.. If Party B fails to perform the contract, Party A has the right to claim compensation from Party B, and the warranty money will be cancelled.

18. Party B must carry out the construction in strict accordance with the decoration design change diagram and the quality acceptance standards and construction acceptance specifications promulgated by the state, and accept the supervision and inspection of Party A's on-site management personnel at any time. In case of quality accidents due to technical problems in the process, Party B shall unconditionally carry out maintenance until it meets the requirements and bear all the responsibilities.

19. Construction management: Party B shall submit the calculated list of construction materials three days in advance for Party A's on-site construction personnel to purchase and review. The required materials shall be transported to the construction site by Party A, and when Party B receives the materials, it shall fill in the warehouse receipt, and check and keep it at the site. When Party B handles the settlement in the future, Party A can calculate and analyze the position and quantity of materials according to the warehouse receipt quantity and the output of completed tasks. If it is found through calculation that Party B uses more materials than the products used on site, Party B shall be responsible for compensation, and Party B shall recycle the remaining materials and store them on site for reuse and reduce losses. 20. Under any of the following circumstances, Party A has the right to terminate this contract without paying remuneration to the settlement personnel.

Payment:

1. Party B subcontracts the works specified in this contract to a third party.

2. Party B fails to start work within the prescribed time limit or the project progress is slow after the start of work.

3. When Party B refuses to accept Party A's command and supervision.

4. When Party B cuts corners or wastes materials, which can't guarantee the project quality, or the same department reworks it for more than 2 times.