Does the owner need to supervise the renovation every day?

When decorating, if the owner has enough time, of course, it is best to go to the site to supervise the work every day ~ but to be honest, we may not have that much time. Dean believes that there is no need to supervise the work every day when decorating, just grasp a few key nodes to enter the site, and slick workers dare not be presumptuous.

There are a lot of building materials to be used in the decoration of materials. Building materials are divided into main materials and auxiliary materials, such as cement, tiles, water and electricity pipelines, stone, doors and windows, sanitary ware, hardware, glue, putty, latex paint, waterproof paint, etc. When materials enter the site, the owner had better personally check the brand, model, specification and quantity of materials to prevent workers from "shoddy" and replacing inferior materials in the decoration process.

When the project is accepted, after each project is completed, the owner should conduct on-site acceptance, such as laying tiles, laying water and electricity pipes and finishing the wall. If problems are found, workers can repair them in time to avoid wrangling in the future.

Slotting, drilling, demolition and reconstruction, just like houses, will have an impact on the main structure of houses, so the owners need to be present to supervise the work during construction. For waterproof, main body demolition and renovation, external wall perforation and other projects that affect the property and neighbors, the owner should also supervise the work on site and conduct acceptance to avoid disputes in the future.

At the end of the big link, the decoration is nothing more than several big links: demolition of old buildings, tiling, water and electricity, painting and carpentry. After each big link, the owner should check the decoration materials of this node to see how many materials are left and whether they have been replaced, so as to ensure the smooth progress of the next decoration link.

At the end of each small link, there are several small links below the big link of decoration, such as leveling the ground, waterproofing, painting the wall and scraping putty. , will affect the later decoration effect. Therefore, after the small link, it is also recommended that the owner conduct on-site acceptance.