Job Recruitment Website - Property management - How to apply for installing charging piles?

How to apply for installing charging piles?

Installation process of new energy vehicle charging pile;

1. Submitting application and review materials Generally speaking, after the owner buys an electric car, the pile factory submits the application materials to the power supply company, and it needs to provide a copy of the user's ID card, a confirmation letter of the charging conditions of the new energy minibus, a certificate of property consent to installation, and a certificate of parking space. Among them, whether it is a fixed property parking space or a rental parking space for more than 6 months, it can be proved.

2. After the installation and construction manufacturer determines the construction scheme, it is time for installation and construction. According to the conditions of each community and the location of the garage, the construction time is different. Some will only take 2 hours to complete, while others may take a whole day to complete the construction.

It should be noted that in the process of construction, users generally do not need to pay the construction fee for the first time, but if the construction is not completed in one day and needs to be delayed until the next day, the construction personnel will charge a certain labor fee, usually calculated according to the labor force and working hours, which is roughly several hundred yuan. In addition, the charging cable is free within 30 meters, and users who exceed 30 meters need to buy the cable themselves.

3. Acceptance is qualified. After the construction is completed, the charging pile company goes to the power company for filing, and the power company goes to the site for acceptance. Those who pass the acceptance will be stamped on the meter, and the power company will make corresponding electric cards, which will be collected by the charging pile company and handed over to the owner, or the owner will go to the power supply bureau to collect them himself.

Cost of installing charging pile:

The cost of installing the charging pile is mainly divided into the construction cost of the installer and the cable material cost.

How many charging piles need to be installed depends on the specific situation, so when there are few cables, the installation environment is simple and the cost is low. However, if the environment is complex and the cable length is expensive, there will be some differences in each place as to the specific cost.

Generally speaking, the charging pile installation service provided by the vehicle is free within 30 meters of the charging line, and there will be additional construction costs beyond 30 meters.

Therefore, it is suggested that car owners visit their parking spaces in advance and reduce the installation cost by designing short-term roads. Generally, there will be many power distribution rooms in the community, so the owners should choose one close to the parking space, which can save a lot of money when installing.