Annual work summary of supervision project
How time flies! A year passed quickly. Looking back on our work and life in the past year, we must have gained a lot. This also means that we are ready to start writing the year-end summary again. In order to make you stop worrying about the year-end summary, the following is the annual work summary of the supervision project I collected for you. Welcome to learn from it, I hope it will help you.
Annual Work Summary of Supervision Project 1 Although there are some management deficiencies, the supervision work of this project has achieved good results in 20xx. Any effect achieved by our supervision work can not be separated from the support and cooperation of the construction party. We will work harder in the future supervision work, adhere to the purpose of "strict supervision and enthusiastic service", and abide by the working principles of fairness, integrity and science to ensure the smooth progress of the future supervision work. The following is the self-evaluation summary of supervision work of Group A in the past year:
A, engineering quality control:
Principles of project quality control by project supervision department;
(1) Quality control runs through the whole process of project construction, and the idea of quality first runs through every link of the whole process of project construction.
(2) The project supervision engineer adheres to the principle of quality control in the whole process, and checks not only the product quality, but also the work quality, process quality and intermediate product quality;
It is necessary to control not only the quality acceptance of molded products, but also the engineering quality before and during construction.
(3) The engineering quality inspection and acceptance shall be carried out according to the design drawings, current construction specifications and quality evaluation standards, and the measured data shall prevail.
④ Adhere to people-oriented quality control in the whole process of quality control.
⑤ Adhere to the supervision mode of "strict control, active participation and enthusiastic service".
Review the contractor's construction plan and special plans for important processes, and supervise their implementation;
Strengthen the patrol inspection of key parts and key parts and stand by;
Witness materials shall be sampled and rechecked, and unqualified steel products shall be supervised to exit twice;
Take the concealed works seriously according to the acceptance requirements of the specification before agreeing to the next working procedure. Never let go of the problems existing in the main project (such as 1# building steel number error), and resolutely rework the rework;
Carefully check the grade and slump of commercial concrete;
Energy-saving thermal insulation materials shall be reinspected according to the specification requirements.
Second, the schedule control:
The construction period required by Party A of this project is very tight, and the construction party has formulated the general schedule, monthly plan and weekly plan according to the construction period required by Party A ... In the process of daily inspection, the problems found are pointed out in time to reduce unnecessary rework and reduce the impact on the construction progress. In view of many factors that affect the progress of the project during construction, the project supervision department conducts research and supervision by means of regular meeting minutes and special meetings, requiring the construction unit to adjust the construction plan in time, increase parallel operation, cross operation and overtime operation as much as possible, reasonably arrange and scientifically organize the construction under the premise of ensuring quality, and strengthen management to ensure the realization of the overall construction schedule. Do not relax the management of subcontractors designated by the owner, call relevant personnel to participate in the progress coordination meeting, and urge them to speed up the construction progress. For the matters determined by the construction unit, timely remind the construction unit to arrange as soon as possible, so as to reduce the adverse impact on the implementation of the project schedule.
Third, safety management:
1, strictly implement the Regulations on the Administration of Work Safety in Construction Projects, carry out the current national laws and regulations on work safety, the rules and regulations of the construction administrative department on work safety and the mandatory standards for construction projects;
2. Supervise the construction unit to implement the safety production organization guarantee system and establish and improve the safety production responsibility system;
3. Supervise the construction unit to educate workers about safety in production, and make safety technical disclosure for the divisional works;
4, review the construction scheme and safety technical measures. Check and urge the construction unit to implement the safety protection measures of the division, sub-project or each working procedure in accordance with the requirements of construction safety technical standards and specifications;
5. Supervise and inspect the construction site. Fire fighting, winter cold prevention, summer heatstroke prevention, civilized construction, health and epidemic prevention, etc. Conduct a comprehensive quality and safety inspection. Anyone who finds illegal and risky operations shall be ordered to stop operations. If potential safety hazards are found, the construction unit shall be required to make rectification. If the circumstances are serious, it shall be ordered to stop the operation for rectification and report to the construction unit in time.
6. This project has been carefully managed by my supervisor, supported by Party A and cooperated by the construction unit. So far, there has been no construction safety accident in the whole project, and civilized construction has won the nomination award of civilized construction in Hubei Province.
Four. Organization and coordination:
Because of the diversity and complexity of construction projects, and because different projects involve the changes of various personnel and their combinations, the ability of organization and coordination basically determines the effectiveness of the project director in charge of the whole project supervision department.
1, how to deal with the relationship with the owner
The current engineering reality determines the master-slave relationship between the owner and the supervisor. Many times, the owner's satisfaction with on-site supervision is the only yardstick to measure the quality of supervision work. Therefore, from the leadership of the supervision company to the work center of the project director, how to satisfy the owners. To handle the relationship with the owner, the premise is that the professional quality of the supervisor should be excellent and not give orders to others easily. In addition, when expressing positions and coordinating relations, we should pay attention to discretion and try to leave room for manoeuvre.
2. How to deal with the relationship with the quality supervision station?
The quality supervision station (including safety supervision station and material supervision station) that represents the government to perform the duties of project supervision is the most important external coordination object of on-site supervision, because the supervision and inspection of supervision behavior is one of the main work contents of quality supervision station. In general, the coordination of quality supervision stations is carried out by contractors (construction units). If the quality of the construction unit is good and the public relations are in place, supervision is relatively easy, because no matter how hard the on-site supervision work is, it is impossible to cover everything;
If the site management of the construction unit is chaotic and refuses to make efforts to coordinate the relationship, the supervisor will easily be implicated by the construction unit, bear joint liability, or be punished by informed criticism or the owner. In this case, the site supervisor should do his own work well, be good at self-protection, and ask the construction unit to rectify in writing in time;
Second, it is necessary to urge the construction unit to make on-site rectification, and at the same time, it is necessary to shoulder the corresponding public relations contact, turn passivity into initiative, and actively coordinate the relationship with the quality supervision station. Quality supervision station is not only a power department, but also an authoritative department, which has a very important influence on the smooth development of the project and has a strong guiding role in the work of on-site supervision, so it is very necessary to spend some time planning as early as possible. If properly coordinated, it can completely realize the benign interaction with the government supervision department and add wings to the on-site supervision work. 3, how to deal with the relationship with the construction unit
In fact, the relationship between supervisor and construction unit is more often an extension of the relationship between supervisor and owner. Some site supervisors blindly tolerate or even give up the necessary self-protection when they see that the owners are partial to the construction unit. Once there is a big problem, they can't shirk their responsibility. Dealing with the construction unit, the most important thing is to straighten out the relationship between the two. No matter how good the relationship between the construction unit and the owner is, it is not the owner. Although the personal interests of some owners are related to the construction unit, this does not represent the fundamental interests and overall interests of the owners. Moreover, the power exercised by the supervisor is given by the contract and the law, and it is not necessary to bow to the construction unit.
On the other hand, the construction unit pursues profit maximization, and any effort needs to be rewarded. If the supervisor abandons the principle and sacrifices the interests of the owner, there is also a price. Therefore, only by being modest and humble, supervising the construction unit with a civilized attitude and professional skills can we coordinate the relationship between the two sides and win the respect of the other side. 4. How to deal with the internal relationship of the project team?
Supervisors come from all corners of the country, with strong mobility, big age gap, different levels and different majors. Every supervisor wants his employees to have strong professional ability, high education level, good coordination ability and strong organizational discipline. However, in reality, it is often counterproductive, and some of them have just entered the industry and cannot be immune; Some words are unwritten and misspelled; Some are outspoken and bossy to the construction unit; Some are self-righteous and don't listen to the command. In the case of low regulatory threshold and fierce price competition, it is unrealistic to blindly force high-quality and low-cost supervisors. As a team, the most important thing for the on-site supervision project team is unity and centripetal force. Unity pays attention to the whole, and feet are short and inches long. Attention should be paid to giving full play to the advantages of each member, except those who are free and loose, like to create disharmonious factors, or are afraid of hardship and fatigue, and are greedy for small profits. As long as they love their jobs and are dedicated, people who can be self-disciplined can give full play to their strengths; Centripetal force means that the director should play a central role, set an example and encourage newcomers to learn as soon as possible; We should inspire veterans' sense of honor and strive for a higher level. V. Suggestions for the future development of the company: The market is the source of enterprise survival, and talents are the key to enterprise development. The competition between enterprises ultimately depends on the competition of talents. It is not easy for an enterprise to train people, and it is even more difficult to train a talent. Once the enterprise loses a large number of talents, it will directly affect the rise and fall of the enterprise. Supervision is a highly intelligent and scientific paid technical service. As a supervision unit, we should clearly realize that high-intelligence compound talents with great potential are the most precious wealth and source for the survival and development of enterprises. Put forward the following suggestions in terms of talents:
1. Establish a talent management system to improve employees' sense of competition.
2, based on the long-term, strengthen the talent pool.
3. Pay attention to the introduction and stability of excellent supervision talents.
4. In terms of employing people, we should follow the principle of "those who are capable are superior, those who are mediocre are inferior, and those who are mediocre are inferior" and use talents in an eclectic manner.
5. Strengthen the training of supervisors.
Over the past year, under the correct leadership of the company and the project department, under the reasonable arrangement of the director, and under the care and guidance of colleagues, the annual work summary 2 of the supervision project has worked hard for eight months with the company's quality objectives as the working goal and in the spirit of "unity and hard work, pioneering and pragmatic, scientific and fair, and dedication" (note: I reported to Su 'an Company on April 26th, 20XX), and basically completed all the work assigned by my superiors. As a member of Su 'an Supervision Company, we will report our work in the past year to the leaders as follows:
I. My Main Work Contents and Completion in 20XX
From April 27th, 20XX to May 22nd, 20XX, the leader asked me to supervise the installation of circulating jellyfish pipes in the domestic waste incineration power plant in Nanjing Jiangnan Vein Industrial Park, because the installation of the main steam turbine building has not yet started. Because there are not many things, during this period, I learned the "four diligence" methods while doing a good job in the installation supervision of circulating jellyfish pipes, namely: eye diligence, foot diligence, mouth diligence and hand diligence. Eye protection means taking the time to study supervision specifications, supervision service outline, supervision planning, design institute drawings, manufacturer drawings and specifications, and learning to modify various installation work instructions approved by the construction unit. Foot attendance means going to the construction site several times a day, mainly to familiarize yourself with the basic characteristics of garbage incineration power generation and study the difference between installation and maintenance. Teaching by word of mouth means asking more questions when you find problems, asking Mr. Zheng and other old supervisors, learning from them and asking how to do a good job in supervision. Attendance is to remember more and write more, keep a supervision diary, do a good job in inspection and approval of building materials, do a good job in examination and approval of inspection lots and construction drawings. There is no backlog of written materials submitted by the construction unit without special reasons.
After late May of 20XX, my affairs began to increase gradually. On June 2, 20XX, the underground fire water pipes and water supply and drainage pipes in the factory area started. 20XX June 17 The daily chemical workshop started. 20XX July 16, the installation of 32/5t crane in steam turbine room began (20XX August 23rd, 32/5t crane was put into use). The installation of 20XX # 1 steam turbine started on August 9th (20xx65438+passed the provincial quality inspection on February 6th, and 20xx65438+February 6th 10 steam turbine was capped successfully. )。 20XX started to install #2 steam turbine on September 27th (it is still in progress). 20XX started to install the comprehensive water pump house on August 2nd (20XX ended the installation on February 2nd, 65438). At present, within the scope of my supervision, 80% of fire water pipes, 60% of industrial water pipes, 98% of circulating water pipes and 95% of rainwater pipes have been completed; The chemical workshop has been commissioned; The comprehensive water pump house has been handed over for debugging; The # 1 turbine in the steam turbine room has oil circulation conditions, and the #2 turbine of 20xx65438+at the end of February has the condition of fastening the big cover. The feed water pump, deaerator and hot water tank have been handed over for debugging.
The above is what I have done in the past year. I learned to be a supervisor in the process of being a supervisor. In the past year, I have also written a detailed regulation on steam turbine supervision. 26 visa unpacking record; 36 visa installation records; Visa # 1 one copy of turbine foundation settlement record; Prepare a detailed description of the station; Compile the list of W, H and S control points; Make 9 on-site and on-site records; Prepare a strong supervision and implementation plan; Two visa mandatory lists; Issue 7 work contact sheets; 12 copies of the construction plan or work instruction were approved. Visa # 1 test report of turbine alloy steel parts; 10 visa concealed engineering records; Issue a rectification notice; Notice of visa defects. Wait a minute.
Second, work experience in the past year.
My experience in the past year has the following five points:
1. Obeying the arrangement of leaders, strengthening the study of theory and practice, being strict with oneself, serving the construction unit enthusiastically, and performing supervision duties according to the supervision contract, supervision specifications and supervision work procedures are the primary conditions for doing a good job in supervision and ensuring the installation quality.
2. For materials (such as pipes, valves, etc. ) approach, according to the standards and design requirements, check the relevant inspection data submitted by the construction party, check the appearance quality of the materials when they enter the site, and prohibit the use of materials with unsatisfactory appearance quality in the project, which is the basic condition to ensure the installation quality.
3. In the construction process, the methods of standing by, patrolling and parallel inspection are beneficial to the process control of each working procedure, to the investigation and study of the quality and safety problems existing in the site, to find the root of the problems, to supervise the construction party to carry out rectification and prevent similar problems from happening again, which is an important condition to ensure the installation quality.
4. Acceptance of concealed works shall be carried out in strict accordance with the acceptance specifications. If the acceptance is unqualified, the next working procedure can only be carried out after the rectification is qualified, which is a necessary condition to ensure the installation quality.
5. Inform the construction unit of the problems found in the construction process orally or in writing, report the problems to the director in time, and urge the construction unit to make rectification and recheck. It is a sufficient condition to ensure the installation quality to do the supervision work in the construction stage as much as possible.
III. Future Work Plan
In the future, we plan to strengthen the study of supervision theory, pay attention to the development of supervision industry at this stage, further realize the importance of supervision, take the initiative to think about the interests of the construction unit, be responsible for the quality of the project and the safety of the construction personnel. Further improve their professional skills and comprehensive quality, cultivate their good professional ethics, do a good job in supervision, embody the professional standards of law-abiding, honesty, justice and fairness, establish a correct supervision attitude, deal with various problems in construction with a practical and realistic working method, actively use their professional skills and intelligence, exercise their supervision rights and obligations scientifically and fairly, cooperate well with the construction unit, meet the requirements of the construction unit, and provide quality and efficient services for the owners. Earnestly complete the work assigned by the leaders, strive to raise their professional and technical level to a new level, and strive to become a truly qualified supervisor. Win glory for Su 'an Supervision Company.
The above is a summary of my work in 20XX years. If you have any complaints, please give me your suggestions.
;
- Related articles
- Excellent ingredients of baked sweet potato
- Is there anything delicious near Beishi's home?
- How to write decoration design instructions?
- What is the address of Gina Building in Dongying?
- What is the surrounding environment of Bai Jing Bay in Zhong Jun? Is life convenient?
- How about Binsheng Road Branch of Hangzhou Smart Home Real Estate Marketing Co., Ltd.?
- How about Jilin Huamei Property Service Co., Ltd.?
- How to investigate the property management of urban residential quarters
- How many Country Garden Districts are there in Tongliao?
- What about Xi Anhuikai Parking Equipment Co., Ltd.?