Job Recruitment Website - Property management - What is the basic process of decoration?

What is the basic process of decoration?

First, communication needs

Before the decoration, we must make it clear to the designer the needs of our house decoration, so as to understand the decoration style and detailed decoration needs.

II. On-site measurement room |

After understanding the needs of consumers, you need to go to the door to measure the house, understand the area of the living room and bedroom, understand the structure of the house, the designer designs the house, and then choose the main material of furniture.

Third, the design scheme

After obtaining the basic data of the house, we need to make a design plan according to the needs of consumers, and we need to confirm it with consumers repeatedly in the process of making it, because the content of the design plan needs to run through the whole decoration process.

Fourth, the selected materials

After the decoration scheme is determined, it is necessary to take consumers to choose the main materials and auxiliary materials in the exhibition hall, and confirm the detailed information such as specifications, colors, brands and prices of the selected materials to avoid inconsistencies in the materials used in the decoration process.

Verb (abbreviation for verb) review and confirmation

That is, after the material selection is completed, it is necessary to further confirm the selected auxiliary materials and main materials with consumers, and also confirm which items are included in the decoration and which items are not included to avoid additions and omissions in the decoration process.

Intransitive verbs sign contracts.

Both parties need to fulfill their obligations, and the contract is also a legal document binding both parties, so it is necessary to know the contents of the contract in detail to avoid the contract trap.

Seven, construction disclosure

Before the renovation, consumers, constructors, foremen and designers are required to confirm the renovation project at the renovation site.

Eight, the construction process

After the construction disclosure, the decoration began, including water and electricity decoration, waterproof engineering, carpentry work, brick laying engineering, mud tile engineering, etc. Need to be carried out one after another. The completion of each project requires professional acceptance. During the construction process, you can watch the renovation progress at any time to confirm whether the materials used are consistent with the selection.

Nine, soft outfit collocation

After the decoration is completed, furniture, lamps and lighting should be installed according to the decoration style.

X. Acceptance service

After the completion of the work, it is necessary to check and accept the decoration of the whole house, including whether the socket is electrified, whether the water flow of the water pipe is normal, whether the wall is cracked, whether the tiles are bulging, whether the tiles are empty, etc., and conduct Zhuo Yi investigation.

XI。 after-sales service

Generally, wall paint, waterproofing and other projects have a shelf life of after-sales service. During this period, problems will be repaired free of charge (except man-made damage), and regular visits will be made to learn about the detailed living conditions.