Job Recruitment Website - Property management - Where is the bidding for Yibin New Energy Food Processing Industry Project?
Where is the bidding for Yibin New Energy Food Processing Industry Project?
1. 1 This project subject to tender-Infrastructure Project of New Energy Manufacturing Industry Manufacturing Park (Phase II)-Xinyinan Expressway (high-speed rail line intersection) project (project name) has been approved by the Development and Policy Research Bureau of Yibin Sanjiang New District (name of project examination and approval or filing authority). This project has been approved by YJB [2208-511599-04-01-437170] FGQB-0235 (approval name and approval number). The owner of the project is Yibin Rong Hao Construction Engineering Development Co., Ltd., and the construction funds are raised by the enterprise itself (source of funds). The project has met the requirements of bidding, and now the general contract of design and construction of the project is subject to public bidding.
1.2 This project subject to tender has been approved by the Development and Policy Research Bureau of Yibin Sanjiang New Area (name of the approving authority) (the approval number of the project subject to tender is Sichuan Investment Equipment [2208-511599-04-01-4371237) Self-bidding Entrusted bidding). The tendering agency selected by the tenderer is/.
2. Project overview and bidding scope:
2. 1 Construction site: Sanjiang New District, Yibin
2.2 Construction content and scale: The construction content includes two crossing nodes, namely Henger Road, Chongqing-Kunming High-speed Railway and South Sichuan Intercity Railway, with a total length of about 320 meters and a width of about 40 meters. The intersection of Henger Road and Chongqing-Kunming high-speed railway is about 160m long and 40m wide, and the intersection of Henger Road and South Sichuan intercity railway is about 160m long and 40m wide. The cost of Jian 'an project is about 6.5438+0.2087 million yuan.
2.3 Duration: 40 calendar days; Construction: The intersection of Henger Road and Chongqing-Kunming high-speed railway takes 350 calendar days, and the intersection of Henger Road and South Sichuan intercity railway takes 180 calendar days.
2.4 Bidding scope: the design and construction of this project (if the owner has already obtained the design results, the general contractor must use them unconditionally) until the overall project is completed, accepted and handed over, as well as the defect repair and warranty work during the project warranty period.
3. The bidder qualification requirements:
3. 1 This tender requires bidders to have
3. 1. 1 Qualification requirements: 1. Independent enterprise legal person qualification and valid business license (all members of the consortium must provide); 2. Design unit: with Grade A and above design qualification of municipal industry (road engineering and bridge engineering) issued by the construction administrative department; 3. Construction unit: it has the qualification of general contracting of municipal public works or above issued by the construction administrative department, and the construction unit must have a valid safety production license.
3. 1.2 performance requirements: (multiple choices are allowed)
? Design performance requirements: in recent years (20 18 65438+ 10/0/to the deadline of bidding, not less than 3 years).
(? Is it finished? Completed or newly undertaken or under design) not less than 1 (1 to 3) similar projects. Similar projects refer to the design results of municipal public works across railways, bridges or frames.
? Construction performance requirements: in recent years (20 18 65438+ 10/0/to the deadline of bidding, not less than 3 years) (? Is it finished? Completed or newly undertaken or under construction) not less than 1 (1 to 3) similar projects. Similar projects refer to the construction results of municipal public works under bridges (spans) or on frames across railways.
? There are no performance requirements.
3. 1.3 qualification requirements for project manager:? Have the qualification of registered civil engineer (road engineering) or registered civil engineer (geotechnical)? By the design director? The person in charge of construction is a part-time employee,/(performance requirements), and is a member of the unit (such as the person who leads the consortium when bidding).
3. 1.4 Qualification requirements of design leader: Qualified as a registered civil engineer (road engineering) or a registered civil engineer (geotechnical engineering), and must be a member of the bidder's own company.
3. 1.5 qualification requirements of the person in charge of construction (the builder, the same below): the first-class (level) builder (registered major) of municipal public works has the certificate of safety production assessment (certificate B) issued by the competent department of housing and urban-rural construction at or above the provincial level, and must be the personnel of the bidder's own unit.
3.2 This bid was accepted by the consortium. Where a consortium bids, the leader of the consortium shall be? Design unit? The construction unit shall meet the following requirements at the same time: ① When the consortium bids, all parties to the consortium shall sign a consortium bidding agreement to clarify the rights and obligations of the consortium leader and each member unit; ② There shall be no more than 4 members (including the lead unit) forming all consortia; (3) The lead unit of the consortium shall have Grade A and above design qualification of municipal industry (bridge engineering) issued by the construction administrative department, and the lead unit of the consortium shall be responsible for paying the bid bond, the bidding activity and the full implementation of the contract; (4) The parties to a consortium shall not participate in the bidding of this project alone or in other consortia in their own names.
4. Acquisition of bidding documents:
4. 1 Anyone who is interested in bidding, please log on to Yibin Public Resources Trading Information Network (/) from 00: 00 on September 22, 2022 to 05: 00 on September 25, 2022 (electronic bidding documents can be obtained at any time, with no deadline). In addition, the tender documents can be obtained free of charge through the attachment of the tender announcement of this project.
4.2 The tenderee does not provide mail-order bidding documents service.
5. Technical service fee of trading platform:
The technical service fee for the trading platform of this project (or this bid section) is 170 yuan. The bidder must pay the technical service fee first, then pay the bid bond, and pay the technical service fee through the online bidding system of Yibin construction project before the deadline for payment of the bid bond (the process is: log in to the online bidding system of Yibin construction project-enter the "online bidding-pay technical service fee" page-select the project bid section-click Pay and use Alipay scan code to complete the payment-click "online bidding-pay technology" again after the payment is successful, and the payment of technical service fee is subject to the payment receipt issued by the system.
The technical service fee of the electronic trading platform paid by the bidder shall be collected by the corresponding electronic trading platform construction operator. After paying the technical service fee successfully, the bidder can select the corresponding engineering bid section on the page of "Online Bidding-Self-service Invoicing of Technical Service Fee", fill in and improve the invoicing information of ordinary tax invoices, and obtain the corresponding electronic invoices online.
6. Submission of bid documents:
6. 1 deadline for submission of bidding documents (deadline for bidding, the same below) is 2022-09-26 10:00.
6.2 Electronic bidding document submission method:
The bidder shall submit the bidding documents online in the form of data message encrypted by the bidder's digital certificate before the bidding deadline. Bidders must upload all bidding documents before the deadline for bidding, complete the "confirmation signature" and print the "receipt for uploading bidding documents" before confirming the uploading.
6.3 The tenderee will not accept the bid documents submitted late, not submitted in the prescribed way or not delivered to the designated place.
7. Announcement media:
This tender announcement is published on the national public resource trading platform (Sichuan Province).
- Related articles
- What is the public maintenance fund for 870,000 houses?
- Which way is Zhangzhou Wanda address?
- Where is Wuhai Xianghe home?
- Where can I get the fancheng district Public Security Certificate in Xiangyang, Hubei?
- What is the sales service hotline in Venice, Meizhou?
- Where is Shanwei Agile Shanhai County?
- Does property fee arbitration have an impact on owners?
- Essays on third-person personal evaluation
- Has Xiantao Xicheng Mingyuan opened?
- The latest epidemic prevention regulations in Hohhot