Hangzhou (city)
1) Xiaoshan District
"Projects that have been included in the solar energy application (demonstration) plan at or above the district level shall be supported according to the requirements of the higher authorities. For solar energy application projects that are not included in the plan and have an installed capacity of not less than 30KW, 0.2 yuan will be subsidized according to the actual power generation per kWh.
2) Yuhang District
"Under the premise of being included in the annual plan of photovoltaic power generation in the province, the installed capacity of photovoltaic power generation projects implemented in our district has reached more than 0.3 MW. After the application is approved, on the basis of relevant subsidies from the state, province and city, 0.2 yuan/kWh subsidy will be given according to its power generation from the date of power generation, and the subsidy period is tentatively set at 5 years (20 14-20 18). "
3) Fuyang City
On the basis of national and provincial subsidies, after the project is completed and put into production, the project investors will be subsidized according to the 0.3 yuan/kWh standard in the first two years and the 0.2 yuan/kWh standard in the third to fifth years. "
Distributed photovoltaic projects such as industrial and commercial enterprises implement power generation subsidies, while residential photovoltaics only have initial installation subsidies and no power generation subsidies.
4) jiande city
In addition to enjoying the relevant subsidies of the state and the province according to the policy, the municipal government will subsidize the actual power generation within three years from the date of power generation. Among them, 0.2 yuan/kwh is for enterprise's own use, and 0. 1 yuan/kwh is for internet users.
Ningbo City (with local protection)
Ningbo has introduced a municipal subsidy policy, but the county level has to introduce corresponding support measures to enjoy municipal subsidies. There is no additional subsidy for the policies issued by Yinzhou District and Yuyao City, that is, Ningbo City level subsidy is enjoyed, while Xiangshan County has an independent county level subsidy.
Municipal subsidy
By May 20 17, for photovoltaic power generation projects listed in the national and provincial plans and filed by provinces and cities, if photovoltaic modules and inverters produced by enterprises in our city are used for construction projects, on the basis of the power generation subsidy standards determined by the state and the province, the amount of power generation subsidy for this project will be 0. 10 yuan/kWh, and the subsidy period will be 5 years from the date when the project is connected to the grid. "
1) Yinzhou District
By May 20 17, for photovoltaic power generation projects listed in national and provincial plans and filed by provinces and cities, if photovoltaic modules and inverters produced by enterprises in our city are used for construction projects, a power generation subsidy of 0. 10 yuan/kWh will be given to the project from the date when the project is connected to the grid, with a subsidy period of 5 years.
Support qualified units to set up photovoltaic power generation system installation companies for new rural reconstruction, urban communities and individual customers according to the market mechanism, and give 0. 10 yuan/kilowatt-hour renovation subsidy according to the annual photovoltaic power generation after roof reconstruction, and the subsidy period is 5 years. "
2) Yuyao City
"By May of 20 17, the photovoltaic power generation projects listed in the national and provincial plans and filed by the province and Ningbo will be subsidized by no more than 0. 10 yuan/kWh from the date when the projects are connected to the grid. The subsidy period is 5 years, and the total annual subsidy does not exceed 5 million yuan."
3) Xiangshan County (national, provincial, municipal and county * * * four-level subsidies)
"For the photovoltaic power generation projects implemented in our county and put on record, with installed capacity above 0. 1 MW, the construction projects use photovoltaic modules and inverters produced by enterprises in our county (except Ningbo barter trade enterprises), and those completed during the period of 20 14 to 20 16 will be in the country and province from the date when the projects are connected to the grid for power generation. Local subsidies are implemented for photovoltaic power generation: first, enterprises that build their own photovoltaic power generation projects on the roof will be subsidized according to the standard of 0. 1 yuan/kwh for five consecutive years; Second, if the enterprise builds its own photovoltaic power generation project in other places except the roof, it will be subsidized according to the standard of 0.05 yuan/kWh for 5 consecutive years; Third, if a third party invests in the construction of a photovoltaic power station, the investor enjoys a subsidy standard of 0.05 yuan/kWh, and the roof resource provider enjoys a subsidy standard of 0.05 yuan/kWh for five consecutive years. "
Shaoxing city
1) Xinchang county
For distributed photovoltaic power generation projects invested by enterprises in this county, after completion and acceptance, subsidies will be given at 5% of the project equipment investment, and the amount of subsidies will not exceed 1.5 million yuan. Encourage energy-saving service companies to carry out distributed photovoltaic power generation projects with contract energy management mode.
Supporting power subsidy: If the registered enterprises in Xinchang County reasonably use the available space such as the roof in the county to implement distributed photovoltaic power generation application projects and complete grid-connected power generation as required, the county government will give 0. 1 yuan/kwh according to their actual power generation from the date of power generation, except for the state subsidy of 0.42 yuan/kwh and the provincial subsidy of 0. 1 yuan/kwh, and the subsidy will be implemented to 20/kloc.
2) Binhai Committee
For distributed photovoltaic power generation demonstration projects invested by enterprises, if they are found to be effective and worthy of promotion after completion and acceptance, 5% of the actual fixed assets investment will be subsidized, and the subsidy funds will not exceed 2 million yuan. The subsidy funds will be included in the special fund plan for strategic emerging industrial projects in Xincheng in that year.
Encourage energy-saving service companies to carry out distributed photovoltaic power generation projects with contract energy management mode.
Supporting power subsidy: new distributed photovoltaic power generation projects are built by households and enterprises in new urban areas by investing in roofs, open spaces and barren slopes. And grid-connected power generation will be completed before the end of 20 18. After the project is completed, the national subsidy policy is 0.42 yuan/kwh and the provincial subsidy policy is 0./kloc-0 yuan/kwh according to the actual power generation, which will be given to 0.2 yuan/kwh by the new city finance with reference to the relevant policies of Shaoxing.
Distributed photovoltaic power generation projects, except for the national subsidy of 0.42 yuan/kWh and the provincial subsidy of 0./kloc-0 yuan/kWh according to the policy, will be subsidized by the local government (administrative committee) according to its actual power generation from the date of power generation, and the subsidy period is five years.
3) Quzhou City
Quzhou City and its subordinate Longyou County and Kaihua County only have on-grid tariff subsidies, and there is no electricity tariff subsidy. Qujiang District and Jiangshan City have separate electricity subsidies.
Municipal subsidy
"In Quzhou Green Industry Cluster, we will carry out a pilot project of centralized contiguous development of rooftop photovoltaic power generation. It is tentatively scheduled to purchase local photovoltaic products in green industrial clusters and build distributed photovoltaic power generation projects within five years. On the basis of the province's on-grid tariff of 1.0 yuan/kwh, the on-grid tariff will be subsidized to 0.3 yuan/kwh. For projects that have enjoyed various national and provincial subsidy policies, the electricity price subsidy will be approved after the evaluation according to the above standards. The specific measures shall be formulated and implemented by the Municipal Economic and Information Committee in conjunction with relevant departments. "
Remarks: What is implemented is on-grid tariff subsidy, not power generation subsidy.
① qujiang district.
"Photovoltaic power generation enterprises registered in qujiang district, in addition to enjoying national, provincial and municipal subsidies according to policies, will be given a subsidy of 0. 1 yuan per kWh according to their actual power generation, tentatively for 3 years. From the date of implementation of the Opinions, enterprises that have built grid-connected power generation within three years will enjoy this policy. "
② Longyou County
"For projects with installed capacity 1mw or above implemented within the county, the policy of" one award and one subsidy "will be implemented. The first is the return on investment. According to the installed capacity of the implementation project, a one-time reward will be given to each watt of 0.3 yuan. The second is power generation subsidies. Photovoltaic power generation will be subsidized by electricity price. Within five years, the photovoltaic power generation project built in this county will be subsidized by 0.3 yuan/kWh on the basis of the provincial on-grid tariff of 1.0 yuan/kWh. Projects that have received special funds from the state and the province (such as the "Golden Sun" project) will no longer enjoy the "one award and one subsidy" policy. "
③ Jiangshan City
"Distributed photovoltaic power generation project. The project construction will be given a one-time subsidy per watt 0.3 yuan according to the installed capacity; Self-use electricity will be subsidized by 0. 15 yuan/kwh on the basis of national and provincial subsidies.
Photovoltaic power station project. The project construction will be given a one-time subsidy per watt 0.3 yuan according to the installed capacity; On the basis of the national benchmark electricity price and provincial subsidies, the on-grid electricity price will subsidize 0.2 yuan/kWh.
4) diankou town, Zhuji City (local protection)
Households with household registration in diankou town (meters are used by residents) use roofs to invest in new distributed photovoltaic power generation projects (including loan investment and self-owned capital investment) and complete grid-connected power generation before the end of 20 16, which is in line with the Implementation Opinions of the People's Government of Zhejiang Province on Further Accelerating Photovoltaic Application to Promote the Healthy Development of Industry (Zhejiang [2065438+03] No.49). And signed a photovoltaic power generation project with a photovoltaic enterprise (unit) registered in diankou town. After the project is connected to the grid and passed the acceptance, it will be subsidized according to the standard of 3,000 yuan per kilowatt hour per household, with the maximum limit of 1 1,000 yuan (the top 500 households will be subsidized).
Before the end of 20 16, all administrative villages (communities, neighborhood committees) and standardized enterprises will be subsidized according to 10% of the investment, and each investor will be capped at 100000 yuan. The above photovoltaic subsidies are paid in the current year.
Diankou town residents' families and enterprises use roofs, open spaces and barren slopes to invest in new distributed photovoltaic power generation projects, and the grid-connected power generation will be completed by the end of 20 16, which is in line with the Implementation Opinions of Zhejiang Provincial People's Government on Further Accelerating the Application of Photovoltaic to Promote the Healthy Development of Industry (Zhejiang Fazheng [2013] No.49). And signed photovoltaic power generation projects with relevant enterprises (units) that have obtained the photovoltaic power generation plan indicators of the provincial and Shaoxing Municipal Development and Reform Commissions. After the project is completed and passed the acceptance, from the date of power generation, in addition to the national policy of 0.42 yuan/kWh (valid for 20 years), the provincial policy of 0./KLOC-0 yuan/kWh (valid for 20 years) and Zhuji 0.2 yuan/kWh subsidy (valid for 5 years), it will also enjoy 0./KLOC-0 yuan/kWh subsidy (up to 20.
Lishui city
From 20 14 to the end of 20 16, the output of photovoltaic power generation projects (including personal projects) that have been completed and put into operation will be subsidized by 0. 15 yuan/kwh on the basis of national and provincial regulations, and will be subsidized continuously for 5 years from the date of power generation.
Yiwu city
Implement the financial subsidy policy for photovoltaic power generation projects;
Residents who implement photovoltaic power generation projects will be given a one-time subsidy of 2 yuan/watt according to the installed capacity.
For enterprises that provide venues for photovoltaic power generation projects, enterprises that provide roofs will be given a one-time subsidy of 0.3 yuan/watt according to their installed capacity.
Enterprises investing in photovoltaic power generation projects will be given 0. 1 yuan/kwh according to the power generation, and the subsidy will last for 3 years. Photovoltaic power generation projects no longer enjoy other municipal financial subsidies.
Photovoltaic power generation projects that have enjoyed state subsidies such as "Golden Sun" and "Photovoltaic Building Integration" are no longer subsidized.
Dongyang (local protection)
For the photovoltaic enterprises registered in Dongyang and the newly-built photovoltaic power generation projects in Dongyang, according to the actual power generation after the completion of the project, on the basis of enjoying the national and provincial financial subsidies, subsidies will be given according to the 0.2 yuan/kWh standard for three consecutive years.
Taizhou
For distributed photovoltaic power generation projects that have been connected to the grid before the end of 20 16, on the basis of enjoying the state subsidy of 0.42 yuan/kwh and the provincial subsidy of 0. 1 yuan/kwh, the local government will subsidize the actual power generation by 0. 1 yuan/kwh within five years from the date of grid connection.
Encourage all photovoltaic power generation application projects implemented in urban areas to adopt photovoltaic products produced by photovoltaic enterprises in this city under the same conditions. Projects that have received relevant subsidies from the central government (such as the "Golden Sun" project) no longer enjoy this policy.
Yongkang city
In addition to the state subsidy of 0.42 yuan per kilowatt hour (with a term of 20 years), Zhejiang Province can also enjoy the subsidy of 0. 1 yuan -0.2 yuan (0.2 yuan, connected to the grid at the end of 20 18 and connected to the grid at the end of 20 18).
Pan 'an County, Jinhua City
In terms of supporting policies, residents' photovoltaic power generation projects included in the annual plan of Pan 'an County will be given a one-time subsidy of 3 yuan/watt according to the installed capacity, with the maximum subsidy not exceeding 9,000 yuan.
Enterprises included in the annual plan of county photovoltaic power generation projects will invest in photovoltaic power generation projects from the date of grid-connected power generation. On the basis of national and provincial subsidy policies, 0.2 yuan was subsidized for three consecutive years per kilowatt hour. State Grid Jinhua Power Supply Company is responsible for the statistics of power generation, and the county finance bureau is responsible for the allocation.
Huzhou city
Huzhou has no municipal subsidies.
1) Anji county
"For the electricity generated by photovoltaic power generation projects, the electricity fee subsidy policy is implemented. The subsidy standard is based on the national and provincial preferential policies, and the county-level subsidy is 0. 1 yuan/kwh. Since the date of power generation, it has been subsidized for two consecutive years. Photovoltaic power generation projects that have enjoyed national project investment subsidies are no longer subsidized. For enterprises and other units to install new energy products such as photovoltaic power generation, subsidies will be given according to the standard of 15 yuan/square meter. "
2) Deqing County
"The distributed photovoltaic power generation project implemented in our county, according to the actual power generation effect after the completion of the project, will be subsidized by 0. 1 yuan/kwh according to its annual power generation, in addition to enjoying the relevant national and provincial subsidies according to the policy, and will be subsidized continuously for three years from the date of power generation. Among them, for the construction of distributed photovoltaic power generation projects on the roofs of industrial plants, the roof enterprises that implement photovoltaic power generation projects will be subsidized in the first year, and the photovoltaic power generation investment enterprises will be subsidized in the next two years. Photovoltaic power generation projects that enjoy project investment subsidies will no longer enjoy rewards. Families and residents who invest in photovoltaic power generation projects will be given a one-time 2 yuan/watt subsidy according to the installed capacity, with a maximum of 1 10,000 yuan, and will not enjoy county-level power generation incentives.
Wenzhou city
1) Dongtou County, Wenzhou City
In addition to enjoying the relevant subsidies of the state and the province according to the policy, 0.4 yuan subsidies will be given to all power generation (including spontaneous self-use and online electricity) for five years; Among them, it will be included in the demonstration project of "photoelectric tourism integration" in outlying islands, and in addition, 0. 1 yuan will be awarded every degree. If the photovoltaic power generation system is installed on the roof of residents' homes, 2 yuan will be given a one-time reward according to the installed capacity per watt; And give 0.2 yuan subsidy per kWh according to the power generation, once for five years.
Renting the roof of a civil building to install a distributed photovoltaic power generation system will give the roof owner a subsidy of 0.05 yuan per kWh according to the power generation, which will be completed within five years from the date of power generation, and the self-built mode of enterprises (residents) will not be completed. If the roof of a building owned by the government (state-owned enterprise) is rented to install the distributed photovoltaic power generation system, the government (state-owned enterprise) should provide the roof lease for free in principle, and the lease term is generally 10-20 years.
2) Ruian City, Wenzhou City
In addition to enjoying the relevant subsidies of the state, province and Wenzhou according to the policy, 0.3 yuan will be subsidized per kWh for all power generation (including spontaneous self-use and online electricity) for a period of five years.
For the roof rental subsidy for distributed photovoltaic power generation, the subsidy is 0.05 yuan per kWh, which will be filled within five years from the date of power generation, and the self-built mode of enterprises (residents) will not be filled; Government, state-owned enterprises and other public construction projects to install distributed photovoltaic power generation system, in principle, provide free roof lease, lease period of more than 25 years.
3) Yueqing City, Wenzhou City
If distributed photovoltaic power generation facilities are installed through roof leasing, the roof owners will be given a subsidy of 0.05 yuan per kWh (including tax) according to their power generation, and the subsidy will last for five years from the date of power generation. Enterprises (residents) self-built model projects do not enjoy this subsidy.
New distributed photovoltaic power generation projects, in addition to enjoying the relevant subsidies of the state and the province according to the policy, will be subsidized per kWh (including tax) by the project construction and operation enterprises according to their annual power generation, and will be subsidized continuously for 5 years from the date of power generation. Enterprises (residents) self-built model projects, after the completion of the project owners to enjoy subsidies.
4) Yongjia County, Wenzhou City
1) For photovoltaic power generation projects with an installed capacity of more than 50kW except for residents in the county, in addition to enjoying relevant subsidies from the state, province and city according to the policy, subsidies will be given for five consecutive years from the date of power generation, and the subsidy standard is 0.40 yuan/kWh; 2) If a photovoltaic power generation system is installed on the roof of a family, 2 yuan /W will be given a one-time reward according to the installed capacity, and 0.3 yuan/W will be given a subsidy in the first five years after it is completed and put into operation.
5) Taishun County, Wenzhou City
Within the scope of the county, those who install and put into use distributed photovoltaic power generation systems will be given a 0.3 yuan subsidy per kWh in addition to the relevant national and provincial subsidies according to the policy, and the subsidy will last for 5 years from the date of power generation.
Jiaxing pinghu city
For enterprises registered in our city to invest in the construction of photovoltaic power generation projects in our city and the installed capacity of a single project reaches 0. 1 MW and above, subsidies will be given according to the standard of 0. 15 yuan/kwh in the first two years and 0. 1 yuan/kwh in the third to fifth years from the date of completion of the project; For rooftop photovoltaic power generation projects invested in residential roofs, subsidies will be given according to the standard of 0.2 yuan/kWh in the first two years and 0. 1 yuan/kWh in the third to fifth years from the date of completion of the project; The implementation of power generation subsidies, the subsidy period is tentatively set at 5 years. "
I hope I can help you, thank you
- Previous article:How about Baoding Yang Fan Property Service Co., Ltd.
- Next article:Did the government subsidize Pingxiang during the epidemic?
- Related articles
- Guangming City Property Working Hours
- When will Zhengzhou Jinmao Poly Ruyi House deliver the house?
- Zhenxin Road to Taihe Road, Baoshan District, Shanghai 14 17.
- What is the floor area ratio of Ding Sheng Yuexi Station in Huizhou?
- Will the rotten sofa property management be handled?
- How many kilometers is it from Xiamen to Quanzhou?
- The specific content of the measures for the implementation of urban water supply price management in Hunan Province
- How about Hunan Yixinda Car Rental Service Co., Ltd.?
- What are the requirements and regulations for the work clothes of the property management company?
- Where is Qingdao Ruihai Blue Mountain?