Working standards of staff in property engineering department and working standards of property department

1, patrol the high-pressure room every two hours and clean the room every day.

2. Check the low pressure chamber every two hours in each shift and clean it once a day.

3. Patrol the generator room once every two hours, and clean it once a day.

4. Patrol the power distribution room every two hours, and clean the room once a day.

5. Check the domestic water pump room, fire water pump room and central air conditioning room every two hours per shift, and be responsible for the maintenance of indoor equipment; The pump body and floor are cleaned once a week, and the control cabinet is cleaned and dusted once a month.

6, check the sewage pump twice a day, and is responsible for equipment maintenance, cleaning dust control cabinet once a month.

7, once a week to check the elevator lobby and office area air conditioning, and is responsible for the maintenance.

8. Patrol the water and electricity meter room once a week, and be responsible for floor cleaning and equipment maintenance once a month.

9. Check the room once a week for fire hazards.

10, each shift starts and stops peripheral, facade, garden lighting, lamps, air conditioning and other equipment according to the schedule.

1 1. Transcribe the actual consumption readings of water and electricity meters on time per shift, and report to the superior leaders in time according to regulations.

12, responsible for daily maintenance and emergency repair, to ensure that the equipment is in good condition and normal.

13, the generator is debugged twice a month.

14. Provide paid services for users' indoor equipment.