Job Recruitment Website - Property management - Do I have to pay the elevator fee if the house is not decorated?

Do I have to pay the elevator fee if the house is not decorated?

If the house is not decorated, you need to pay the elevator fee, because the elevator fee is included in the property fee, and the property fee will be paid after the new house is handed over, so you need to pay the elevator fee. No matter whether the new house is decorated or not, as long as it is paid, it is necessary to pay the relevant property fees.

New house decoration steps and processes?

1. Commencement disclosure: The owner, designer and supervisor need to be present together to explain the process, acceptance criteria, additions and deletions at the construction site. About half a day. Special attention: If necessary, dismantle and check the items that need to be kept on site, such as air conditioners, furniture, electrical appliances, etc. The owner needs to tell the foreman how to deal with it.

2. Demolition: about 3-5 days.

3. Water and electricity disclosure: Whether there is a water purifier, garbage disposal, etc. Cross together; If there is floor heating and fresh air, it is necessary to negotiate the order with the construction party. Note: Fresh air construction takes 2 days and floor heating construction takes 3 days. Cabinet measurement, heating renovation and window measurement can be done before disclosure, or before disclosure. About half a day.

4. Hydropower transformation: pay attention to the slotting of hydropower and air conditioning, and arrange construction if there is a wall-mounted toilet. During hydropower construction, bricks can be selected, windows can be changed and entrance doors can be measured. About five days.

5, water and electricity acceptance: ready to buy a switch panel, as well as angle valves and floor drains. About half a day.

6. Kitchen and bathroom wall filling and cement leveling: After the water and electricity are qualified, the groove can be filled. Remember to go downstairs to the neighbor's house to see if there is any water leakage. About 1 day.

7. Tile the balcony, brush the kitchen and bathroom for waterproofing, and do the water closing test: during this period, you can choose the floor, set the threshold stone, prepare the non-return valve of the smoke stove, and paste the jointing agent of the external corner strip of the tile. About 3-5 days.

8. Tiling kitchen and bathroom: During this period, notify the cabinet manufacturer to prepare the copy quantity, and notify the door factory to make home measurements. Install entrance door before tiling. About 3-4 days.

9. Tile or cement floor leveling: Pay attention to the maintenance of the floor. In the meantime, water heaters and check valves can be installed for gas conversion. Inform the kitchen and bathroom ceiling to measure at home. About 1-3 days.

10, plaster leveling wall and top surface: pay attention to plaster line. During this period, you can choose bathroom, electrical appliances and furniture. About 2-3 days.

1 1. Oil workers scrape putty (2-3 times): buy paint before brushing putty for the first time. About 3-5 days.

12, putty polishing: 1 day or so.

13, brush one bottom and two sides: the effect of priming paint is good, preventing the bottom layer from returning to alkali, preventing corrosion and increasing the adhesion of paint. During this period, kitchen and bathroom and balcony ceiling can be installed; Prepare switch panel lights and install them. About 2-3 days.

14, cabinet installation: 1-2 days or so. Door installation: 1 day or so. Floor installation: about 1 day. Bathroom installation: about half a day. Wall repair, land reclamation, cleaning: return excess tiles, and repair main materials such as wooden doors. Find a cleaning company to do land reclamation and cleaning. About 1 day. Furniture entry: about 2-3 days.