Measures of Zhuhai Municipality on the Administration of Gas

Chapter I General Provisions Article 1 These Measures are formulated in accordance with relevant laws and regulations and in light of the actual situation of this Municipality in order to standardize the operation and management of gas, serve the society and ensure public safety. Article 2 These Measures shall apply to related activities such as gas development and planning, gas facilities construction and protection, gas operation and service, gas use and gas safety management within the administrative area of this Municipality. Article 3 The municipal gas administrative department shall be responsible for the overall planning, coordination, supervision and management of the city's gas industry.

Development and reform, price, finance, state-owned assets supervision and management, urban and rural planning and construction, public security, quality and technical supervision, safety production supervision and management, urban management administrative law enforcement, transportation, environmental protection, industry and commerce administration and other relevant departments shall, according to their respective functions and duties, do a good job in gas management. Article 4 The Municipal Gas Industry Association is composed of local gas enterprises, gas appliance production, operation, installation and maintenance enterprises, and gas engineering design, construction, supervision and other related enterprises, which play the role of organization, coordination, service and assistance in supervision, and accept the supervision and management of the municipal civil affairs department and the municipal gas administrative department. Chapter II Planning and Construction Article 5 The municipal gas administrative department shall, jointly with the municipal urban and rural planning department, formulate the city's gas development plan, organize its implementation after approval, and implement gas construction projects in the regulatory detailed planning.

The gas development plan shall include pipeline gas, bottled liquefied petroleum gas and gas vehicle refueling. Sixth gas development planning should be combined with the actual city, adhere to the principle of ensuring supply and scientific development, accelerate the development of pipeline gas, and rationally arrange and build centralized supply stations for bottled liquefied petroleum gas.

The setting of gas vehicle filling stations should give priority to the land for natural gas transmission stations, and be merged with automobile filling stations when conditions permit. Article 7 The construction of gas facilities shall meet the requirements of gas development planning, and the planning procedures shall be handled in accordance with the relevant provisions at all stages of project construction.

According to the gas development plan, the supporting construction land of gas facilities shall not be changed without the approval of legal procedures. Article 8 The gas use and road construction projects in the planned gas supply area of pipeline gas shall simultaneously build pipeline gas facilities and adopt municipal gas pipe network for unified gas supply.

In the area covered by the municipal gas pipeline network, it is forbidden to build new temporary gas supply devices such as gasification stations and bottle group stations to supply gas. Temporary gas supply devices, such as gasification stations and bottle group stations, which have been built and are still in use, should be gradually connected to the municipal gas pipeline network for gas supply.

In areas not covered by the municipal gas pipeline network, pipeline gas enterprises are responsible for providing temporary gas supply devices such as gasification stations and bottle group stations, and the construction unit is responsible for providing land and houses needed for the construction of temporary gas supply devices. Article 9 The construction unit shall be responsible for the investment and construction of new pipeline gas facilities within the red line of planned construction land for construction projects, and shall design, construct and complete them simultaneously with the main project.

If the pipeline gas facilities are not built simultaneously with the main project, the main project will not be completed and accepted for the record. Tenth gas engineering survey, design, construction units should have the corresponding qualifications, supervision units should have the qualification of gas thermal engineering supervision.

Construction units that install, renovate and maintain gas boilers, pressure vessels and pressure pipelines shall obtain the corresponding administrative license from the safety supervision and management department of special equipment before engaging in installation, renovation and maintenance activities. Eleventh construction projects in the planned gas supply area of pipeline gas involve the planned gas quantity and gas supply mode, and shall solicit the opinions of the municipal gas administrative department. Twelfth municipal gas administrative departments shall organize the preparation of pipeline gas engineering technical guidelines in line with the actual situation of this Municipality. The construction of pipeline gas engineering shall comply with the technical guidelines for pipeline gas engineering in this Municipality.

The construction drawing review institution shall review the construction drawing design documents in accordance with the technical guidelines for pipeline gas engineering in this Municipality. Thirteenth construction units commissioned by the construction drawing review agency to review the construction drawing design documents of pipeline gas engineering, it should solicit and adopt the reasonable opinions of the corresponding pipeline gas business enterprises. The pipeline gas business enterprise shall put forward written opinions within ten days from the date of receiving the construction drawing design documents.

If the design document of the construction drawing of the pipeline gas project fails to solicit the opinions of the pipeline gas business enterprise, the construction drawing review institution shall not issue qualified opinions on the construction drawing review.

The construction unit shall submit the construction drawing design documents of the pipeline gas project that have passed the examination to the corresponding pipeline gas business enterprise for confirmation. The pipeline gas business enterprise shall confirm it within three days from the date of receiving the construction drawing design documents that have passed the examination. The construction drawing design documents of pipeline gas engineering shall not be implemented without the confirmation of pipeline gas business enterprises. Fourteenth construction units shall, in accordance with the provisions, report the fire protection design documents of gas projects to the public security fire control institutions for examination and approval, and apply to the public security fire control institutions for fire control acceptance after the completion of the construction project. Unaudited or unqualified, the construction unit, the construction unit shall not be construction; It is prohibited to put into use without fire acceptance or unqualified fire acceptance. Fifteenth construction engineering quality supervision institutions and construction engineering safety production supervision institutions shall supervise the engineering quality and construction safety of gas projects according to law.

Pipeline gas enterprises shall cooperate with the construction engineering quality supervision institutions to supervise the construction quality of pipeline gas projects.