Job Recruitment Website - Property management - Shenyang Metro 10 Line Station

Shenyang Metro 10 Line Station

The starting point of Shenyang Metro 10 line is located at the big turn bridge on the north side of Lilac Lake Park. After passing Shenma Highway, Xianggong Street and Kunshan West Road, it enters the First Ring Road and is laid along Chongshan Road, Beihai Street and Pangjiang Street. When you arrive at Changqing Street, turn left and go south along Changqing Street and Changqing South Street. After crossing the Southeast Third Ring Road, take the Gu Ying Line to Zhangshabu Station.

Shenyang Metro 10 Line is the fourth subway line in Shenyang, Liaoning Province, China. Construction of Shenyang Metro 10 Line started on March 22nd, 20th13. It was officially opened on April 29th, 2020, and the logo color was apple green.

As of June 5438+ 10, 2020, the total length of Shenyang Metro 10 line is 27.2 1 km, and there are 2/kloc-0 stations in * *, all of which are underground stations, and the trains consist of 6 B-type trains. There are 1 depot, 1 parking lot, 1 control center.

Extended data

Station culture-

In the aspect of station decoration, Shenyang Metro 10 line adopts asymmetric design method, which makes the station space more flexible, and at the same time, it designs the cultural elements of "sunset at Tawan" along the line, making the subway a flowing urban cultural memory. The tail space design of the wavy entrance and exit provides convenient development space, which belongs to the form of "subway+property" in Shenyang.

Baidu encyclopedia-Shenyang subway