Job Recruitment Website - Property management - What are the procedures for building a new charging pile station?

What are the procedures for building a new charging pile station?

Procedures: copy of ID card, proof of parking space ownership (which can be issued by the property), and instructions that the property agrees to install to the staff. In addition, we should pay attention to the following aspects:

About the property: contact the property company to determine the charging pile installation policy in the community. At present, for the installation of charging piles, the general rule is to require parking spaces with their own property rights. In addition, some properties are not suitable for installing charging piles because they were built earlier. If the installation of charging piles requires additional technical equipment investment, it is necessary to communicate with the property in advance.

About parking spaces: Check your parking spaces. There will be many power distribution rooms in the community, so the owner should choose the one closest to the parking space, which can save a lot of money when installing. In addition, some communities have installed charging piles and can learn from their neighbors. There are some precautions that you won't understand unless you are "experienced". In short, it is necessary to determine the shortest route for the installation of charging piles.

On-the-spot investigation: On-the-spot investigation, the engineers of the power company will inform the charging pile company of a time, when the property electrician, the charging pile company, the power company and the owner will all go to the site to determine the final construction plan.

About installation: after the construction scheme is determined, it is time for installation and construction. According to the situation of each community, the location of the garage is different and the construction time is different. Some will only take 2 hours to complete, while others may take a whole day to complete the construction. 、

About acceptance: after the construction is completed, the charging pile company will go to the power company for filing, and the power company will go to the site for acceptance. If it is qualified, it will stamp the meter, and then the power company will make the corresponding electric card, which will be collected by the charging pile company and handed over to the owner, or the owner will go to the power supply equipment to collect it himself.

Extended data:

As the electric vehicle charging pile (plug) on the distribution side of the power grid, the particularity of its structure determines that the automatic communication system has the characteristics of many and scattered measuring points, wide coverage and short communication distance. And with the development of the city, the network topology needs flexible and extensible structure. Therefore, the following issues should be considered in the selection of the communication mode of electric vehicle charging piles (plugs):

(1) Reliability of communication-The communication system should stand the test of long-term harsh environment and strong electromagnetic interference or noise interference, and keep the communication smooth.

(2) Construction cost-On the premise of satisfying reliability, the construction cost and long-term use and maintenance cost are comprehensively considered.

(3) Two-way communication-not only can upload information, but also can release control quantity.

(4) Multi-service data transmission rate-With the continuous growth of terminal traffic in the future, the communication between the main station and the sub-station and the terminal requires higher and higher data transmission rate of multi-service.

(5) Flexibility and expansibility of communication-Because charging piles (plugs) have the characteristics of many control points, wide area and dispersion, standard communication protocols are needed. With the development of "all-IP" network technology trend and the continuous growth of power operation business, it is necessary to consider IP-based service bearer, and at the same time, it is required to be convenient for installation, debugging, operation and maintenance.

References:

Baidu Encyclopedia: Charging Pile