How to write IC engineer's year-end summary report
Engineering Management
Project management is the core and focus of our work. After 1 1 year of project management, the engineering department has invested more energy in project construction management. With the joint efforts of our colleague Qi Xin, our department has overcome various difficulties. After one year's efforts, we have successively completed the fire control acceptance and completion acceptance of Yulong Bay, the acceptance of new world civil air defense, the completion filing of Gui Huayuan, the preliminary procedures of the first phase of Yujingcheng project, and the quality and technical management. At present, Yujingcheng 1# building, 6# building, 13# building, 15# building and 16# building are progressing steadily beyond the requirements of the owner, among which 13# building. Our department strictly abides by the "three controls" management method of the project. Starting with the control of three important factors: time limit for a project, quality and cost, strengthen contract management and information management, coordinate the relationship with design, supervision, general contracting and subcontracting, and strengthen management measures.
1. Set targets, establish rules and regulations, and do a good job in the construction management of the construction unit.
In 20XX, our staff will go all out to achieve the safety, quality and progress goals of the first phase of Yujingcheng Project. At the same time, popularize 5 1# plot.
At present, on the whole, the progress and quality of the eleventh construction project of Yujingcheng in Shaanxi are satisfactory, but there are also some problems. We deeply reflect and sum up the following reasons: (1) The construction period planning or adjustment of individual control nodes are not well considered, and they are not sensitive and forward-looking enough for possible problems in the planned operation. (2) The influence of objective factors such as bad weather environment. (3) The design becomes more and more, and the designer can't reply in time. (4) Some construction units are lax in discipline, site management is not in place, and plans are not implemented.
2. Attach importance to the role of contract in project management, classify and file all kinds of engineering technical data, actively coordinate the working relationship between all parties and deal with on-site problems.
The construction project contract plays a very important role in the concrete implementation of the project, which comprehensively stipulates the rights, obligations and responsibilities of all parties involved in the survey, design, construction and supervision of the project. In the concrete implementation process of engineering construction, our department strictly abides by the contract, and implements the quality responsibility, demarcation, drawing design, process use approval and approval system stipulated in the contract well. By studying the problems related to the contract execution raised by all parties, the solutions to the problems related to the project progress are put forward in time and implemented by the supervision engineer. When necessary, adjust the construction means, construction resources, construction organization and contract period.
3. Pay special attention to the site safety and civilized management.
Safety and civilization is a work that can't be ignored in construction projects. According to the safety and civilized project management objectives of this project, our department urges the construction unit to implement the safety regulations and production rules and regulations promulgated by the State Council and various departments during the construction process. In the process of implementation, we have mainly done the following work:
(1) In order to enhance the image of the construction site and ensure safe and civilized construction, the construction site, construction management area and living management area are scientifically arranged and rationally configured, and kept in harmony with various environments. The construction unit is required to carry out the construction according to the safety and civilized standard of chemical industry.
(2) Supervise the supervision engineer to do a good job in safety control to ensure that there is no danger, no accident, no personal injury and no property loss during the construction.
(3) Supervise the supervision engineer and the construction unit to ensure that the construction site and temporary land are orderly, civilized and safe, the environment is protected, the traffic is smooth, the fire control facilities are complete, and the site capacity and environmental sanitation meet the requirements.
(4) Coordinate the relationship among contractors, supervisors, relevant departments in the design department, surrounding projects and communities, and create a good internal and external environment for the project construction.
Follow up the design in time and make good preparations for the project.
According to the living habits of Fuyang residents, communicate with the designer in time to discuss and improve the room type, which involves the living habits of residents.
Promptly urge the reply of the contact list for the questions and some unknown drawings in the construction, and try to avoid the delay of the construction period.
Do a good job in engineering quality and technical management
Carry out process acceptance in strict accordance with drawings, contracts and specifications, make long-term plans and put quality first. We realize that engineering quality monitoring is the life of our work. In order to achieve the expected goal of project quality, it is necessary to control the project quality in advance, monitor it in the process and control it afterwards. The specific method is: strictly control the entry of raw materials, components and equipment, and our personnel should participate in every inspection and send them for inspection throughout the process. All materials used in the main structure and decoration materials must go through inspection procedures, and must issue factory certificates, product certificates and retest reports. Only qualified products and materials can enter the site for use. In order to make the distribution room in Gui Huayuan residential area not occupy the planned position and minimize the impact on customers, the distribution room was set in the basement of civil air defense to solve the problem of storey height. The leaders of the engineering department communicated and coordinated with relevant departments and personnel for many times, which was finally properly solved.
Strengthen process quality control to ensure the excellent structure of the main project. For the construction of important parts and key nodes, supervisors are required to stand by and watch the whole process. For beam-column steel binding, concrete pouring, manual digging pile construction and waterproof layer detail construction, the supervision engineer should insist on strict on-site supervision according to the regulations, find and correct the quality problems existing in the construction in time, urge the construction party to rectify the existing problems, so as to nip the quality problems in the bud during the construction process, and actively carry out normal supervision and inspection. Site representatives must go deep into the site to understand the site situation, coordinate and solve the existing problems, correct the unqualified ones in time, and persist in rectification. If unqualified or inferior materials are found, insist that the construction unit repel and enter the site to ensure the engineering quality. Pay attention to the quality of work, front-line employees must be upright, honest and upright, convince people by reasoning, treat people equally and be polite, create a good cooperative atmosphere for enterprises, ensure high-quality and fast work, and be promoters rather than tractors. The staff of the whole department should be diligent in their legs, hands, mouths and brains. Through hard work, together with the supervision and relevant parties of the construction project department, we will jointly create a good situation of win-win for all parties.
Strict project acceptance, to ensure the timely realization of the project quality objectives. Take cover engineering, process handover acceptance must be signed by representatives of all parties before the next working procedure can be constructed, so as to prevent the occurrence of rework events caused by the acceptance of missing items and ensure the orderly construction of the project.
Shortcomings in work and areas needing improvement.
In the process of summing up experience and meeting challenges, we found several problems worthy of our improvement and face up to, which still need to be overcome and corrected seriously in order to improve and make the management level to a new level, mainly in the following aspects:
1, further improve and refine the project management system, clarify the management procedures, and make the project management more smooth and efficient. The internal division of labor and responsibilities have been clarified, and the work order of uploading and releasing, unity and cooperation, standardization and order has been established, which has effectively promoted the smooth development of all work.
2. With the rapid development of building technology and the frequent updating of specifications and procedures, it is necessary to strengthen the professional quality training of engineers, study in their spare time, and strengthen the study of drawings, industry regulations, commonly used specifications, procedures and atlas.
3, also need to strengthen the coordination and communication between departments, early planning, early arrangement, do a good job in all the preparations before and after the construction.
4. The professional quality of management and technical personnel of some construction units is poor, which can not meet the actual needs of construction management, such as unfamiliarity with construction drawings, poor safety awareness and imperfect self-inspection system; Management input is not in place.
Summary is a mirror. By summing up, we can objectively judge the achievements and lessons, advantages and disadvantages, difficulties and opportunities of the past year, clarify our thinking, make clear our goals, and formulate measures to provide reference and guarantee for the next work. So as to have a clear understanding and profound analysis of difficulties, find solutions to difficulties, have a strong insight into opportunities, and make preparations for seizing opportunities as soon as possible.
- Previous article:Is Changsha recruitment service network formal?
- Next article:How much is the price of Anliang Yujingwan in Lu 'an?
- Related articles
- What is the telephone number of the sales department of Harbin Aida Zundi?
- Measures of Dali Municipality on the Administration of Rural Homestead
- What's the telephone number of Tianshui Chen Long Xin Yue Hua Ting Sales Office?
- Is Fuji Jun 'an Garden Store convenient for transportation? How should I get there?
- How much is the price of Nanjing Longhu Crystal Licheng?
- Who can come with me to save this cat (Shuangyu West District, Houshayu, Shunyi)
- How many years is the property right of Qixing Garden in Qiandao Lake, Hangzhou?
- Should the property be compensated as long as it falls in the community?
- How about Mao Yi Property Management Co., Ltd. Shaoxing Branch?
- What is the telephone number of Xiangxi Langqiao Tianjie Marketing Center?