Steps and procedures of house decoration

I believe that it is very troublesome for the owners who buy a house for the first time, because looking at this bare blank house, I really don't know where to start. Although the owner does not need to decorate himself, the steps and processes of decorating the house should be clear, otherwise the decoration company will cut corners and we will always shout "Come on!" Don't you think this is a joke?

In order to ensure that the house you bought can be decorated with satisfaction, I will tell you in detail the steps and processes of decorating the house, copy and paste it and save it quickly.

First of all, I will give you an overview of the steps and processes of decorating the house, one step ***2 1 _

Preliminary design

Demolition and transformation of main body

Hydropower transformation

Woodworking craft

tiling

whitewash a wall

Install water heater

Install kitchen and bathroom ceilings

Installation cabinet

Install range hood

Install wooden door

Install the floor

wallpaper

Install switch socket

Install lamps and lanterns

Install hardware sanitary ware

Installing curtain rod

keep sth clean

Furniture method

Install household appliances

Make good accessories

Let's talk about the steps of decorating the house in detail and how to do each step _

I. Preliminary Design

We must first understand the principle of design. A good design scheme can be said to be the basis of decoration, because if the design scheme is not good, the decoration is only superficial, and only the internal design concept is the soul of home decoration, so it is very important to find a good designer!

In the preliminary design, in addition to the design of the scheme, the measurement of size is also very important, and the measurement content mainly includes two points:

Area measurement

Mainly ceramic tile area, wall paint area, floor area and wallpaper area.

Wall size measurement

Especially custom-made furniture, such as custom cabinets, needs to measure the wall size very carefully. If the size is wrong, the furniture will not be aligned, which will be very troublesome.

Second, the main body of demolition and transformation

This is the first step to start construction. I want to remind everyone that before starting work, you must remember to go through the relevant construction procedures with the property and pay the decoration deposit, otherwise it will be illegal.

The main demolition is mainly based on the following design scheme:

Demolition of partition wall of non-bearing wall

Masonry wall

Shovel wall skin

Installation and replacement of plastic steel window

So the main demolition is to put up the main frame of the apartment first.

Third, hydropower transformation.

It should be noted here that the cabinet details should be measured for the first time before the hydropower transformation. This measurement mainly depends on whether there is any problem with the position of the lampblack machine socket and the water inlet reserved by the real estate developer, mainly including the following three points:

Does the position of lampblack machine socket affect the installation of lampblack machine?

Is the location of the water inlet convenient for installing the sink?

Is the location of the water meter appropriate?

When the waterway is rebuilt, the bathroom will be waterproof together. If you are in the kitchen, you don't need to be waterproof. You must remember to do the closed water test.

Fourth, carpentry

Carpenters' work mainly includes erecting pipes, decorating ceilings and sticking plaster lines. But in fact, these works can sometimes be carried out together as the main body. For example, when making a fake wall, if there are water and electricity lines on the fake wall, workers who transform water and electricity should be allowed to embed the pipes.

Verb (short for verb) Gaiwa

The bricklayer's work mainly has the following two points:

Laying of marble windowsill and lintel. The lintel can be carried out together with the floor tile, and the marble windowsill should be carried out after the window cover is installed.

Install the floor drain. Because the floor drain should be installed in combination with the floor tile, it should be bought as soon as possible.

Six, brush the wall paint

The work of oil workers mainly includes the following two points:

Treat the wall foundation, paint the top coat and paint the furniture.

If you want to paste wallpaper, just let the oiler do the basic work of the wall. Personally, I don't think it is necessary to keep a coat.

Seven, install the water heater

Generally, the water heater is installed in front of the ceiling. Please pay attention to the installation position of the water heater. The gas water heater is installed in the kitchen, which is too small to install. It can also be installed on a closed balcony, and the electric water heater is installed in the bathroom.

Eight, install the kitchen and bathroom ceiling.

Before the ceiling is installed, things like ceiling lamps, exhaust fans and yuba must be bought in advance, and the ceiling lamps must be moisture-proof.

Nine, install cabinets

After the ceiling is installed, you can let the cabinet dealer install it at home. At this time, the sink and the cooker are also installed together.

Also, communicate with the property before installing the cabinet, because the gas should be detected after the cooker is installed.

X. installing a range hood

It is best to install the range hood on the same day as the cabinet, which can facilitate the communication between the installers, because the range hood is installed with the cabinet.

XI。 Install wooden door

When installing wooden doors, hinges, door locks and ground suction should be installed.

It takes about a month to make wooden doors here, so in order to install them in time, let wooden door merchants come to measure the size of the door opening when the main body is dismantled and modified.

In addition, the height of each doorway is not necessarily the same, and workers can treat it as the same height, which will look better.

Twelve, install the floor

Pay attention to two points before installing the floor:

Let the floor vendor see if the ground needs leveling, and some need local leveling.

The floor to be installed must be clean and dry, so it should be "clean" in the cleaning process.

XIII. Wallpaper

Remember to clean the floor before pasting the wallpaper. There should be nothing on the floor before pasting wallpaper, otherwise the wallpaper will be dirty. It is suggested to protect the floor, because the wallpaper needs to be cut, which may accidentally damage the floor.

Fourteen, install the switch socket

The requirements of switch sockets in different positions are different. In the bathroom, the switch socket must be waterproof, and the socket must have a waterproof cover; The switch at the entrance should be tactile or responsive to avoid turning on the light in the dark.

In addition, there should be more switch sockets, not less.

Fifteen, install lamps and lanterns

It is suggested to choose different lamps according to the lighting needs, such as chandeliers, spotlights, downlights and table lamps. The chandelier should also be based on the floor height. It is suggested that small apartments on high and low floors should not choose too high chandeliers, and it is best to choose ceiling lamps.

Sixteen, the installation of hardware sanitary ware

When installing, put bathroom fittings, pipe fittings, toilets, etc. Together.

Seventeen, install the curtain rod

When the curtain rod is installed, it means that the decoration is basically completed.

Eighteen. clean

Install curtains after cleaning, and don't have furniture at home when cleaning, which is convenient for cleaning.

Nineteen, furniture comes into play

Pay attention to the purchase time of furniture here. It is suggested that the size range of furniture will be more correct after hydropower transformation.

Twenty, home appliances come into play

At this time, things like air conditioners and refrigerators can be installed or brought into the site.

Twenty-one, making accessories

A good choice of accessories will greatly add points to soft clothes.