Job Recruitment Website - Property management - Simple contract for the sale of doors and windows
Simple contract for the sale of doors and windows
With the enhancement of people's legal awareness, contracts are indispensable in many occasions, and signing contracts is also one of the best ways to avoid disputes. Do you know what the main contents of the contract are? The following is a simple sample contract for the sale of doors and windows that I collected for you (5 copies in total). I hope it will help you.
Simple contract for the sale of doors and windows 1 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, in order to clarify the interests and obligations of both parties, the Contract for Party B to Provide and Install Doors and Windows to Party A was signed by both parties through consultation. The contract is as follows:
1. Product name, main materials, specifications, models, units of measurement and quantity:
(1) Product brand:
(2) Product name: doors and windows
(3) Main materials:
(3) Product unit price:
(3) Total product price:
Door and window material: door and window paint:
Color of doors and windows: subject to the materials provided by Party A to Party B;
Window hardware:
Sealant: sealing strip:
Glass: tax:
(3) Specifications and models of doors and windows:
For the specifications and models of doors and windows, see the attachment "Door and Window Type Diagram". Party A explained the design intention to Party B in detail, and Party B approved the partition and area of doors and windows. The style of doors and windows shall be subject to the drawings signed and confirmed by Party A. ..
Note: If there is any change in the number and area of doors and windows during the execution of the contract, the final accounting shall be based on the opening area and quantity (subject to the attached design drawings).
Second, the place of delivery, transportation and installation methods
1. Place of delivery and acceptance:
2. Transportation:
3. Installation: Party B is responsible for installation.
Three. Payment terms:
1. After the contract is formally signed, Party A shall pay Party B 30% of the total contract price in RMB as the down payment (in words); When the doors and windows arrive, Party A shall pay 30% of the total price, namely RMB (in words); Party A shall pay 35% of the total price (in words) after passing the acceptance; Warranty for one year, pay 5%.
Others:
1. Party B shall complete the goods according to the specified date.
2. Any commitment or agreement needs clear written confirmation from both parties, otherwise it will be deemed invalid.
Four, maintenance services:
From the date of installation acceptance, the whole window is guaranteed for one year. Damage that does not belong to the product itself shall be compensated by the user. After one year, Party B has the obligation to carry out lifelong maintenance for the quality problems in the use process, and the material expenses shall be borne by the user.
Verb (abbreviation for verb) force majeure:
When the execution of this contract is affected by force majeure factors recognized by both parties, such as earthquake, flood, fire, war, etc. , shall promptly inform the other party of the reasons why it can't perform or can't fully perform, and after obtaining the certificate from the relevant authorities, it is allowed to postpone, partially perform or not perform the contract, and may be exempted from the liability for breach of contract in part or in whole according to the circumstances.
Liability for breach of contract of intransitive verbs:
(1) Party A:
1. If Party A has no reason to return the goods midway (Party B guarantees to produce according to the standard of sample window confirmed by both parties), it shall pay Party B a penalty of 50% of the returned part and the payment.
(2) Party B:
2. Party B shall ensure that the product quality meets the requirements of the contract, and the product shall be regarded as qualified from the date when Party A agrees to install Party B's product.
3. If the goods provided by Party B do not meet the origin and quality requirements stipulated in the contract, Party B shall be responsible for replacing them immediately, and all expenses arising therefrom shall be borne by Party B. ..
Seven. Dispute resolution:
Any dispute arising from the execution of this contract shall be settled by both parties through consultation. If negotiation fails, either party may bring a lawsuit to the people's court where the contract is signed.
Eight. Entry into force of the contract:
1. It will take effect as of the date of signature and seal by both parties.
2. During the execution of the contract, any change or supplement to the contract conditions by both parties must be confirmed by both parties in writing, and as a supplement to the contract, it has the same legal effect as this contract.
3. This contract is made in duplicate. After being signed and sealed by both parties, Party A and Party B each hold one copy, and the annex to this contract has the same legal effect as this contract.
Party A: (signature and seal)
Party B: (signature and seal)
Date:
Simple contract for the sale of doors and windows 2 Party A:
Party B:
After the signing of this contract, if Party A loses or increases expenses due to Party A's reasons or Party A's requirements for modification, both parties shall sign a supplementary contract after consultation.
In case of delay due to Party A's reasons, the construction period shall be postponed accordingly. The glass shall be installed after communication and consultation according to the actual decoration situation of customers (as the glass is fragile, if it is damaged, it shall be negotiated with Party A in a friendly way, and the broken glass shall not be included in the normal construction period).
Seven. Transportation and installation: Party B is responsible for transportation and installation, handling and safety protection of high-rise area installation, etc.
If the installation conditions are not met, the expenses arising therefrom shall be borne by Party A. ..
Eight. Quality standard: The door and window products and installation works provided by Party B shall meet the relevant national quality standards.
Nine. Party A shall provide Party B with construction conditions: power supply for installation, sideline of door and window openings, semi-finished product stacking area, scaffold installation and irregular modification of door and window openings. Party A is responsible for the storage of semi-finished products shipped to the site and the repair of holes after the installation of doors and windows.
X within 48 hours after the signing of this contract, the drawing size determined by party a may be partially modified, and the price shall be settled according to the facts. After more than 48 hours, the factory has officially placed an order, and the losses caused thereby shall be borne by Party A. (In the case of the same window type, the small window is enlarged.
The window is charged at 80% of the original amount, and the delivery date depends on the factory material inventory; 50% of the original amount will be charged for replacing the small window with the large window. As the glass needs to be set separately, the arrival date will be extended by 15 days. )
XI。 Warranty clause: After the doors and windows are installed, it will be transferred to the warranty period. Doors and windows are guaranteed for two years from the date of installation and acceptance. See the warranty card for the specific warranty scope.
12. When the contractual obligations are terminated due to force majeure, both parties shall handle the other party's liabilities for breach of contract fairly and reasonably. However, the party affected by the force majeure shall promptly notify the other party in writing and issue written evidence of the force majeure.
14. This contract shall come into effect after being signed and sealed by both parties and the deposit is paid. This contract is made in triplicate, one for Party A and two for Party B. ..
Note: the lower frame of 143 series mosquito-proof sliding door needs to be filled with cement slurry, and foam glue is not allowed. (If the foam rubber does not meet the waterproof standard).
Signature of Party A:
Signature of Party B:
Date of signing:
Simple contract for the sale of doors and windows 3 Buyer:
Supplier:
I. Contents of the contract:
1, project name:
3. Project content: The buyer entrusts the supplier to process and install aluminum alloy bullet doors and all plastic steel doors and windows.
4. Plan of the Contract Area.
5. Sample drawing of aluminum alloy spring door area in the contract.
Second, the engineering technical quality requirements
1, the structural form and specifications of plastic steel doors and windows meet the requirements of drawings signed by both parties:
2. The profiles used for plastic steel doors and windows are as follows
3. The profile of the spring door for the ground is.
4. Suppliers should strictly follow GBl2003-98 standard;
5. The buyer shall provide holes according to GB5824-98.
Third, the responsibilities and rights of the supply and demand sides.
Demand side:
1. The buyer shall provide the engineering blueprint in time. If there is any change in the hole size, the buyer shall notify the supplier in time before the supplier makes it, and issue a formal change order.
2. The buyer shall supervise the construction of the civil contractor to ensure that the hole size meets the requirements of the national standard GB5824-98.
3. Both the demander and the supplier have the responsibility to protect the integrity of the plastic steel window that has been put on the wall;
4. Provide suppliers with safe and reliable product storage warehouses and workplaces, as well as water, electricity, scaffolding and other conditions and facilities required for safe construction free of charge, so as to facilitate suppliers' construction;
5. According to the requirements of GB5824~86, provide coarse powder for holes and reference lines (midline, line 50, etc.) required for installation. );
Supplier:
1. The supplier shall design all plastic-steel doors and windows used in this project according to the engineering drawings, the requirements of the buyer and the atlas of Shaanxi 98J08. After signing by both parties, the supplier shall process and manufacture according to the signed drawings. Square meters, please refer to square meters for the style and quantity of bullet doors required for the project. See the design sample for the style and quantity of plastic steel doors and windows required for this project.
2. The supplier shall manufacture the plastic steel doors and windows of this project according to the requirements of GBL 2003-98 standard.
3. The supplier shall install the plastic-steel doors and windows of this project according to the requirements of national JGJL03-96 standard.
4. The supplier shall adhere to safety first and civilized construction, and abide by the discipline of the buyer's construction site.
Four. Total contract price and payment method
1. The effective date of this contract shall be the date of signature and seal by both parties.
The unit price of 2.88 series sliding windows is RMB/m2, the area is RMB/m2, and the area is m2. M2 .3. 100 series bullet door unit price is
4. Total contract price = ∑ Contract unit price × area of model steel window and bullet door opening =
Capitalized:
The total contract amount of plastic steel doors and windows shall be subject to the drawings approved by both parties and settled in size of the hole.
5. Settlement by telegraphic transfer or bank draft;
6. After the contract comes into effect, the buyer shall pay% of the total contract amount to the seller as the advance payment for the project; After the funds are in place, the supplier will arrange production and organize installation according to the supply plan provided by the buyer. After the window frame enters the site, the buyer shall pay% of the total contract amount to the supplier; After the window sash enters the site, the buyer shall pay% of the total contract price of the supplier; After the installation of doors and windows is completed, the buyer shall pay% of the total contract price to the supplier within 15 days, and reserve% as the project quality deposit, which will be settled one year later.
Verb (abbreviation for verb) warranty and maintenance
The warranty period of this door and window project is one year. During the warranty period, the supplier shall send someone to repair it free of charge within two working days after receiving the repair notice.
Dispute resolution method of intransitive verbs
Both parties shall settle disputes arising from this contract through negotiation, and if necessary, through legal procedures.
Buyer (seal):
Representative (signature):
date month year
Simple contract for the sale of doors and windows 4 Demander: (hereinafter referred to as Party A)
Supplier: (hereinafter referred to as Party B)
Party A and Party B have reached the following terms in a friendly and cooperative manner and on the principle of equality, mutual benefit and voluntary consultation.
I. Brand, quantity, unit of measurement, unit price and amount
Second, the quality standard
1, implement the standards specified in 08J/T7 14, and meet the requirements of project completion acceptance.
2. Party B shall deliver the supply list, experimental report and certificate to Party A on time, and Party A shall check the quality with this certificate.
3. The product requires complete accessories, smoothness, portability and no noise.
4. The products provided by Party B shall meet the design requirements and national standards (strength, air tightness, heat preservation, etc.). ).
Third, the material requirements
1, aluminum alloy door profile is 3.0mm thick, equipped with 6mm tempered glass LOWE+9A+6mm tempered glass, hardware fittings imported from Germany, German heavy-duty double-shaft wheel hub, and EPDM rubber strip is used in the cavity.
2. The aluminum alloy window profile is 2.0mm thick, equipped with 6mm tempered glass LOWE+9A+6mm tempered glass, imported hardware fittings from Germany, and the cavity is made of EPDM rubber strip.
Iv. Mode of delivery, place and freight burden
1. Party B shall organize means of transport to transport the goods to the location in XXX City, Guangdong Province designated by Party A..
2. Party B shall be responsible for the freight, embarkation and disembarkation fees, etc.
3. The products shall be protected by packaging during transportation, and the packaging expenses shall be borne by Party B;
4. The product loss has been included in the total contract price.
Verb (abbreviation of verb) delivery date: from YY to YY, Party B shall supply the goods in batches according to Party A's requirements.
Payment method and time limit of intransitive verbs: Party A shall pay 65,438+00% of the payment to Party B as the down payment within three days from the date of signing the contract, and settle the payment in installments within the remaining two years.
Seven. Liability for breach of contract: either party shall not breach the contract, otherwise, the breaching party shall compensate the other party for economic losses and bear economic responsibilities.
Eight. Solution to contract disputes: apply to XX Arbitration Commission for arbitration.
Nine. Other agreed matters: Matters not covered shall be settled by both parties through consultation.
X this contract is made in duplicate. Party A and Party B each hold one copy.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple contract for the sale of doors and windows 5 Buyer: (hereinafter referred to as Party A)
Supplier: (hereinafter referred to as Party B)
Party A hereby entrusts Party B to process, manufacture and install the engineering security door and fire-proof security door, and Party B will undertake the construction. In order to clarify the responsibilities and obligations of both parties, this agreement is hereby concluded for * * * to abide by.
I. Project name:
Second, the scope of contracting:
Responsible for the manufacture and installation of security doors.
Three, security doors and fire doors engineering costs
Fourth, the product and installation quality
1. The product acceptance is subject to the quality acceptance of the samples provided by the supplier and the installation samples. The warranty period of product quality is one year, counting from the date of completion and acceptance of this project (except for human factors).
2. Party B's product quality commitments are as follows:
① The materials used for the quality of Party B's products must meet the agreed conditions, and the configuration of locks and spare parts should meet the requirements of the buyer. Before installation, the qualification certificates of relevant departments should be issued to Party A for the record.
(2) The installation quality must meet the requirements of the current national quality acceptance standards.
(3) If the project quality and products are unqualified, Party B must unconditionally rework or return them, and Party B shall be responsible for the materials and other losses arising therefrom.
Verb (abbreviation for verb) delivery time and requirements
1. Party B's installation time shall conform to Party A's construction plan and deliver the door to the construction site. 2. Party B shall recycle the product packaging materials by itself. The responsibilities of intransitive verbs Party A and Party B:
1. Provide Party B with the construction site and water and electricity needed for construction. 2. Party A is responsible for painting and grouting. Party B's responsibilities:
1. Accept the management of Party A and clean up the site according to Party A's requirements for safe, civilized and standardized construction. 2. Install tools, measuring tools, materials and workers' daily necessities at their own expense. 3. Be responsible for the finished product protection in the construction process before the installation of this project is completed. 4. Party B shall be responsible for the safe construction of construction personnel, and Party B shall be responsible for any safety accidents. Seven, acceptance criteria, methods and time limit for raising objections.
The quality acceptance of the model door and the items approved by both parties shall prevail. After Party B completes the installation, Party A will organize the acceptance. No quality objection is raised within 15 days after the completion acceptance, and the product quality is considered as qualified. (Remarks: This product is not responsible for packaging acceptance, but is responsible for providing valid certificates and qualified products. )
Eight. terms of payment
1. The down payment shall be paid on the effective date of signing the contract, after the products arrive at the construction site, after the internal acceptance of installation is completed, and the balance shall be paid in one lump sum within three months.
2. The project payment shall be paid by Party A to Party B by remittance according to the official invoice amount of Party B for settlement.
Nine. responsibility for breach of contract
1. If Party B fails to fulfill the obligation of supply or installation as required by Party A, Party A has the right to refuse to pay the payment for goods to Party B, and require Party B to pay liquidated damages 500 yuan for each breach.
2. If Party A fails to pay on time, Party B has the right to require Party A to pay 0.2% of the payable amount as liquidated damages.
3. Any dispute between Party A and Party B during the execution of the contract shall be settled through friendly negotiation. If negotiation fails, both parties may apply to the local people's court for a ruling.
X. Other agreed matters
After Party B completes the contract delivery and passes the buyer's acceptance, but before receiving all the money agreed in the contract, Party B continues to own the delivered products. During this period, the supplier does not promise after-sales service.
XI。 This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.
After the contract project payment is paid in full, it will automatically become invalid.
Party A (signature): Party B (signature):
Signature address:
Signature time:
;
- Previous article:Zip code of Shenzhen Renxin Property Management Co., Ltd.
- Next article:How is the progress of Nantong Jinsha Sub-industrial Park?
- Related articles
- Basic information of Kerry, the city that never sleeps.
- What about the surrounding facilities of Suzhou Country Garden Times City Community?
- What city is the University Town?
- Which community does Hechuan Jinke Teana City belong to?
- Industry Introduction of Ordos Group
- Which city is Evergrande Group in?
- Where is the address of Zibo Jincheng Rongji Liu Quan Academy?
- Hotel takeaway salary
- What is the telephone number of the sales office of Wuyue Plaza Apartment in Xiangyang New Town?
- How many years is the property right of Hanjing Famous Building in Zaozhuang?