202 1 year warranty service contract mode

1.202 1 year warranty service contract mode

Party A: the construction unit; Party B: Property service enterprise.

In order to ensure the integrity and normal use of the property, the property in _ _ _ _ _ _ _ _ _

I. Warranty Items and Duration:

According to the National, Provincial and Dongguan Commodity House Instruction Manual and Commodity House Quality Guarantee, the warranty items and duration are as follows:

1. The foundation and main structure shall be guaranteed within a reasonable service life;

2. Warranty content and warranty period of all parts under normal use: the roof is waterproof for 5 years;

3, metope, kitchen and bathroom floor, basement, pipeline leakage for 5 years;

4, metope, ceiling plaster layer falls off 1 year;

5. The ground sags and cracks, and a large area of sand blows 1 year;

6. Cracking of doors and windows and hardware damage 1 year;

7. The pipeline is blocked for 2 months;

8. Heating and cooling systems and equipment 1 heating period or cooling period;

9, sanitary ware 1 year;

10, switch lamps and appliances for 6 months;

Description:

1 The warranty period of other projects shall be agreed by the employer and the contractor. The warranty period of the construction project shall be calculated from the date when the project is completed and accepted.

2. The repair time is within the warranty period stipulated by the state, but it has not been completely repaired after the expiration of the warranty period. The construction unit shall not refuse to continue the maintenance on the grounds that the warranty period has expired, and it must be thoroughly repaired.

Two. Party A's responsibilities:

1. According to relevant documents, Party A is responsible for the warranty:

(1) Fire control facilities and equipment shall arrive at the site within _ _ _ _ hours and be repaired within _ _ _ days;

(2) The hydropower system should arrive at the site within _ _ hours and be repaired within _ _ days;

(3) The intelligent system will arrive at the site within _ _ hours and be repaired within _ _ days;

(four) other matters that need to be clarified.

2. Be responsible for handling the complaints within the warranty scope of the house, and shall not transfer the problems within the warranty scope to Party B. ..

3. Pay attention to the warranty quality and avoid repeated maintenance, which will affect the life and work of the owner.

Three. Party B's responsibilities:

1. Provide the warranty items and contents reflected by the owner to Party A for warranty work in time.

2. Urge Party A to do a good job of warranty in time, and assist the owner to do a good job of inspection and acceptance of warranty quality together.

3. If Party A fails to perform the warranty responsibility as agreed, it shall report the maintenance project and the required funds to the owners' committee according to the reflection of the relevant owners, and resolve related matters through consultation.

Four. If Party A fails to perform its responsibilities as agreed for more than _ _ _ _ _ times, or causes collective complaints from the owners, the owners' committee shall assist Party B to solve the problem; If negotiation fails, it shall be reported to Liangping Community or Liaobu Town Housing Management Office or Dongguan Housing Management Bureau for handling.

Verb (abbreviation of verb) For matters not covered in this agreement, both parties may sign a written supplementary agreement separately. In case of conflict between the supplementary agreement and this agreement, this agreement shall prevail.

Intransitive verbs If Party B withdraws from the property service before the expiration of the agreement period, this agreement will naturally be performed by the newly hired property service enterprise until the expiration of the agreement period.

Seven. Any dispute arising from the performance of this agreement shall be settled by both parties through consultation. If negotiation fails, it shall be reported to the competent property management department of the jurisdiction for coordination and settlement.

Eight. This agreement is made in quintuplicate, one for each party, one for the owners' committee, one for the district housing management office and one for the municipal housing management bureau.

Party A: Party B:

Company name: (seal) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Company name: (seal) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2.202 1 year warranty service contract mode

Client (hereinafter referred to as Party A): Contractor (hereinafter referred to as Party B):

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, on the basis of equality, voluntariness and consensus, Party A and Party B have reached the following agreement on matters related to Party B's contracting of Party A's interior decoration project (hereinafter referred to as the project):

Article 1: Project Overview

1, project address:

2. Huxing (see the construction drawing for details).

3. Quantity of construction works: See the budget of decoration works in the annex for details. If there is any change in engineering quantity, the actual engineering quantity shall prevail.

4. Project contracting mode, both parties agree to adopt the following first contracting mode:

(1) Party B undertakes the work and materials;

(2) Party B only works as a contractor (Party A provides all materials);

(3) Part of Party B's materials are contracted and all of them are contracted;

5. The duration of the project is working days (subject to the working days of Party B's employees). Start date:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2: Project Cost

Total project cost: RMB in words only (RMB).

For details, please refer to the decoration project budget in the annex to this contract.

Article 3: Design and Construction Drawings

The construction drawings determined by both parties through consultation shall be executed in the following ways:

(1) Party A entrusts Party B to make design and construction drawings in duplicate, with each party holding one copy;

(2) Party A shall make and provide design and construction drawings in duplicate, with each party holding one copy.

Article 4: Increase, decrease or change of items.

1. If it is necessary to increase, decrease or change the project or construction method, both parties shall reach an agreement through consultation, sign a written list of project increase or decrease, and adjust the related project cost and construction period. The list of increase or decrease of engineering projects during construction is an annex to this contract.

Article 5: Construction Site and Site Handover

1. Party A shall provide Party B with site conditions for normal construction.

(1) Create conditions for Party B to enter the site for construction three days before commencement. Including: demolition of indoor furniture and furnishings, or stacking and covering indoor furniture and furnishings that are not suitable for demolition on the principle of not affecting construction;

(2) Provide water and electricity free of charge during construction;

(3) Responsible for handling relevant formalities with the property management department and the relevant departments of the community and paying various fees. If the relevant departments of the community require Party B to pay unreasonable fees, Party A is responsible for negotiating with the relevant departments of the community to pay;

(4) Party B will not dismantle the indoor load-bearing structure. If it is necessary to dismantle or change the non-load-bearing structure or equipment pipeline of the original building, Party A is responsible for going through the corresponding examination and approval procedures in the relevant departments, and providing the certificate of examination and approval procedures to the person in charge of Party B's construction, and submitting it to the person in charge of Party B's construction site for filing.

2. Party B's construction site responsibilities

(1) During the construction, strictly implement the safety construction operation specifications, fire prevention regulations and quality standards, and complete the project on time with good quality and quantity;

(2) Strictly implement the regulations of relevant departments on construction, and do not disturb the people or pollute the environment;

(3) Protect the gas pipeline in the original room, and ensure that the indoor water supply and drainage pipelines are unblocked;

(4) After the completion of the project, be responsible for the preliminary cleaning of the construction site to achieve civilized construction.

3, the handover of the construction site

(1) Party A has the right to participate in the supervision of project quality and construction progress, and has the obligation to actively cooperate with the signing procedures such as material entry, phased acceptance and completion acceptance; During Party A's absence, entrust Party A to act as an agent to sign off the entry materials, phased acceptance, completion acceptance and engineering changes;

(2) During the construction, Party A has the right to raise objections to one or more projects that do not conform to this agreement. If there is any objection confirmed by both parties through consultation, Party B shall be responsible for repairing it to reach a contract agreement; If one or more projects need to be reworked or repaired due to Party A's reasons, the construction period shall be postponed accordingly, and the corresponding increased expenses shall be borne by Party A..

Article 6: Procurement and Entry of Materials

1. The materials purchased by Party B shall meet the requirements of the decoration project budget, and the transportation expenses of the materials shall be borne by Party A. ..

2. If the materials and equipment purchased by Party B do not meet the quality requirements of national standards or have different specifications, they shall be prohibited from being used. If it has been used, all losses caused to the project shall be borne by Party B. ..

3. The materials and equipment purchased by Party A shall meet the requirements of design and construction drawings and be supplied to the construction site on time. The transportation expenses of materials shall be borne by Party A. The main materials provided by Party A shall be kept by Party B, and the losses caused by Party B's gross negligence shall be compensated by Party B. ..

Article 7: The construction period shall be postponed.

1, the construction period of the project increase or design change will be postponed.

2. The construction period is postponed due to the payment time of Party A or other factors.

3. The construction period of water, electricity and residential areas will be postponed.

4. Due to Party A's failure to complete its responsible work as agreed in the contract, the construction period will be postponed accordingly.

5. The rework period caused by unqualified materials and equipment provided by Party A will be postponed.

6. Due to the time for Party A to provide materials, the construction period is postponed.

7. During the construction, Party A requires Party B's construction personnel to add, subtract or change the project without authorization, and the construction period will be postponed.

8. The construction period is postponed due to force majeure.

9. If rework is caused by Party B, the construction period will remain unchanged.

Article 8: Project Quality

Both parties agree to take the national industry standard "Code for Quality Acceptance of Building Decoration Engineering" GB502 10-20xx as the quality standard. In case of any dispute over the quality of the project during the construction, both parties may apply to the Complaint Mediation Department of Zhuang Jie Center for project quality certification. If the quality of the certified project fails to meet the standards agreed in the contract, Party B shall be responsible for the relevant expenses incurred in the certification process and rectify the unqualified project; After certification, if the quality of the project meets the standards agreed in the contract, Party A shall be responsible for the relevant expenses incurred in the certification process.

Article 9: Project Acceptance

1. After the completion of the project, Party B shall notify Party A for acceptance, and Party A shall organize acceptance within two days after receiving the acceptance notice and fill in the project acceptance form. After the project payment is settled, the handover formalities shall be handled.

2. The warranty period of this project is years from the date of acceptance and signature by both parties.

3. Party A fails to conduct acceptance within the time limit after receiving the acceptance notice from Party B, or has any use behavior without acceptance.

Party A (Owner): (Signature) Party B: (Signature)

Address of domicile: address of enterprise:

Postal code:

Work unit: legal representative

3.202 1 year warranty service contract mode

Customer (Party A): Service Party (Party B):

Party A and Party B have reached the following agreement on equipment warranty through negotiation.

I. List of Warranty Equipment:

password

device name

brand

model

Fuselage number

amount

Contact person:

Telephone:

Fax:

Postal code:

Equipment use address:

Second, the warranty scope and service mode:

1: free operation guidance and technical consultation;

2. Repair the damaged equipment with repair value, or troubleshoot the equipment;

3. Emergency maintenance of machine failure: on-site maintenance within 2 hours in the city and 8 hours in the suburbs, and the time for on-site maintenance is agreed by both parties in different places;

4. Regularly carry out on-site maintenance of the machines within the warranty period, at least _ _ times a year, to ensure the normal operation of the equipment.

Iii. Service period:

From _ _ _ _ _ _ to _ _ _ _ _ _. When the warranty contract expires and Party A needs Party B to continue the warranty, it shall re-sign it one month in advance.

Fourth, quality assurance:

Party B shall guarantee the quality of the accessories and consumables sold. If there is any quality problem, Party B shall replace it free of charge.

Verb (abbreviation of verb) The following situations are not covered by Party B's warranty:

Mechanical damage caused by voltage instability:

Damage to parts caused by not using according to normal rules;

Consumables of the machine, such as toner, ink cartridge, ribbon, photosensitive drum, carrier, paper box, etc.

Party A arbitrarily changes the warranty products or replaces parts and consumables not provided by Party B;

Party A entrusts Party B's unauthorized personnel to guarantee the machine without authorization.

The charging standard of intransitive verbs:

1. Party A shall pay the warranty fee of RMB to Party B when signing this Agreement;

2. If Party A needs Party B to carry out maintenance outside the city, Party A shall pay Party B RMB for working hours and travel expenses.

Seven. Liability for breach of contract:

If there are quality problems with the consumables and accessories provided by Party B to Party A, Party B shall be liable for compensation.

If Party A fails to pay off Party B's money within the time limit, it shall pay Party B a late fee of ten thousandths per day.

Eight. Any dispute arising from the execution of this agreement shall be settled by both parties through consultation. If negotiation fails, Party A and Party B agree to arbitration by the Municipal Arbitration Commission.

Nine. Other matters:

X this contract is made in duplicate, one for each party.

Party A: Party B:

Authorized Agent: Authorized Agent:

Address: Address:

Date of signing:

Signing place: