Job Recruitment Website - Property management - Does the Ministry of Housing and Urban-Rural Development of the People's Republic of China have regulations on household acceptance of residential engineering quality?

Does the Ministry of Housing and Urban-Rural Development of the People's Republic of China have regulations on household acceptance of residential engineering quality?

Household acceptance of residential engineering quality

rules and regulations

first

In order to strengthen the quality management of residential projects,

Ensure the use of completed houses.

Function, according to the "Building Law"

, the State Council's "Regulations on Quality Management of Construction Projects" is

The relevant provisions and national construction acceptance standards are formulated in combination with the actual situation of this province.

second

These Measures shall apply to the administrative area of this province, and the quality of residential projects shall be controlled by households.

Acceptance (hereinafter referred to as acceptance) and its supervision and management.

Household acceptance of residential project quality as mentioned in these Measures,

Refers to the completion and acceptance of residential projects.

Before,

Organized by the construction unit construction unit,

The supervision unit is each household and unit engineering company.

* * * Some special acceptance,

And issued after the household acceptance.

Residential engineering quality

Number of household acceptance records "

essay

Before the residential project is completed and accepted,

The construction unit shall organize the construction and supervision

The relevant personnel of the management unit shall conduct acceptance in accordance with the relevant national and provincial construction quality acceptance specifications.

The content involves the quality of household acceptance.

Where a property management company has been hired,

Property companies should participate in the household inspection of the quality of residential projects.

Collect works.

Article 4

Acceptance should be based on national and provincial engineering quality standards,

Specifications and

Construction drawing design documents that have passed the examination.

The visual quality of the master control items and general items of the inspection lot should be comprehensively inspected.

Take it.

After the inspection lot of each house and designated public parts is qualified,

It should be made up in time

Fill in the acceptance record of family quality inspection lot.

Article 5

Construction units, construction units and supervision units should strengthen the inspection of inspection lots.

For the inspection lot that does not meet the quality requirements, it should be strictly in accordance with the national "construction workers"

Unified standard for engineering quality acceptance "

Deal with relevant regulations,

Repair or reinforce

Division projects and unit (sub-unit) projects that still fail to meet the requirements for safe use after treatment.

Not allowed to accept.

Article 6

The construction unit must be in accordance with the law and in accordance with the relevant provisions of the state and the province,

strict

The project shall be completed and accepted, and it can be delivered only after it is qualified.

Article 7

Ensure the safe and reliable acceptance of engineering foundation and main structure.

On this basis,

Mainly check the visual quality of the project and the quality of using functions.

Mainly includes the following contents

Column content:

( 1)

build

The appearance and size deviation of the building structure;

(2)

door

Window installation quality;

(3)

land

Surface quality of surfaces, walls and ceilings;

(4)

prevent

Quality of water engineering;

(5)

choose

Installation quality of heating system;

(6)

give

Installation quality of water supply and drainage system;

(7)

room

Internal electrical engineering installation quality;

(8)

festival

Can engineering quality.

Article 8

Acceptance shall be carried out in accordance with the following procedures:

( 1)

Determine the inspection location and quantity according to the housing conditions before acceptance.

In practice.

Marked on the construction drawing;

(2)

According to the method required by relevant national codes,

Accept the requirements of this regulation

Check the content;

(3)

Fill in the inspection records,

It is found that the visual quality of the project is inconsistent with the use function.

Requirements of specifications or design documents,

Instruct the construction unit to rectify in writing.

Line review;

(4) After acceptance, it must be signed and issued by the project leader of the construction unit.

The chief supervision engineer and the project manager of the construction unit shall sign and affix the special seal for acceptance respectively.

Record of Household Acceptance of Residential Engineering Quality.

Article 9

If the acceptance is unqualified,

The construction unit shall not organize the completion acceptance of the unit project.

Take it.

Article 10

When the residential project is put into use,

Household acceptance record of residential engineering quality

"Records" shall be submitted to the owner as an attachment to the "Residential Quality Guarantee".

Article 11

The project quality supervision institution shall supervise the project completion acceptance.

Process, review the residential engineering quality household acceptance record.

Article 12

This method has been used since

2007

year

1

moon

1

Implement on the same day.