Job Recruitment Website - Property management - What's the charge for installing a new electricity meter?
What's the charge for installing a new electricity meter?
Reply on relevant expense standards such as installation and renovation of electric energy meter
Jia [2004] No.88
Wuhu Power Supply Company:
Your Bureau's Report on Asking for Adjustment of Electric Energy Meter Installation and Renovation Charges (Wugong Marketing [2004] No.8) and Report on Asking for Reservation of Original Electric Power Management Project Charges and Approval of New Charges (Wugong Marketing [2004] No.23) have been received. In order to continue to accelerate the pace of urban residents' electricity consumption with one household and one meter, effectively improve the residents' electricity consumption conditions, and meet the new capacity needs of some residents and the actual needs of other power supply users, according to the spirit of the provincial price bureau's notice on strengthening the service price management of urban water supply, power supply and gas supply industries [200 1] 18 1 and other documents, combined with the actual situation of our city, through research,
A, watt-hour meter installation and renovation and other related expenses standards are still in accordance with the provisions of the Municipal Price Bureau (2002) 153 document, including:
(1) renovation fee standard of "one meter per household" for residents' electricity consumption in old residential buildings: "one meter per household" is implemented for electric energy meters (4kw), and the installation and renovation fee standard for the first and second floors is 470 yuan for each household, and 30 yuan will be added for each floor from the third floor (including the third floor).
(2) Old residential electricity users directly apply for the "one household, one meter" renovation of the 8kw watt-hour meter. The cost standard for the installation and renovation of the first and second floors is 695 yuan per household, and the 30 yuan is increased for each floor from the third floor (including the third floor).
(3) Residents who implement the principle of "one meter per household" and originally requested to change (5-20a) meters below 4kw will be charged for meter change, and each household will be in 20 yuan; It is required to change the original 4kw watt-hour meter to 8kw, and the renovation cost standard is 235 yuan per household; If the original watt-hour meter is less than 4kw, it needs to be changed to 8kw, and the renovation cost standard is 255 yuan per household.
Second, the charging standards for various electricity services carried out by power supply enterprises continue to be implemented according to the provisions of the Municipal Price Bureau 152 (see the attached table for details). Power supply enterprises shall adhere to the principle of user's voluntariness in carrying out various electricity services, and prohibit compulsory sales of goods and compulsory service charges during the service process, and shall not charge fees if they do not carry out services.
Three, according to the provisions of the State Planning Commission No.25 "Interim Measures for the Supervision and Examination of the Price and Cost of Important Commodities and Services", the above-mentioned electricity service charges are subject to annual examination. Please go to the window of the municipal administrative service center as soon as possible to go through the formalities for changing the business license and show the charging voucher. In the future, if there are new regulations in the country or province, they shall be implemented according to the new regulations.
June 24(th), 2004
Wuhu Power Supply Company Power Business Fee Collection Standard
serial number
kind
project
unit
Unit (yuan)
explain
1
Printing material fee
power supply contract
set up
6.00
A set of four books
2
Power transmission loss
Stop at the first branch
Dongsi
50.00
Including power loss, automobile shifting and labor cost; 1. A branch of a multi-family contract shall be regarded as a general branch. 2. If the suburban counties entrust rural fulgurite stations to operate, no operating fee will be charged.
Public distribution transformer and main branch stop power transmission.
Dongsi
100.00
The public trunk line is out of service (power outage charge 150 yuan)
Dongsi
300.00
three
Temporary electricity consumption without electricity meter
Permanent resident
Dongsi
10.00
Other users
Dongsi
30.00
four
Error of electric energy meter
Investigation fee
Single-phase 2.0 test
only
20.00
1, users must voluntarily apply for electric energy meter inspection; 2, watt-hour meter inspection qualified inspection fee receivable; 3. If the watt-hour meter inspection is really unqualified, the inspection fee for the watt-hour meter shall not be charged, and the overcharged fee shall be refunded to the user.
Level 2.0 Inspection Three-phase Four-wire Inspection
only
30.00
Three-phase four-wire 1.0 liquid level detection
only
40.00
Three-phase four-wire 0.5-level inspection
only
60.00
five
Pre-test cost of equipment
electric cable
root
100.00
Including insulation, withstand voltage, DC and grounding group tests.
Autumn insurance
group
50.00
Oil switch on column
platform
100.00
high-tension switch
platform
100.00
High voltage switchgear
platform
120.00
Transformers below 500 volts 10 volts and above
only
10.00-50.00
Lightning arrester 10KV
group
120.00
According to the power engineering quota.
Lightning arrester 35K
group
360.00
Capacitor 10KV
group
20.00
35KV capacitor
group
50.00
Safety equipment 10KV
individual
5.00
35KV safety equipment
individual
10.00
Nuclear phase 10KV
time
60.00
Nuclear phase 35KV
time
120.00
Bus withstand voltage
time
30.00
10KV interval pretest
time
60.00
35KV interval pretest
time
120.00
10KV switch
platform
60.00
10KV pole switch
platform
400.00
10KV insulator withstand voltage
only
2.00
35KV insulator withstand voltage
only
5.00
Partial discharge test
time
200.00
Insulation Resistance Test (Centralized)
time
40.00
Insulation resistance test (grounding grid)
time
200.00
six
Transformer power
Test cost
10KV, 3 15KV and below.
taiji
360.00
According to the power engineering quota.
800KVA
taiji
450.00
1600KVA
taiji
600.00
2000 kva
taiji
900.00
35KV, 400KVA and below
taiji
450.00
1000KVA
taiji
600.00
2500 kva
taiji
900.00
10000KVA
taiji
1200.00
seven
Compensation for electric energy meter
single - phase kilowatt - hour meter
only
70.00
Users who damage the electric energy meter should pay compensation according to the original price.
Single-phase electronic energy meter
only
68.00
Single-phase anti-theft electronic watch
only
129.00
Three-phase four-wire electronic watch
only
460.00
Three-phase three-wire, three-phase four-wire complex rate electronic meter
only
720.00
Three-phase three-wire (grade 1.0s) and three-phase four-wire multifunctional electronic watches.
only
720.00
Three-phase three-wire (0.5s class) multifunctional electronic watch
only
2700.00
Three-phase four-wire prepaid watt-hour meter
only
980.00
Pressure loss, cut-off and short-circuit timer
only
2500.00
- Previous article:What about Dongguan Shuntaiyuan Property Management Co., Ltd.?
- Next article:Where is the address of Verona Garden in Mudanjiang?
- Related articles
- What is the telephone number of Aksu Tianhui Textile City Mingyuan Marketing Center?
- Where is Ili Kanghuiyuan?
- When will longshui town Xinfu Garden be completed?
- What is the telephone number of the sales office of Wuxi Tianshan West Lake in Shijiazhuang?
- How about Guangxi Shengxin Property Management Co., Ltd.?
- Property 2020 Customer Service Front Desk Work Plan
- What is the price of Taohuayuan Villa in Guiyang and Honglan City?
- How about New World (Anshan) Property Management Co., Ltd.
- Xiaoyi city Property Management Service Center is a state-owned enterprise?
- What is the contact number of Shaoxing East Lake Scenic Area?