What aspects should be paid attention to in the process of decoration completion acceptance?

Many people have worked hard for several months and finally decorated it, but they should have neglected a link, which led to many problems. That is the completion acceptance, which is a step in the decoration process, representing that the fine decoration part of the decoration company has been completely completed. So what should we pay attention to when the decoration is completed and accepted? What are the precautions for completion acceptance? This article is a brief introduction for everyone!

A, the completion acceptance process

1. After the decoration construction, the decorator and the person in charge of the decoration enterprise * * * apply to the management office for acceptance.

2. The management office shall organize the acceptance personnel (mechanical and electrical maintenance team leaders and technicians, public affairs team leaders and administrators) to conduct on-site acceptance of the decoration within the same day. If there is no violation in the decoration, it shall be handled according to the following procedures: if there is violation, it shall be handled according to the violation treatment method.

3. When the project is completed and accepted, the director of the public service group of the management office will sign the preliminary inspection opinions in the completion acceptance column of the Decoration Application Form, and sign the name and date.

4. Management office security team to recover the construction permit, if lost, decoration enterprises should give some compensation.

5. The decoration enterprise will leave the site on the same day.

6. After one month's acceptance of the decoration, the Public Affairs Section of the Management Office shall organize the re-inspection of the decoration construction. There is no problem in reinspection. The director of public affairs group should indicate the re-inspection in the decoration application form and send it to the director of management office for approval. The financial department will refund the decoration deposit of the decorator and the decoration enterprise.

7, decoration construction acceptance, decoration people have illegal decoration behavior, the director of the public * * * affairs group shall make an evaluation according to the provisions, and list the amount of deduction as appropriate. With the consent of the director of management office, give a list of deductions to the decoration people and a copy to the financial group, and the financial group will deduct them in the following ways:

1, first deduct money from the decoration deposit of the decoration enterprise;

2. If the decoration margin of the decoration enterprise is insufficient to compensate for the deduction, it shall be deducted from the decoration margin of the decoration person;

3. If the decoration deposit of the decorator cannot be compensated, the decorator shall be required to compensate;

4, decoration data archiving, long-term preservation.

Second, the completion inspection and acceptance of the matters needing attention

1, doors and windows installed firmly.

Doors and windows must be installed firmly, horizontally and vertically, with the same height. Doors and windows should be opened flexibly, without blockage and rebound. Complete hardware accessories. The installation position of the door lock is correct, and the switch is flexible and effective. After the doors and windows are installed, the surface should be clean, and the bedding face should be free of scratches and bumps. The paint film should be smooth, uniform in thickness and free of air holes. Curtain boxes, heating covers, wooden parapets, wooden partitions, door and window covers, skirting boards, decorative lines, etc. of fine woodwork. Must be nailed to the grass-roots level and must not be loose. The gasket and panel must be firmly bonded, and layering or bulging is not allowed. Paint should be smooth, flat and uniform in color.

2, water pipe installation is qualified

The hot and cold water switches, faucets and showers in the bathroom are all installed straight, which is flexible and convenient to use. You can switch it on and off several times during acceptance to see if the water flow changes with the opening of the wind gate. The drainage pipe should be unblocked without slope, blockage and leakage, and the floor drain grate should be slightly lower than the ground. During acceptance, water should be filled repeatedly, and then drained to see if the drainage is smooth.

3, brick flat and firm

Wall and floor tile paving should be smooth and firm, with uniform joints, and local hollowing should not exceed 5% of the total. Around the waterproof layer of the kitchen and bathroom, the contact with the wall should be turned up, not less than 250 mm from the ground. The running water on the ground surface inclines to the floor drain, and there is no flooding or water accumulation, and there is no leakage in the 24-hour water storage test.

4, wall coating construction

Wall coating engineering requires putty to be firmly combined with matrix without peeling, pulverization and cracking. No peeling, brush leakage or undercoating is allowed for latex paint, and there is no sagging or wrinkle on the surface. The surface color is consistent and there is no obvious brush mark.

5, keel fixation

When wooden decorative lines such as hanging mirror lines and top corner lines are butted, 45-degree rubber slope joints should be adopted, and there can be no staggered joints or split joints. It is required to be straight, even and close to the wall, with correct convergence. The ceiling keel shall not be distorted, and the installed keel shall be firm and reliable. Plasterboard cover is closely connected with keel, and should be fixed on keel with galvanized screws, and nail head should be coated with antirust paint.

6, electrical engineering inspection

After the completion of electrical engineering construction, necessary inspections and tests should be carried out, such as lighting of lamps, control of switches, and repeated switching several times. Check whether the line meets the requirements of live wire switch and neutral wire lamp holder, and the socket should meet the requirements of left zero right fire and grounding. Switch socket panel should be installed firmly, with correct position, flat cover, smooth surface, close to the wall and no gaps around. The switch or socket height in the same room should be consistent. After the completion of the project, ask the construction unit for the wiring completion drawing, indicating the wire specifications and the direction of the concealed pipe.

Third, the completion acceptance details

1. Acceptance by the construction director

Acceptance shall be led by construction personnel. After the acceptance, start the field work. All construction personnel should leave the site in time.

2. Tripartite acceptance

Three parties make an appointment for formal acceptance. The construction team informs the owner and the property management company to make an appointment for formal acceptance. After the acceptance of both parties, the decoration project is officially delivered to the owner.

summary

To sum up, the owner pays all the expenses of the decoration company or the construction team. The other party will send it. Give it to the owner. At the same time, the property company should refund the deposit to the owner for the matters needing attention in the completion acceptance of the decoration.

4. Decoration warranty card

The decoration company will form a decoration team and issue a decoration project reputation warranty card to the owner. The owner should take good care of the animals so that they can be repaired in time when there are problems in the process of closing the house in the future.

The above is the relevant content about the renovation completion acceptance process, and I hope it will help everyone!