Job Recruitment Website - Property management - Installation requirements of air conditioner and air conditioner external unit in computer room
Installation requirements of air conditioner and air conditioner external unit in computer room
2. The outdoor unit requires that the upper and lower doors can be smooth in the vertical direction.
3, air conditioning condensate pipe should be inserted into the adjacent rainwater pipe condensation interface.
4. The outdoor pipes of the outdoor unit should be uniformly set on one side and the upper side of the air conditioning panel according to the property requirements.
The next households are all straight men, in the same position.
The opening position on the outdoor pipe wall of the outdoor unit on the first floor is not less than 15cm from the garage roof, and the waterproof layer shall not be damaged.
5. The outdoor unit of air conditioner should be installed firmly, and the external walls of all buildings in this residential area should be provided with insulation layers. Requirements: 1) The air conditioning panel shall be fixed, and the length of the fixing bolt shall not be less than 12cm (in.
The depth of the structural layer is 7 cm).
2) The hanger is used for fixing, and the length of the hanger fixing bolt is not less than 20 cm.
M (the depth into the structural layer is 12cm), and there are not less than two fixing bolts.
3) Waterproof parts, fixed hangers, etc. Do not damage the waterproof layer.
6, fixed bolt hole, pipe wall hole to waterproof closed processing.
Before tightening, the bolt holes shall be sealed with glass glue, and the through-wall holes shall be plugged with waterproof putty, and then a special protective cap shall be installed.
- Related articles
- He: Hechuang speeds up the product layout and launches at least one new model every year.
- Template model of epidemic prevention and control notice announcement (7 highlights)
- The owners' committee encroaches on the property owned by the owners.
- Why doesn't live central control recruit interns?
- Development of Chongqing Branch of Datang International Power Generation Co., Ltd.
- What is the telephone number of Dalian Liang Ming Food Co., Ltd.?
- Xianjian 3 When I arrived at Tangjiabao, Tang Jingren told me to get off. . I returned to Yong 'an Dang. Jing Tian said it's not far from Tangjiabao ... What happened?
- How about Min 'an Huafu District C?
- Do you think it is reasonable for the owner to buy only one parking space and ask the property to enter two license plates?
- When will Jiujiang Gandian Fu Rong open?