What points should be paid attention to in the whole process of civil construction?

Pre-construction procedure

1. Letter of approval for construction land (bidding: auction) (approval time: 20 working days)

1, application form for approval of construction land

2, the state-owned land transfer contract

3. Topographic map

Two. Land confirmation (approval time: 7 working days)

1, application form for confirmation of construction land

2, land ownership documents (land certificate or transfer contract)

3. Provide investment plan

4. 3 copies of cadastral map

Three. Site selection opinion (approval time: 30 working days (it can be extended 10 working days))

1, site selection opinion declaration form

2, the project proposal approval documents or land transfer agreement and land use plan

3, the proposed project site selection requirements or demonstration materials

Fourth, the project establishment

1, project application

2. Business license

3, environmental assessment report (environmental protection declaration registration form)

4, site selection opinions

5. Resolutions of the Board of Directors

6. Land agreement

7. Land Confirmation Letter

8, investment project approval registration form

9. Application for approval of foreign investment projects

Verb (abbreviation of verb) construction application registration form

Construction project registration form

Six, the annual investment plan (cancelled since 2005, replaced by project documents):

Seven, design bidding

1, project approval document

2. Provide investment plan

3, design bidding registration form

4, design bidding for the record

5, the construction project bidding unit registration form

6, commissioned design agreement

Eight, commissioned design scheme

1, commissioned design

2, planning points

Nine. Examination and approval of architectural design scheme (examination and approval time: 9 working days)

1, architectural design scheme declaration form (approval time: 20 working days)

2. 1/500 topographic map

3. Land contract

4. Investment plan

5. Three copies of the scheme (effect drawing, general plan, plan of each floor, elevation drawing and section drawing).

X. Construction Land Planning Permit (approval time: 20 working days (it can be extended 10 working days))

1, construction land planning permit application form

2, site selection opinions

3. Topographic map

4, the approved planning results or general plan.

5, environmental assessment report

XI。 drill

1. Registration Form for Geotechnical Investigation of Construction Project

2. Party A shall provide design and production process conditions.

3. Issue geological report (test pile)

12. Entrusted construction drawing design (approval time: 30 working days)

Thirteen, construction drawing review

1, approved by the planning department

2, construction management audit (charge)

Fourteen, reported to the fire approval

1, building fire design fire audit declaration form

2. Project plan

3. Design fire-fighting equipment.

4, the general plan, building construction drawing, fire control system diagram, fire control configuration design drawings and instructions.

5. Design drawings related to heating, ventilation, smoke prevention, explosion prevention, power transformation and distribution.

6, bound into a book (A4 paper)

XV. Civil air defense

4% of the construction area of office and living rooms; For example, the construction in different places is 2000 yuan/㎡.

XVI. Construction Project Planning Permit (approval time: 20 working days (extendable 10 working days))

1, construction project planning permit declaration form

2. Investment plan

3. Construction drawing (3 electronic versions of building 1)

4. Scheme approval notice (necessary documents related to the project)

5, fire protection, supporting, environmental protection, civil air defense department approval documents

6, construction land planning permit

7. Examination and approval of construction land

8. Land deed

9, land ownership certificate or document.

17. supervision bidding

1, bid registration form

2. Project plan

3. Investment plan

4. Bidding Registration Form

Eighteen, construction bidding

1, bid registration form

2. Project plan

3. Investment plan

4. Bidding Registration Form

Nineteen, quality supervision, safety records

1, quality supervision registration form

2, safety measures for the record registration form

Twenty, the construction permit

1, construction land planning permit

2, the construction project planning permit

3, construction bid-winning notice and construction contract

4, construction drawings and technical data report

5, quality supervision registration form, safety measures for the record.

6. Bank deposit certificate

The project is in progress.

(1) Before construction

1, go through the commencement formalities.

Before the construction team enters the site, it should follow the regulations of the property management department: the owner and the decoration company should go through the formalities of commencement and stationing, the decoration company should provide a copy of the business license, the ID card and photos of the construction personnel, and the property management department should issue the commencement permit, pass and stationing.

2. Design site disclosure

On the day of commencement, the designer will call the owner, the person in charge of construction and the project supervisor to the construction site for disclosure, and finally determine and implement the construction plan. Test the wall, roof, floor and water and electricity of the original house, establish the image of enterprise engineering, dismantle, clean, pay off, wire trough, water and electricity pipeline and carpentry to make ceiling, and submit the test results to the owner. After on-site disclosure, the whole construction process is completed by designers, quality inspectors, foremen and workers. The person in charge of the construction site (project manager) will handle the daily affairs during the construction period. At the start of construction, the person in charge of construction shall submit the construction progress plan and arrange the specific time for material procurement and sub-item acceptance.

3, feeding and acceptance

Upon receiving the notice from the person in charge of the construction site, the company's material distribution center will uniformly distribute the decoration materials. After the materials enter the site, the owner shall check the quality and brand of the materials, and fill in the acceptance sheet for decorative materials. After the acceptance, the construction personnel started construction. The decoration materials provided by Party A (the owner) shall be provided according to the time specified in the construction progress plan. During the procurement process, Party B (decoration company) can send people to cooperate with the procurement, and Party A can also entrust Party B to purchase directly on its behalf, and sign a power of attorney for the procurement of main materials.

(2) Medium-term construction

1. In areas with waterproof requirements (such as toilets), a 24-hour closed water test should be conducted before construction to test the waterproof quality of the original house.

2, cooperate with foreman to carry out hydropower and other early reconstruction projects; Ceiling sealing plate after concealed engineering acceptance.

3, construction, construction director (foreman) organization and management of each type of work, and supervise and inspect the engineering quality.

4. For the main decoration materials that need to be provided by the owner during the construction, the person in charge of the construction shall notify 3 days in advance so that the owner can prepare in advance.

5, the owner according to the "construction progress schedule" in the time to visit the site on a regular basis, understand the construction process,

Check the construction quality, and conduct sub-item acceptance. Find the problem, negotiate with the foreman, fill in the project rectification agreement for project rectification, and then conduct acceptance.

6, the company's engineering supervision (or quality inspector) from time to time to check the construction organization, management, specification and construction quality of the site, and leave inspection records on the site for the owner's supervision.

7, the owner and foreman to discuss and determine all the changes in the construction project, fill in the "engineering change order". Increase or decrease items are changed and increase items are delivered. raise

Subtraction changes are not included in the construction period.

8. After the completion of the hydropower renovation project, the owner shall conduct inspection and acceptance of concealed works.

9. The company's managers regularly contact the owners, listen to the real ideas and valuable opinions of customers, and find and solve problems in time.

10, the project progress is over half, and the owner carries out the acceptance of the interim project and pays the interim project payment.

(3) Late stage of construction

1. At the end of the project, the foreman will do a self-inspection work comprehensively and seriously. If there is no quality problem in the internal completion acceptance after inspection, the owner and supervisor will be informed to carry out the overall completion acceptance. 2. If problems are found during acceptance, discuss and rectify them; After acceptance, fill in the project acceptance form and leave your valuable comments, and settle the balance. The company will fill in the project warranty form for the owner and affix the warranty seal, and the project will be officially delivered to the owner for use and enter the warranty period.

3. The project enters the after-sales service stage.

After construction

1, two-year warranty system

During the two-year warranty period, if there are any quality problems (non-human) in the project, the company is responsible for free on-site maintenance.

The engineering department will arrange maintenance personnel to arrive at the site within 48 hours from the time of applying for maintenance, and implement the maintenance plan;

Waterproof works, water and circuit works will be repaired within 12 hours.

2. Lifelong maintenance system

After the warranty period, the company is also responsible for the maintenance of quality problems in the project, and the expenses are charged according to the actual situation.

3, regular return visit system

After the completion of the project, the company's customer service staff will visit the owner regularly to understand the quality and use of the project and remind the owner of some matters needing attention in time.

note:

1. Every subdivisional work must pass the acceptance of the company's engineering department.

2. Four major acceptances: a. Foundation acceptance (including wall demolition, wall paving, wall foundation treatment, etc.). ), b, concealed engineering acceptance, c, mid-term acceptance, d, overall acceptance;

Before proceeding to the next step, we must complete the acceptance procedure with the owner.