Job Recruitment Website - Property management - How to apply for installing residential charging piles
How to apply for installing residential charging piles
1. Register to download online State Grid, log in online State Grid and open "More"; Click "power on" and then click "charging pile installation";
2. Select the address where the charging pile is installed; Prepare parking space certificate, ID card and title certificate;
3. Upload your ID card; Fill in the parking space detailed address and charging pile capacity; Upload parking space certificate and property right certificate before submission;
4. After submission, you can view the installation progress; Install the charging pile electric meter interface;
5. After the construction is completed, the charging pile service provider needs to report to the power company, and the power company will go to the site for acceptance, check the charging equipment and charging situation, and confirm that the charging equipment can operate normally without affecting other electrical equipment;
6. After confirming the charging conditions, you need to apply for a new watt-hour meter. Generally, after signing the car purchase contract, the new energy meter can apply to the local power supply company by telegraph by itself or by entrusting the 4S shop. After the power supply company gives a reply to the power supply plan, it shall go through the formalities at the power supply company within the validity period.
Can I install charging piles in the underground garage of the community?
The installation of charging piles in the underground garage of residential quarters needs to be determined according to specific conditions:
1. If the owners of the residential area install charging piles privately for more convenient charging, it is not allowed, because many underground parking lots belong to civil air defense projects, and the construction and use standards are strict, so they cannot be rebuilt privately.
2. If the charging pile is allowed to be installed after communication with the property and information is submitted to the relevant departments, the charging pile is allowed to be installed.
Installation technology of charging pile in underground garage
1. Pay attention to the surrounding environment before installation.
When installing charging piles in underground garages, we need to observe the surrounding environment first. We need to measure the length of the charging area first, then measure the distance from the charging pile to the parking space, and then determine the location of the distribution box and the routing distance of the power cord. At the same time, it depends on whether the light is sufficient and whether the underground garage signal is stable.
2. Install charging piles
When we install charging piles in the underground garage, we need to plan the distance of sockets in advance, and then confirm the specifications of the number of charging piles to ensure that other vehicles can get in and out smoothly. At the same time, the socket can be marked in advance, and different charging line lengths can be set according to the distance of the socket.
3. Connect the power cord by a professional electrician.
After the charging pile is installed, you can connect the last power cord. When connecting the power supply, it is best to be operated by the circuit builder. At the same time, before connecting the power supply, make sure that the charging pile has been correctly connected to the zero live wire and the ground wire. Finally, after the safety is confirmed, power on to test whether the charging pile runs normally.
- Previous article:National standard for elevator service life
- Next article:What is the telephone number of Beihai Zhongnan Pearl Sales and Marketing Center?
- Related articles
- What about Piggy Too Heavy (Beijing) Education Consulting Co., Ltd.
- Is Phoenix Street well located and clean?
- Where is Yongxing Village?
- Which bus should I take from Yantai Railway Station to Fanghuayuan Shopping Center? How long will it take? Thank you, kind people! ! ! Reward 10
- 20 18 what is the charging standard of the new property law?
- What is the telephone number of the sales office of Shanghai Guole Plaza?
- How many stars is Wuhan Mingxing Property?
- What is the land number of Xinxiang Heng Chang Special Zone?
- Where is Jinhua Garden Impression City?
- Is the property responsible for the theft of uninhabited houses?