Security Letter 1 Commitment Letter of Hotel Security Responsibility: Security Department is the security part of the hotel and the functional part responsible for hotel security work. The staff of the security department is mainly responsible for the security of the hotel, maintaining public order inside the hotel and ensuring the property and personal safety of the hotel and its staff. The safety of the hotel is closely related to the fate of the hotel. Therefore, in order to clarify the responsibilities of the security staff, this fire safety responsibility book is formulated.
1, carefully record * * * and go through the formalities of * * *. Otherwise, all accidents will be the responsibility of two types of employees and some relevant responsible persons.
2. Strict cargo entry and exit and release procedures. If the goods are lost due to lax control of the guard post and the monitoring post, the Finance Department will evaluate the value of the lost goods, and the security guards of the guard post and the monitoring post and some relevant responsible persons will be liable for compensation.
3. If the guest's vehicle stays at night, and the security guard fails to conscientiously perform the Parking Lot Vehicle Number Copy Report Form and carefully check it, causing the vehicle to be stolen or vandalized, the responsibility shall be borne by the security guard on duty and some relevant responsible persons.
4, stick to their posts, don't leave, don't channeling hillock, often patrol, check the area of responsibility, timely find unsafe hidden dangers. If robbery, theft, fire, etc. In case of AWOL, off-duty, careless and incomplete inspection of the responsible area, all responsibilities shall be borne by the security guard on duty and the relevant person in charge.
5. The security guard of the fire control center should check the normal operation of the hotel fire equipment every day. If it is found that the fire control facilities and equipment can not operate normally or are abnormal, it shall report in writing to some responsible persons in time.
6. Patrol security. If the hotel cannot be inspected seriously and completely according to the regulations, and accidents such as theft, murder and fire occur due to non-compliance, the patrol security guards shall be liable for dereliction of duty.
7. There was a theft or fire in the hotel, and the security guard did not arrive at the scene in time after receiving the alarm, which led to the expansion of the accident. The security guard on duty, the security guard who received the alarm and the relevant person in charge are responsible for the accident.
8. The head of the security department shall formulate long-term and short-term fire safety training system and long-term and short-term fire safety inspection system. If a safety accident occurs due to the failure to formulate the above system, some responsible persons shall bear the main responsibility.
9. Some responsible persons need to conduct fire safety training for each new employee of the hotel, and it is forbidden to train employees in different positions to take up their posts. 10. Some responsible persons monitor the implementation of the rectification notice within a time limit in various parts at the behest of the general manager, report the rectification results to the general manager in time, and rectify the hidden danger parts and parts at the behest of the general manager.
1 1. Some responsible persons should strictly demand and standardize the staff of the security department according to the hotel rules and regulations. Du Jin has no organization and discipline.
12. If an employee of the security department is injured due to safeguarding the interests of the hotel, the hotel will be responsible for all relevant medical expenses until he returns to normal work. Disability or death shall be handled in accordance with state regulations.
13. Part of the person in charge is the person in charge of fire safety in this part, mainly responsible for fire safety.
15. If there are no accidents within the scope of responsibility within one year, the hotel will give rewards according to the actual situation.
16. This responsibility book is made in duplicate, with the same legal effect.
Safety Assurance 2 Site Civilization Construction of Taicang Science and Education New Town Construction Project
Responsibility book for pre-control management of safety production objectives
In order to implement the safety production policy of "safety first, prevention first", according to the requirements of laws and regulations such as Construction Law, Safety Production Law, Regulations on Safety Production in Construction Projects, and Suzhou Construction Safety Supervision and Management Measures, the responsibility system for safety production is established and improved, the safety responsibilities of all parties in construction activities are fully implemented, and the responsibility is strictly investigated to ensure the smooth progress of subsequent projects and protect the personal health of on-site operators.
Project overview
First of all, ensure that the following personnel are in place, and each shall bear the safety responsibility for the construction of this project.
1. On-site representative of the construction unit: Tel:
2. Project leader: certificate number. : Tel:
3. Safety Officer: ID number. : Tel:
4. Chief supervision engineer: certificate number. : Tel:
Second, the safety responsibility of the construction unit
1, according to the relevant provisions of the state and the contract, the construction unit shall allocate the cost of safety protection and civilized construction measures for construction projects.
2. Provide underground pipeline data, meteorological and hydrological observation data, adjacent buildings and structures, underground engineering and other related information to the unit before construction. At the construction site and adjacent areas.
3. Not to survey, design, construction, project supervision and other units do not meet the requirements of laws, regulations and mandatory standards for safety production of construction projects and do not compress the construction period agreed in the contract.
4. It is not allowed to express or imply that the construction unit purchases, leases or uses safety protection appliances, machinery and equipment, construction tools and accessories, fire control facilities and equipment that do not meet the requirements of safe construction.
5. Take the lead in organizing two or more construction units in the same operation area to sign the construction project safety responsibility guarantee and safety production management agreement.
Third, the safety responsibility of the construction unit
1, the project leader of the construction unit is responsible for the safe construction of the construction project, and strictly abides by the JGJ 59-99 standard and relevant specifications. Implement the safety production responsibility system, safety production rules and regulations and operating procedures, ensure the effective use of safety production expenses, organize and formulate safety construction measures according to engineering characteristics, eliminate hidden dangers of safety accidents, and report safety production accidents in a timely and truthful manner. Fill in the on-site hidden danger investigation report before 30 days of each month and submit it to the Planning and Construction Bureau of the Science and Education New Town Management Committee.
2. The construction unit shall set up a project safety management organization in accordance with the regulations, and be equipped with full-time safety production management personnel to earnestly perform the safety supervision and management duties in the project construction, and keep a "safety diary" at the site.
3. The construction unit shall use the safe working environment and safety construction measures included in the budgetary estimate of the construction project for the procurement and updating of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and shall not use them for other purposes.
4, the construction project construction general contracting, the general contractor is responsible for the overall responsibility for production safety in the construction site. total
Where a contractor subcontracts a construction project to other units according to law, it shall specify their respective rights and obligations for safe production in the subcontract. The general contractor and subcontractors shall bear joint and several responsibilities for the safety production of subcontracted projects. Subcontractors shall obey the safety production management of the general contractor, and if the subcontractors do not obey the management and cause production safety accidents, the subcontractors shall bear the main responsibility.
5, the construction unit should do a good job of "three-level education" and pre-job training for employees, so as to educate before taking up their posts; Special operations personnel must undergo special safety operation training in accordance with the relevant provisions of the state and obtain the qualification certificate for special operations before taking up their posts.
6. Establish a system of registration, publicity and monitoring of major hazard sources. The construction unit shall formulate safety technical measures and temporary electricity utilization plans for the construction site in the construction organization design. For partial projects with strong professionalism and high risks, such as formwork engineering, hoisting engineering and scaffolding engineering, special construction plans shall be prepared with safety inspection results, which shall be implemented after being signed by the technical director of the construction unit and the chief supervision engineer, and supervised by full-time safety production management personnel on site. Major construction risks of partial projects must be demonstrated and reviewed by an expert group.
7. The technical personnel in charge of project management of the construction unit shall explain in detail the technical requirements for safe construction to the construction team and operators, and both parties shall sign for confirmation.
8, the construction unit should be at the entrance to the construction site, construction hoisting machinery, temporary electricity facilities, scaffolding, access, stairs, elevator wellhead, hole, bridge mouth, tunnel mouth, foundation pit, explosives and hazardous gas and fluid storage places and other dangerous parts, set up obvious safety warning signs. Safety warning signs must conform to national standards.
9. The construction unit shall take corresponding safety construction measures at the construction site according to the changes of different construction stages, surrounding environment, seasons and climate. If the construction site temporarily stops construction, the construction unit shall do a good job in site protection.
10, the construction unit shall separate the office, living area and working area of the construction site, and keep a safe distance; The locations of offices and living quarters shall meet the safety requirements. Workers' meals, drinking water, rest places, etc. Should meet the hygiene standards. Staff quarters shall not be set up in uncompleted residential flats.
Temporary buildings on the construction site shall meet the requirements for safe use. Precast mobile homes used in the construction site should have product certificates.
1 1. The construction unit shall abide by the relevant laws and regulations on environmental protection, and the construction site shall be closed for management. Fences and gates should be solid and beautiful, and the name of the enterprise and project should be written on the lintel. The site layout is reasonable and standardized, with five certificates and one map, complete signs and neat and beautiful hanging. Prevent or reduce dust, waste gas, waste water, solid waste, noise and vibration.
And the harm and pollution of architectural lighting to human body and surrounding environment.
12, the construction unit shall establish a responsibility system for fire control safety in the construction site, determine the person responsible for fire control safety, formulate various fire control safety management systems and operating procedures such as fire, electricity, inflammable and explosive materials, set up fire exits, fire water sources, equipped with fire control facilities and fire extinguishing equipment, and set up obvious signs at the entrance to the construction site.
13. Safety protection appliances, mechanical equipment, construction machinery and accessories purchased and leased by the construction unit shall have production (manufacturing) licenses and product certificates, and shall be inspected before entering the construction site.
14, the safety protection appliances, mechanical equipment, construction machines and accessories on the construction site must be managed by special personnel, regularly inspected, repaired and maintained, and corresponding data files shall be established, which shall be scrapped in time in accordance with relevant state regulations.
15, jack-up erection facilities such as construction hoisting machinery, integral lifting scaffolding and formwork shall be registered and used according to regulations. Construction hoisting machinery and equipment shall be registered with property rights first, informed before installation, registered for use, informed before demolition and cancelled.
16, the construction unit should handle accidental injury insurance for personnel engaged in dangerous operations at the construction site. The accident insurance fee shall be paid by the construction unit. In the case of general construction contract, the general contractor shall pay the accident insurance premium. The insurance period of accidental injury insurance is from the date of commencement of the construction project to the date of completion and acceptance.
17, construction workers and project managers are prohibited from swimming in Days Mirror Lake.
Fourth, the safety responsibility of the supervision unit
1. Incorporate the contents of safety production management into the supervision plan, and clarify the scope, contents, working procedures and institutional measures of safety supervision, as well as the staffing plan and responsibilities; For the medium-sized and above projects and larger sub-projects specified in Article 26 of the Regulations, the supervision unit shall prepare the detailed rules for the implementation of supervision. The detailed rules for implementation shall specify the methods, measures and control points of safety supervision, as well as the inspection scheme for safety technical measures of the construction unit.
2. Review the qualification of the general and sub-contracted construction enterprises and the safety production license, and obtain the safety production assessment certificate and operation qualification certificate for the three types of personnel and special operations personnel.
3. Review the safety production guarantee system, safety production responsibility system, various rules and regulations, the establishment and staffing of safety supervision institutions of the general and subcontracting construction enterprises.
4, audit the construction enterprise emergency rescue and safety protection, civilized construction measures cost plan.
5. Check whether the safety protection of the construction site meets the commitments made during bidding and the requirements of standards such as Environmental Hygiene Standard for Construction Site.
6, review the construction unit construction machinery and integral lifting scaffolding, templates and other jack-up erection facilities, safety protection equipment, all kinds of facilities safety license acceptance records, and signed by the safety supervision personnel for the record.
7, review the safety technical measures in the construction organization design or special construction scheme is in line with the mandatory standards for engineering construction.
8, regular patrol inspection of dangerous engineering operations.
9. In addition to urging the construction unit to carry out weekly inspection of the project department and daily inspection of the team, the supervision unit shall report the weekly inspection record to the supervision unit for the record, and make a comprehensive safety evaluation of the safety production situation in different construction stages (before construction, foundation leveling, main body capping and decoration) in the construction process together with the construction unit as required, and record the evaluation results.
10, the project supervision unit and supervision engineer shall carry out supervision in accordance with laws, regulations and mandatory standards for engineering construction, and assume supervision responsibility for the safe production of construction projects.
In the process of engineering construction, the supervision unit shall strengthen the inspection and inspection of the construction site, and urge the construction unit to strictly implement the safety technical measures in the construction organization design and special construction scheme that meet the mandatory standards of engineering construction after examination and approval. If hidden dangers of safety accidents are found, the construction unit shall be required to make timely rectification. If the situation is serious, the construction unit shall be required to stop the construction immediately and report to the construction unit in time. If the construction unit refuses to rectify or stop the construction, the project supervision unit shall report to the relevant competent department in time. Conscientiously implement the work report system of production safety supervision, and fill in the construction safety supervision report before 30 days of each month.
Five, other units of production safety responsibility
1. The leasing unit of machinery and equipment, construction machinery and accessories shall provide relevant manufacturing licenses, product certificates and inspection certificates.
2, building overweight machinery and integral lifting scaffolding, templates and other jack-up erection facilities installation unit should provide enterprise qualification, safety construction measures and acceptance and debugging information.
3. The inspection and testing unit of jack-up erection facilities such as construction hoisting machinery and integral lifting scaffolding and formwork shall provide enterprise qualifications and issue safety certificates.
The promise of all parties to intransitive verbs.
1, strictly abide by the national laws and regulations on production safety, conscientiously implement the safety technical specifications and standards, undertake their own safety responsibilities, and fulfill relevant obligations to ensure the safety of project construction.
2. Truthfully provide relevant filing materials, and actively cooperate with the safety supervision and inspection of the competent departments of the industry and other departments.
1. Strictly abide by national, provincial and municipal road traffic management laws and regulations, and abide by social morality and urban civilization.
Through the "three concessions" regulations, we will not fight for roads, run red lights and violate signs and markings.
Second, strictly abide by the "one book, three certificates and two certificates" and "three stops and five stops" of the joint inspection of people and vehicles of the group.
Management regulations, such as to ensure that the vehicle braking, steering, lighting in good condition, equipped with safety hammer, fire fighting in accordance with the provisions.
Device, safety belt and engine high temperature automatic fire extinguishing device.
Three, strictly abide by the Ministry of communications "super long distance continuous running sleeper bus from 2 am to 5 am temporary parking regulations".
Rest "; Strictly carry out the "three products" inspection at the departure station and the en route station to prevent the three products from getting on the bus.
Fourth, strict requirements: no overcrowding, no speeding, no fatigue driving, no use of cars with illness.
It is forbidden to mix passengers and goods, overload passengers, get on dangerous goods, drink and drive and violate the rules on the road.
Chapter operation.
5. Remind passengers to wear seat belts correctly, and it is forbidden to smoke and carry dangerous goods in the car.
Sixth, attend driver safety meetings and education and training on time, study notes carefully, and strictly abide by the set.
Requirements for various safety activities of the regiment.
Seven, to ensure the fire safety of vehicles, timely eliminate fire hazards, and effectively achieve early detection and early rectification.
Disposal, timely rescue, timely and properly evacuate passengers.
Eight, safe driving, civilized driving, so that people do not get on the bus if there is a problem, and the car does not go on the road if there is a problem, and the enterprise is guaranteed.
Industry safety production.
I promise to do the above, and if I stop voluntarily for rectification in violation of regulations, I will accept the relevant departments, the delivery group and
Subordinate units handle (including but not limited to informed criticism, economic compensation, termination of contract, etc.). ), I will bear it.
Bear all the losses caused by this.
Car number:
Affiliate: (Seal) Owner:
Driver:
20xx year month day
1
Chapter IV Safety and Security For the sake of personal safety and health and the stable development of enterprises, I voluntarily sign and abide by the following commitments in my work:
Safety responsibility
(1) Seriously implement the national laws and regulations on production safety and various safety management systems at the company and factory level.
(2) Organize the formulation of workshop safety management rules and regulations, safety technical operation procedures and safety technical measures plan.
(3) Organize workshop safety education for new employees.
(4) Organize safety group activities and listen to and adopt the correct suggestions put forward by employees in time.
(5) Organize the whole workshop personnel to conduct regular safety inspections to ensure that the equipment, safety devices, fire fighting and protective equipment are in good condition.
(6) Implement all tasks assigned by the office of the factory safety committee.
(6) Strictly implement the relevant labor protection articles distribution standards. Strengthen the management of workers' labor protection articles and protective articles, and educate workers to properly keep and use them.
(7) Adhere to the principle of "four no-misses", report and handle the accidents in this workshop in time, pay attention to protecting the site, find out the reasons and take preventive measures. Put forward opinions on those responsible for the accident, and report them to the competent department and the factory director for approval before implementation.
(8) Organize the safety management network of this workshop, equip qualified safety management personnel, support the work of workshop safety personnel, and give full play to the role of team safety personnel.
20xx year safety production target
The mortality rate per thousand people is 0;
The serious injury rate of thousands of people is 0;
The rate of minor injuries per thousand people is 0;
The incidence of occupational diseases is 0;
Major equipment accident is 0;
Major fires and other accidents are 0.
I consciously abide by the above commitments, and I am willing to take responsibility if I violate them. This letter of commitment shall come into effect as of the date of signing.
Organizer (signature): type of work: department to which the post belongs:
Head of department (signature):
date month year
Article 5 of safety assurance 1. Employees must wear labor protection articles correctly, lesbians should have curly hair, and it is strictly forbidden to go to work sick or drunk.
2. The personnel on duty should be familiar with the working principle, technological process, operating procedures and operating parameters of this part of the equipment.
3. When the packing layer and nozzle are blocked by scale and sludge, it must be confirmed that the switch has been cut off and listed before cleaning.
4. When the cooling water temperature at the outlet of the cooling tower exceeds 50℃, it shall be stopped immediately for inspection and treatment.
5. The water in the cooling water tank of the cooling tower should be completely replaced every 2 months of operation or when the kiln is stopped for maintenance, and the water tank should be cleaned to prevent the cooling water from concentrating due to the long-term operation of the cooling tower, so as to prevent the cooling part of the cooling tower and equipment from corrosion and scaling.
6. Before running the fan, please carefully check whether there are any foreign objects inside the cooling tower and on the fan blades. If the blades can be moved flexibly by hand (especially after the fan is overhauled and snowed), if this happens, they need to be removed and the lubricating oil level should be confirmed to be above the normal oil level before starting. During the operation of the fan, personnel are prohibited from entering the cooling tower.
7 When the reducer or motor is found to have abnormal vibration or sound during operation, it should be stopped immediately for inspection and treatment, and normal operation can be started only after the trial operation is normal.
8. In the process of operation, if the oil level is abnormally low, and the oil level gauge takes into account the oil leakage in the pipeline and the oil level drops abnormally, it should immediately stop the machine for inspection and handling.
9. Before starting the cooling water pump, confirm the water level in the cold water tank, the open and close state of the import and export valves, and open the exhaust hole at the upper part of the pump for exhaust. Only after completing the above procedures can the cooling water pump be started.
10. During the operation of the cooling water pump, closely monitor the water leakage at the root of the front and rear axle disks, the vibration of the unit and the outlet pressure. If there is any abnormality, you should contact all professionals to stop the machine (it can be switched when running alone) for inspection and handling;
1 1. When the water pump stops in winter, the inlet and outlet valves of the water pump should be closed and the upper drain of the water pump should be opened for drainage.
According to the 20xx annual production task index of our mine, in order to effectively ensure mine safety production, fully coordinate the daily production tasks of the mine department and the district, and ensure the safe and healthy development of the mine, this department voluntarily signed the following commitments and earnestly performed them.
1. Strictly and conscientiously implement safety laws and regulations: adhere to the safety policy of "safety first, prevention first and comprehensive treatment". Firmly establish the idea of "people-oriented, safety first", strictly implement it in this department in accordance with safety laws, regulations, directives and relevant regulations and systems, and conscientiously do a good job in safety work before production.
2, conscientiously implement the "safety first, prevention first, comprehensive management" policy of production safety, abide by the safety production system and rules and regulations, in strict accordance with the coal mine safety regulations, operating rules, operating rules to command and coordinate the work of production safety.
3, under the command of professional leaders, do a good job in mechanical and electrical and transportation safety and quality standards, earnestly do a good job in mechanical and electrical field management, strictly and seriously run the safety and health control system, completely eliminate hidden dangers in mines, put an end to the spread of hidden dangers, and ensure safe production in mines.
4. Supervise and manage the establishment and transformation of the main mine system, ensure the safe and stable operation of the main mine system, eliminate potential safety hazards in the system, and ensure the smooth progress of mine safety production.
5. Comprehensively coordinate professional safety management, do a good job in the use and adjustment of mine production equipment, strengthen on-site supervision and inspection of mechanical and electrical equipment, ensure the safe and stable operation of equipment, manage the safety debugging of main production equipment, and lay a foundation for mine safety production.
6. In case of an accident, timely notify relevant leaders and departments according to emergency measures and procedures, immediately organize on-site rescue work, carefully analyze the report afterwards, investigate the responsible units and persons, and formulate preventive measures to prevent accidents.
7, put an end to illegal command, do not violate labor discipline, take the initiative to stop and correct illegal behavior, strict post daily behavior norms, do a good job in professional management.
8. Fully implement the "safety and health control system", do a good job in risk control and hidden danger investigation and management of this major, analyze, judge and handle all kinds of accident symptoms in detail and correctly, and nip hidden dangers in the bud.
9. Carefully follow the professional rules and regulations and management measures, do a good job in safety hazard investigation and risk control, organize on-site hazard investigation three times a month, and formulate corrective measures in time. Organize and participate in professional work to conduct safety risk assessment beforehand, carefully analyze potential risks and formulate corrective measures. If high or high risk is found, make improvement measures immediately.
10, commitment date: 20xx 1 October-20xx 65438+2 February 3 1 February.
Person in charge of commitment unit: XX
20XX x month XX day
Person in charge of mine: XX
20XX x month XX day
Electrical system
20xx years 1 month
The seventh chapter of security is to ensure that I can play my normal level during the senior high school entrance examination, get excellent results, and complete the graduation examination safely and smoothly. I promise the school and parents to do the following:
1. Seriously study and understand the safety education and various disciplinary requirements of school leaders and teachers, so as to achieve "safety first, all actions are subject to instructions".
2. Riding: (1) Obey the teacher management of the school leaders. Go back and take the same bus, take a bus to the test center at school, and then take a bus back to school at the test center after the test. (2) Obey the instructions of the lead teacher, be a civilized passenger, get up and down in an orderly manner, don't stick any part of your body out of the car when riding, don't do things that the vehicle management personnel don't allow you to do, and don't get on or off the bus halfway. (3) Take care of your luggage and articles. (4) In case of special circumstances and events, contact the lead teacher in time to coordinate the handling, and do not advocate it.
3. Accommodation: (1) Obey the arrangement of the team leader and have a meal and rest in the test center school.
(2) Candidates are not allowed to buy moldy, spoiled and corrosive food to avoid poisoning; Don't accept food from strangers.
(3) Candidates are not allowed to go out to drink or smoke; Go to Internet cafes, karaoke bars and other entertainment places.
4. Exam: Seriously study and understand the contents of the relevant candidates' code, carefully check all the exam supplies and precautions, take the exam in good faith, resolutely do not violate the discipline of the senior high school entrance examination, easily enter the examination room, and answer questions carefully.
5. Abide by the discipline requirements of the test center school and take care of all public property of the test center school.
6. Civilized exchanges. Fighting is strictly prohibited to prevent conflicts with strangers. If there is any problem, find the team leader to solve it in time.
7. It is strictly forbidden to leave the collective and the test center school to act alone. If you really need to do something, you need to ask for leave from the teacher who leads the team, and you can go with them only after the leaders and teachers agree.
8. Test stationery and valuables should be kept by yourself.
9. Strengthen organizational discipline and obey the management of the team leader. Remember the cell phone number of the team leader correctly, and contact in time if anything happens.
10. After the exam, candidates must go home immediately after returning to school collectively. They are not allowed to go from house to house, party or bathe in the river. You can't go out unless your parents agree.
Student's signature: XXX Class XX, Grade 9
Signature of parents: XXX
20XX x month XX day
Article 8 of the Safety Guarantee: When the project construction unit undertakes various projects of Baiguang Co., Ltd. or carries out project construction within the company's scope, the construction unit and the contractor promise to the property management center of Baiguang Co., Ltd. to ensure strict compliance with the following provisions:
First, obey the management of the management department and site management personnel. Before construction, complete the relevant project declaration, approval and decoration admission procedures, and post the construction permit in a conspicuous place on the construction site. Construction personnel and management personnel must wear white temporary passes when entering the construction site, and offenders will confiscate their certificates and please leave the construction site. Building tools, instruments, etc. It shall conform to the safety standards issued by relevant state departments and be kept in good condition before entering the site.
The second is to do a good job in fire prevention and electricity safety. The construction site must be equipped with fire fighting equipment according to regulations; Before any hot work such as gas, electric welding, heating, etc., go to the property management department to apply for a hot work permit according to regulations, and equip with sufficient fire-fighting equipment and designated supervisors before construction, and offenders will be fined 20xx yuan/time; The connection of electricity and water for construction shall be carried out under the guidance of the management personnel of the white light property department, and the wires shall not be connected indiscriminately, and the offender shall be deducted from the liquidated damages of 300 yuan/Zong; Smoking, burning sundries and cooking with fire are strictly prohibited in the construction site, and offenders will be fined 100 yuan/person; Decoration materials should be selected according to the provisions of the municipal or district fire department. When materials or finished products enter the site, a copy of the invoice for purchasing flame retardant materials should be submitted to the safety supervisor for review. Materials or finished products that do not meet the requirements shall not enter the site, and shall be responsible for the completion and delay of the construction period.
3. Before the concealed works in construction are closed, they must be checked and approved by the management department and management personnel before the construction can continue; When modifying drawings or plans, it must be reported to the property management department in written form, and construction can only be started after approval; Otherwise, the illegal project must be stopped, and the illegal part will be restored to its original appearance, and the required expenses will be paid by the construction unit.
Four, strictly abide by the relevant provisions of the state "family planning" management. Construction units must strengthen the management and education of family planning for employees, do not recruit "three noes" and those who violate the provisions of family planning, and bear the responsibility for violating family planning.
Five, in the shopping mall construction, business hours shall not produce big dust, noise and pungent smell. If the above operations are required by the process, it is necessary to apply to the operation management department in advance and arrange the construction after the night closure.
Six, regularly clean up mud, waste, garbage, sewage, etc. Keep the site environment clean and tidy, do not urinate or urinate, dump sewage, dyes, garbage and sundries, and offenders will be fined 100 yuan/time, and be responsible for cleaning and repairing. If the sewer is blocked due to the above reasons, it will be responsible for all cleaning costs.
Take care of the public facilities of the building. When transporting materials and removing silt and garbage, public facilities such as freight elevators and stairs shall not be damaged, and compensation shall be paid for the damage according to the price. All decoration garbage and building materials must be placed in a safe place, avoiding being placed in high places, so as not to fall from high places and endanger passers-by.
Eight, in violation of safety operation procedures and tools and equipment accidents caused by casualties and fire accidents take full responsibility.
Nine, after the completion of the construction, close all the windows, water pipes and temporary power switches before leaving.
This letter of guarantee shall come into effect as of the date of project implementation, and shall naturally become invalid after the project is completed and accepted. If this guarantee is not returned in time, your construction project in Baiguang will be stopped immediately.
Project Owner: (Seal) Project Contracting Department: (Seal)
Person in charge: person in charge:
Year, month, sun, moon, sun.
Article 9 of safety guarantee Dear XX:
In order to ensure our health and safety in winter, have a healthy body and successfully complete our study tasks, I promise to do the following:
1. Don't skate or play in rivers, ponds, reservoirs and other waters without permission.
2, consciously abide by the traffic rules, pay attention to traffic safety. Don't ride on the road, don't chase cars.
3, don't play with fire, don't contact inflammable and explosive goods.
4. Don't touch electrical equipment casually, and don't fight.
5. Don't go into Internet cafes, smoke or drink.
6. Do not go out, stay or travel without parents' consent.
7, don't climb, don't enter the construction site and the danger zone.
in this regard
Salute!
xx
XXXX,XXXX,XX,XX
- Related articles
- What is the address of Chenwen Building in Wu Jia, Yinchuan?
- We all misunderstood property.
- My pension is not enough to buy meat! How serious is the inflation rate in Turkey?
- Reflections on Office Management
- I want to know what home-level exams are there in China in a year. (such as civil servants, accountants, medical practitioners, nurses, etc.). )
- How to deal with decoration and construction waste
- Will the stock market crash in Zheng Rong affect real estate?
- What does Huangpu Garden mean?
- What are the types of housing ownership area?
- What is the sales service hotline of Baoding Bolin Academy?