How does the property constrain the construction party?

Pay a certain entry deposit and conclude a contract, such as breaking things and changing the original design of the mall without authorization. And if the owner suffers losses due to the failure to meet the construction requirements, the corresponding amount will be deducted from the deposit, and the deposit can only be refunded after the owner's inspection is completed. Construction personnel must apply for entry permit before they can enter the site for construction. In fact, there are many ways to restrict the construction party. But it must be stipulated before the construction party enters the site, otherwise it will be very troublesome to fill in the formalities after entering the site.