Job Recruitment Website - Property management - How to accept the new house?
How to accept the new house?
Secondly, check whether the wall and the ground are flat. You'd better check it with a level.
Third, check whether the roof and walls are leaking. If this happens, it must be repaired before the house is closed.
Then check whether there is an empty drum on the wall. If there is an empty drum, it needs to be repaired, otherwise it will be done together when decorating.
Then check whether the tap water is normal and the water quantity is sufficient.
Check whether the sewer is unblocked, whether the drainage is normal and whether there is blockage.
Finally, check whether the power socket and the electric light are electrified normally.
Villa master provides you with local architectural policies, architectural drawings and villa design drawings;
Villa appearance rendering service, you can choose from thousands of red-hot drawings: www.bieshu.com? bdfc
- Previous article:Is Zhong 'an Ideal Bay a resettlement house?
- Next article:Green Block, Shaoxing District, Shi Lang
- Related articles
- Does the street office manage to grow vegetables on the roof of the community?
- What is the telephone number of Zhangzhou Hongguan Hanlin Capital Sales Center?
- Where is the green forest in Xuhui, Chongqing?
- I want to know what the quality management of property means.
- Monthly work summary of warehouse supervisor
- How to get to Chongqing Luneng Star City from Chongqing Yangfeng St. Jovis?
- What is the sales hotline of Huaiyin Xuyi Yujing Xingcheng?
- What is the surrounding environment of Lan Cheng Yulan Mansion? Is life convenient?
- Legal provisions on parking fees in old residential areas
- What about Lufeng Hengyuan Industrial Co., Ltd.?